References
- BEN–ARIEH , D. , and DRoR , M. , 1990 , Part assignment to electronic insertion machines: two machine case. International Journal of Production Research , 28 , 1317 – 1327 .
- BRANDOLESE , A. , GARETTI , M. , LANZA , C. , and POZZETTI , A. , 1988 , An algorithm for short term production planning of flexible assembly systems. Proceedings ofthe 3rd International Conference on Computer-Aided Production Engineering , Ann Arbor, Michigan , USA
- CARMON , T. F. , MAIMON , D. Z. , and DAREL , E. M. , 1989 , Group setup for print ed circuit board assembly. International Journal of Production Research , 27 , 1795 – 1810 .
- GARETTI , M. , LANZA , C. , and POZZETTI , A. , 1994 , An algorithm for the weekly production planning of flexible assembly systems. International journal of Computer Integrated Manufacturing, 7 , 249 – 259 .
- KUNG , H.–K. , and CHANGCHIT , C. , 1991 , Ajust-in-time simulation model of a PCB assembly line. Computers and Industrial Engineering , 20 , 17 – 26 .
- RATURI , A. S. , MEREDITH , J. , and VINEYARD , M. , 1987 , Heuristic part selection procedures for flexible manufacturing systems. Proceedings ofthe 9th International Conference on Production Research , Cincinnati , Ohio , USA .
- SALONNA , R. , 1990 , Scheduling and planning of electronics manufacturing operations: a case study of the MADEMA approach. International Journal of Computer Integrated Manufacturing , 3 , 343 – 353 .
- SUNDARAM , R. M. , and Yu , C. C. , 1990 , A scheduling strategy in the manufacture of print ed circuit boards (PCBs) using surface mount technology (SMT). Computers and Industrial Engineering , 19 , 47 – 52 .
- TAYLOR , D. , and GRAVES , R.J. , 1990 , An examination of routing flexibility for small batch assembly of primed circuit boards. International Journal of Production Research , 28 , 2117 – 2135 .
- WITTRocK , R. J. , 1985 , Scheduling algorithm for flexible flow lines. IBM JournalofResearch and Development , 29 , 401 – 412 .