1,718
Views
38
CrossRef citations to date
0
Altmetric
research

BIM adoption by public facility agencies: impacts on occupant value

, ORCID Icon &

References

  • Adriaanse, A., & Voordijk, H. (2002). Information richness in construction projects: A critical social theory. In D. Greenwood (Ed.), Proceedings 18th annual ARCOM conference, 2–4 September 2002 (Vol. 1, pp. 197–206). Northumbria, UK: Association of Researchers in Construction Management.
  • Ajzen, I., & Fishbein, M. (1980). Understanding attitudes and predicting social behaviour. Englewood Cliffs, NJ: Prentice-Hall.
  • Azhar, S. (2011). Building information modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leadership and Management in Engineering, 11(3), 241–252. doi:10.1061/(ASCE)LM.1943-5630.0000127
  • Azhar, S., Carlton, W. A., Olsen, D., & Ahmad, I. (2011). Building information modeling for sustainable design and LEED® rating analysis. Automation in Construction, 20(2), 217–224. doi:10.1016/j.autcon.2010.09.019
  • Barlish, K., & Sullivan, K. (2012). How to measure the benefits of BIM — A case study approach. Automation in Construction, 24, 149–159. doi:10.1016/j.autcon.2012.02.008
  • Bernstein, P. G., & Pittman, J. H. (2004). Barriers to the adoption of building information modeling in the building industry. Report. Autodesk Building Solutions, San Rafael, CA.
  • Box, R. C. (2015). Critical social theory in public administration. Taylor & Francis. Retrieved from https://books.google.co.il/books?id = Wn2sBwAAQBAJ
  • Bryde, D., Broquetas, M., & Volm, J. M. (2013). The project benefits of building information modelling (BIM). International Journal of Project Management, 31(7), 971–980. doi:10.1016/j.ijproman.2012.12.001
  • BSI. (2013). PAS 1192-2:2013. London: The British Standards Institution.
  • Building and Construction Authority. (2013, August). Singapore BIM guide version 2. Building and Construction Authority. Retrieved from https://www.corenet.gov.sg/integrated_submission/bim/BIM/Singapore%20BIM%20Guide_V2.pdf
  • Butler, D. L., & Sellbom, M. (2002). Barriers to adopting technology. Educause Quarterly, 2, 22–28.
  • Cabinet Office. (2011, May). Government construction strategy. Retrieved from https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/61152/Government-Construction-Strategy_0.pdf
  • Chen, C. C., Crandall, R. E., & Yu, Y.-C. (2005). Barriers to RFID adoption. Proceedings of the 10th Annual conference of Asia-Pacific Decision Sciences Institute, Collaborative Decision Making in the Internet Era, 28 June – 2 July, p. 6. Taipei, Taiwan.
  • Davis, F. D. (1986). A technology acceptance model for empirically testing new end-user information systems: Theory and results (PhD Thesis). MIT Sloan School of Management, Massachusetts Institute of Technology, Cambridge, MA.
  • Dawis, R. V., Lofquist, L. H., & Weiss, D. J. (1968). A theory of work adjustment: A revision. Minneapolis: Minnesota Studies in Vocational Rehabilitation: XXIII, Industrial Relations Center, Bulletin 47, University Of Minnesota.
  • Dossick, C. S., & Neff, G. (2010). Organizational divisions in BIM-enabled commercial construction. Journal of Construction Engineering and Management, 136(4), 459–467. doi:10.1061/(ASCE)CO.1943-7862.0000109
  • Eadie, R., Odeyinka, H., Browne, M., McKeown, C., & Yohanis, M. (2013). An analysis of the drivers for adopting building information modelling. Journal of Information Technology in Construction, 18, 338–352.
  • Eastman, C. M., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM handbook: A guide to building information modeling of owners, managers, designers, engineers and contractors (2nd ed.). Hoboken, NJ: Wiley.
  • Eisenhardt, K. M. (1989). Building theories from case study research. Academy of Management Review, 14(4), 532–550.
