Publication Cover
Production Planning & Control
The Management of Operations
Volume 7, 1996 - Issue 4
38
Views
3
CrossRef citations to date
0
Altmetric
Original Articles

A methodology for schedule compression

&
Pages 407-417 | Published online: 27 Apr 2007

References

  • BALL , M. , and MAGAZINE , M. , 1981 , The design and analysis of heuristics , Networks , 11 , 215 – 219 .
  • BIACKSTONE , J. H. , PHILLIPS , D. T. , and HOGG , G. L. , 1982 , A state-of-the-art sUlVey of dispatching rules for manufacturing job shop operations. International Journal of Production Research; , 20 , 27 – 45 .
  • CHANDRA , J. , and TALAVAGE , J. , 1991 , Intelligent dispatching for flexible manufacturing. International Journal ofProduction Research , 29 , 2259 – 2278 .
  • GASCON , A. , and LFACHMAN , R. C. , 1988 , A dynamic programming solution to the dynamic, multi-item, single-machine scheduling problem. Operations Research , 36 , 50 – 56 .
  • GOLORATT . E. M. , 1990 , The Haystack Syndrome , ( North River Press, Croton-on-Hudson , New York ).
  • HUTCHISON , J. , 1989 , Scheduling in random job shop type flexible manufacturing systems. PhD Dissertation, College of Business, University of Houston.
  • HUTCHISON , J. , LEONG , K. , SNYDER , D. , and WARD , P. , 1991 , Scheduling approaches for random job shop flexible manufacturing systems. International Journal ofProduction Research , 29 , 1053 – 1067 .
  • Liu , J. J. , 1990 , Optimal dispatching in a periodic review cellular manufacturing system. Operation Research , 38 , 893 – 901 .
  • MULLER–MERBACH , H. , 1981 , Heuristics and their design: a Sulvey. European Journal of Operational Research , 8 , 1 – 23 .
  • NORONHA , S. J. , and SARMA , V. V. S. , 1991 , Knowledge-based approaches for scheduling problems: a survey . IEEE Transactions on Knowledge and Data Engineering, 3 , 160 – 171 .
  • PEARL , J. , 1984 , Heuristics: Intelligent Search Strallgie.s for Compullr Problem sowing , ( Addision-Wesley, Cambridge , MA ).
  • PROUST , C. , GUPTA , J. N. D. , and DESCHAMPS , V. , 1991 , Flowshop scheduling with setup, processing and removal times separated. International Journal of Production Research , 29 , 479 – 493 .
  • SCHRAGENHEIM , E. , and RONEN , B. , 1990 , Drum-buffer-rope shop floor control. Production and irwentory Management Journal , 31 , 18 – 22 ,
  • SCHRAGENHEIM , E. , and RONEN , B. , 1991, Buffer management: a diagnostic tool for production control. Production and inventory Management Journal , 32, 74–79.
  • SHAW , M. J. , 1988 , A pattern-directed approach to FMS scheduling. Annals of Operations Research , 15 , 353 – 376 .
  • VAN DEVELDE , S. L. , 1990 , Minimizing the sum of the job completion times in the two-machine flow shop by Lagrangian relaxation. Annals of Operations Research , 26 , 257 – 268 .
  • Wu , H.–H. , and LI , R.–K. , 1994 , A new rescheduling method for computer-based schedule systems. International Journal of Production Research , (accepted).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.