References
- Barry , S. , Evans , G. and Mollaghasemi , M. 1991 . “Comparison of Global search methods for design optimization using simulation” . In Proceeding of the 1991 Winter Simulation Conference 937 – 943 .
- Chang , F. C. 1996 . “A study of due-date assignment rules with constrained tightness in a dynamic job shop” . Computers & Industrial Engineering , 31 : 205 – 208 .
- Hector , H. G. and Gray , M. K. 1988 . “How to more effectively accept and refuse orders” . Production and Inventory Management , 29 : 59 – 63 .
- Jha , N. K. 1996 . “Probabilistic cost estimation in advance of production in a computerized manufacturing system through stochastic geometric programming” . Computers & Industrial Engineering , 30 : 809 – 821 .
- Kate , H. A. ten. 1994 . “Towards a better understanding of order acceptance” . International Journal of Production Economics , 37 : 139 – 152 .
- Koulamas , C. , Antony , S. and Jaen , R. 1994 . “A survey of simulated annealing applications to operations research problems” . Omega , 22 : 41 – 56 .
- Liao , C. J. 1992 . “Optimal control of jobs for production systems” . Computers & Industrial Engineering , 22 : 163 – 169 .
- Ogbu , F. A. and D. K. Smith . 1990 . “The application of simulated annealing algorithm to the solution of the n/m/c max flow shop problem” . Computers and Operations Research , 17 : 243 – 253 .
- Park , M. and Kim , Y . 1998 . “A systematic procedure for setting parameters in simulated annealing algorithms” . European Journal of Operational Research , 25 : 207 – 217 .
- Philipoom , P. R. and Fry , T. D. 1992 . “Capacity-based order review/release strategies to improve manufacturing performance” . International Journal of Production Research , 30 : 2559 – 2572 .
- Raghu , T. S. and C. Rajendran . 1995 . “Due-date setting methodologies based on simulated annealing-an experimental study in a real-life job shop” . International Journal of Production Research , 33 : 2535 – 2554 .
- Wu , M. C. and Chen , S. Y. 1996 . “A cost model for justifying the acceptance of rush orders” . International Journal of Production Research , 34 : 1963 – 1974 .
- Yang , K. K. and Sum , C. C. 1994 . “A comparison of job shop dispatching rules using a total cost criterion” . International Journal of Production Research , 32 : 807 – 820 .