  • Fellows, R. F., & Liu, A. M. (2015). Research methods for construction. Oxford: Wiley.
  • Gao, J., & Fischer, M. (2008). Framework and case studies comparing implementations and impacts of 3D/4D modeling across projects. Stanford University. Retrieved from http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.466.4427&rep=rep1&type=pdf
  • Goodhue, D. L., & Thompson, R. L. (1995). Task-technology fit and individual performance. MIS Quarterly, 19(2), 213–236. doi:10.2307/249689
  • Habermas, J. (1984). The theory of communication action: Reason and rationalization of society (1). Boston: Beacon Press.
  • Harty, C. (2008). Implementing innovation in construction: Contexts, relative boundedness and actor-network theory. Construction Management and Economics, 26(10), 1029–1041. doi:10.1080/01446190802298413
  • Ioannidis, D., Krinidis, S., Stavropoulos, G., Tzovaras, D., & Likothanassis, S. (2014). Full-automated acquisition system for occupancy and energy measurement data extraction. In J. D. Gerber & R. Goldstein (Eds.), Proceedings of the symposium on simulation for architecture & urban design (p. 15). Tampa, FL: Society for Computer Simulation International.
  • Ive, G., Murray, A. & Marsh, R. (2015). Cost and value ratios of operating renewed English secondary schools. Building Research & Information, 43(4), 465–485. doi:10.1080/09613218.2015.1021143
  • Jung, Y., & Joo, M. (2011). Building information modelling (BIM) framework for practical implementation. Automation in Construction, 20(2), 126–133. doi:10.1016/j.autcon.2010.09.010
  • Kjartansdóttir, I. B. (2012). BIM adoption in Iceland and its relation to lean construction – B. Retrieved from http://skemman.is/stream/get/1946/10907/26324/1/Ingibj%C3%B6rgBirnaKj.Tilb%C3%BAi%C3%B0040112.pdf
  • Ku, K., & Taiebat, M. (2011). BIM experiences and expectations: The constructor’s perspective. International Journal of Construction Education and Research, 7(3), 175–197. doi:10.1080/15578771.2010.544155
  • Lee, S., Yu, J., & Jeong, D. (2015). BIM acceptance model in construction organizations. Journal of Management in Engineering, 31(3), 04014048. doi:10.1061/(ASCE)ME.1943-5479.0000252
  • Lehtinen, T. (2012). Increasing integration in construction projects: A case study on a PPP project adopting BIM. In G. Gudnason & R. Scherer (Eds.), eWork and eBusiness in architecture, engineering and construction: ECPPM 2012. In 9th European conference on products and process modelling, July 25–27th 2012 (pp. 439–446). Reykjavik, Iceland: CRC Press.
  • Lorch, R. (2012). BIM and the public interest. Building Research & Information, 40(6), 643–44. doi:10.1080/09613218.2012.743860
  • Matta, C., Kam, K., & Graves, T. (2007). GSA BIM guide series 01. The National 3D-4D-BIM Program, Office of the Chief Architect, Public Buildings Service. Retrieved from http://www.gsa.gov/graphics/pbs/GSA_BIM_Guide_v0_60_Series01_Overview_05_14_07.pdf
  • Miettinen, R., & Paavola, S. (2014). Beyond the BIM utopia: Approaches to the development and implementation of building information modeling. Automation in Construction, 43, 84–91. doi:10.1016/j.autcon.2014.03.009
  • Mitropoulos, P., & Tatum, C. B. (1999). Technology adoption decisions in construction organizations. Journal of Construction Engineering and Management, 125(5), 330–338. doi:10.1061/(ASCE)0733-9364(1999)125:5(330)
  • Morlhon, R., Pellerin, R., & Bourgault, M. (2015). Defining building information modeling implementation activities based on capability maturity evaluation: A theoretical model. International Journal of Information Systems and Project Management, SciKA-Association for Promotion and Dissemination of Scientific Knowledge, 3(1), 51–65.
