References
- Beng D M C. Reasons for Delay in Civil Engineering Projects as the Case of Hong Kong. Hkie Transactions, 1996, 2(3):1–8.
- Sambasivan M, Soon Y W. Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 2007, 25(5):517–526. doi: 10.1016/j.ijproman.2006.11.007
- Wang Y T, Zhang K, Feng J C, et al. Penalty Model for Delay of Construction Period Based on the Sub-networks from the Perspective of Programs. Operations Research & Management Science, 2017.
- Yang Y H, Lu J J. Delay analysis methods for middle route of south-to-north water diversion engineering. Water Resources and Power, 2017(2), 157–160.
- Wang J Y, Shen L Y. Study on risks of time delay in the execution of public sector projects. Journal of Shenzhen University Science & Engineering, 2006, 23(4):303–308.
- Jiang R C, Jiang X J, Gu S X. Current status and counter0measures for existing problems in mountain torrent disaster prevention and control in Yunnan Province. Journal of Information and Optimization Sciences, 2017, 38(7):1169–1179. doi: 10.1080/02522667.2017.1367499
- Xie W, Cai X, Zhang Y R, Li Y Y, Gu S X. Flood control practices on small-medium rivers in Yunnan, Chia. Journal of Information and Optimization Sciences, 2017, 38(7):1229–1242. doi: 10.1080/02522667.2017.1367504
- Qin Y P. Main problems and proposals for suburban railway planning and construction in some Chinese cities. Journal of Railway Engineering Society, 2014(3):6–13.
- Duan X C, Zhang X N, Kong W C, et al. Study of virtual dynamic optimization management technology on construction time and cost of subway project. Tiedao Xuebao/ journal of the China Railway Society, 2015, 37(5):101–106.