References
- Bartusch , M , Möhring , R and Radermacher , F . 1988 . Scheduling project networks with resource constraints and time windows . Annals of the Operations Research , 16 : 199 – 240 .
- Brucker , P , Drexl , A , Möhring , R , Neumann , K and Pesch , E . 1999 . A survey of variants and extensions of the resource-constrained project scheduling problem . European Journal of the Operational Research , 112 : 3 – 41 .
- Europa-PSO, Available online at: code.google.com/p/europa-pso/ (accessed May 20, 2010).
- Grabarnik, G., L. Kozakov, V. Lemberg, I. Rish and L. Shwartz, “GRID resource consumption estimates and planning,” Proceedings of the Third International Conference on Autonomic and Autonomous Systems (ICAS '07), Jun.19–25, Athens, Greece, 40–54 (2007).
- Graham , RL , Lawler , EL , Lenstra , JK , Kan , AH and Rinnooy , G . 1979 . Optimization and approximation in deterministic sequencing and scheduling: a survey . Annals of Discrete Mathematics , 4 : 287 – 326 .
- Hartmann , S and Briskorn , D . 2010 . A survey of variants and extensions of the resource-constrained project scheduling problem . European Journal of the Operational Research , 207 : 1 – 14 .
- Hoos , H and Sttzle , T . 2004 . Stochastic Local Search: Foundations and Applications , CA : Morgan Kaufmann Publishers Inc. .
- IT Infrastructure Library (ITIL) version 3. Available online at: www.ogc.gov.uk/ (accessed May 20, 2010).
- Keller, A., J.L. Hellerstein, J.L. Wolf, K.L. Wu and V. Krishnan, “The CHAMPS system: change management with planning and scheduling,” Proceedings of the IEEE/IFIP Network Operations and Management Symposium (NOMS 2004), Apr.20–23, Seul, South Korea, 395–408 (2004).
- Oddi , A , Cesta , A , Policella , N and Smith , S . 2010 . Iterative flattening search for resource constrained scheduling . Journal of the Intelligent Manufacturing , 21 : 17 – 30 .
- RCPSP Benchmark, Available online at: www.wior.unikarlsruhe.de/LSNeumann/Forschung/ProGenMax/rcpspmax.html (accessed May 20, 2010).