  • Ngwenyama, O. K. (1991). The critical social theory approach to information systems: Problems and challenges. In H. E. Nissen, H. K. Klein, & R. A. Hirschheim (Eds.), Information systems research: Contemporary approaches and emergent traditions (pp. 267–280). Amsterdam: North Holland.
  • Ozturk, Z., Arayici, Y., & Coates, S. (2012). Post occupancy evaluation (POE) in residential buildings utilizing BIM and sensing devices: Salford energy house example. Retrofit 2012. Salford Quays, Greater Manchester. Retrieved from http://usir.salford.ac.uk/id/eprint/20697
  • Preiser, W. F. E. (1995). Post-occupancy evaluation: How to make buildings work better. Facilities, 13(11), 19–28. doi:10.1108/02632779510097787
  • Preiser, W. F. E. (2002). The evolution of post-occupancy evaluation: Toward building performance and universal design evaluation. In Learning from our buildings: A state-of-the-practice summary of post-occupancy evaluation (p. 138). Federal Facilities Council, Board on Infrastructure and the Constructed Environment, National Research Council, National Academies Press. Retrieved from https://books.google.co.il/books?id = skhwiYaAw4kC
  • Ramakrishnan, S., & Testani, M. (2012). A methodology to assess an organization’s lean readiness for change. In IIE annual conference. Proceedings (pp. 1–9). Springfield, MO: Institute of Industrial Engineers.
  • Rezgui, Y., Zarli, A., & Hopfe, C. J. (2009). Editorial-building information modeling applications, challenges and future directions. Journal of Information Technology in Construction, 14, 613–616.
  • Sacks, R., & Barak, R. (2008). Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice. Automation in Construction, 17, 439–449. doi:10.1016/j.autcon.2007.08.003
  • Senate Properties. (2012). Common BIM requirements series. Senate Properties. Retrieved from http://www.en.buildingsmart.kotisivukone.com/3
  • Sizemore, G. L. (2010). BIM implementation: An owner’s guide to getting started (p. 48).
  • Smits, W., van Buiten, M., & Hartmann, T. (2016). Yield-to-BIM: Impacts of BIM maturity on project performance. Building Research & Information, June, 1–11. doi:10.1080/09613218.2016.1190579
  • Statsbygg BIM Manual 1.2.1. (2013, December 17 ). Retrieved from www.statsbygg.no/bim.
  • Succar, B., Sher, W., & Williams, A. (2013). An integrated approach to BIM competency assessment, acquisition and application. Automation in Construction, 35, 174–189. doi:10.1016/j.autcon.2013.05.016
  • Tiejten, R. (2010, April). The VA BIM guide. Department of Veterans affairs. Retrieved from http://www.cfm.va.gov/til/bim/BIMguide/downloads/VA-BIM-Guide.pdf
  • Underwood, J. (2009). Handbook of research on building information modeling and construction informatics: Concepts and technologies: Concepts and technologies. Information Science Reference. Retrieved from https://books.google.co.il/books?id = X6cQ5BafJgwC
  • USC. (2012, April 18). University of Southern California building information modeling (BIM) guidelines version 1.6 for design bid build contracts. USC Capital Construction Development and Facilities Management Services. Retrieved from http://facilities.usc.edu/uploads/documents/cas/BIMGuidelines_VS1_6_2012.pdf
  • Venkatesh, V., & Bala, H. (2008). Technology acceptance model 3 and a research agenda on interventions. Decision Sciences, 39(2), 273–315. doi:10.1111/j.1540-5915.2008.00192.x
  • Venkatesh, V., & Davis, F. D. (2000). A theoretical extension of the technology acceptance model: Four longitudinal field studies. Management Science, 46(2), 186–204. doi:10.1287/mnsc.46.2.186.11926
  • Wong, K., & Fan, Q. (2013). Building information modelling (BIM) for sustainable building design. Facilities, 31(3/4), 138–157. doi:10.1108/02632771311299412

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.