14
Views
0
CrossRef citations to date
0
Altmetric
Original Articles

雙機流程型工廠動態排程之研究

Two-machine flowshop dynamic scheduling problem

&
Pages 315-324 | Received 01 Sep 1996, Accepted 01 Jun 1997, Published online: 30 Mar 2012

References

  • Baker , K. R. (1974) . Introduction to Sequencing and Scheduling , New York : John Wiley .
  • Church , L. K. and Uzsoy , R. (1992) . Analysis of periodic and event-driven rescheduling policies in dynamic shops . International Journal of Computer Integrated Manufacturing , 5 : 153 – 163 .
  • Croce , F. D. , Narayan , V. and Tadei , R. (1996) . The two-machine total completion time flow shop problem . European Journal of Operational Research , 90 : 227 – 237 .
  • French , S. (1982) . Sequencing and Scheduling: An Introduction to the Mathematics of the Job-Shop , Chichester : Ellis Horwood .
  • Gonzalez , T. , Sahni , S. , Hoogeveen , J. A. and Van De Velde , S. L. (1978) . Flowshop and jobshop schedules: complexity and approximation . Operations Research , 26 : 36 – 52 . 195 – 208 .
  • Ignall , E. and Schrage , L. E. (1965) . Application of the branch and bound technique to some flowshop scheduling problems . Operations Research , 13 : 400 – 412 .
  • Johnson , S. M. (1954) . Optimal two and three stage production schedules with setup times included . Naval Research Logistics Quarterly , 1 : 61 – 68 .
  • Nagar , A. , Heragu , S. S. and Haddock , J. (1995) . A branch and bound approach for a two-machine flowshop scheduling problem . Journal of the Operational Research Society , 46 : 721 – 734 .
  • Nagar , A. , Heragu , S. S. and Haddock , J. (1996) . A combined branch and bound and genetic algorithm based approach for a flowshop scheduling problem . Annals of Operations Research , 63 : 397 – 414 .
  • Rajendran , C. (1992) . Two-stage flowshop scheduling problem with bicriteria . Journal of the Operational Research Society , 43 : 871 – 884 .
  • Roy , U. and Zhang , X. (1996) . A heuristic approach to n/m job shop scheduling: fuzzy dynamic scheduling algorithms . Production Planning & Control , 7 : 299 – 311 .
  • Selen , W. J. and Hott , D. (1986) . A mixed integer goal programming formulation of the standard flowshop scheduling problem . Journal of the Operational Research Society , 37 : 1121 – 1128 .
  • Sun , D. and Lin , L. (1994) . A dynamic job shop scheduling framework: a backward approach . International Journal of Production Research , 32 : 967 – 985 .
  • Van De Velde , S. L. (1990) . Minimizing the sum of job completion times in the two-machine flow shop by Lagrangian relaxation . Annals of Operations Research , 26 : 257 – 268 .
  • Wilson , J. M. (1989) . Alternative formulations of a flowshop scheduling problem . Journal of the Operational Research Society , 40 : 395 – 399 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.