160
Views
1
CrossRef citations to date
0
Altmetric
Original Articles

A simulation optimisation tool for planning of low-income housing projects

, , &
Pages 51-63 | Received 24 May 2012, Accepted 15 Feb 2013, Published online: 30 Oct 2013

References

  • AbouRizk, S. M., and D. Hajjar. 1998. “A Framework for Applying Simulation in Construction.” Canadian Journal of Civil Engineering 25 (3): 604–617. doi: 10.1139/l97-123
  • Abraham, D. M., and D. W. Halpin. 1993. “Simulation of the Construction of Cable-Stayed Bridges.” Canadian Journal of Civil Engineering 25 (3): 490–499. doi: 10.1139/l97-109
  • Adeli, H., and A. Karim. 1997. “Scheduling/Cost Optimization and Neural Dynamics Model for Construction.” Journal of Construction Engineering and Management 123 (4): 450–458. doi: 10.1061/(ASCE)0733-9364(1997)123:4(450)
  • El-Rayes, K., and A. Kandil. 2005. Time–Cost–Quality Trade-Off Analysis for Highway Construction.” Journal of Construction Engineering and Management 131 (4): 477–486. doi: 10.1061/(ASCE)0733-9364(2005)131:4(477)
  • El-Rayes, K., and O. Moselhi. 2001. “Optimizing Resource Utilization for Repetitive Construction Projects.” Journal of Construction Engineering and Management 127 (1): 18–26. doi: 10.1061/(ASCE)0733-9364(2001)127:1(18)
  • Halpin, D. W., and L. S. Riggs. 1992. Planning and Analysis of Construction Operations. New York, NY: John Wiley & Sons, Inc.
  • Huang, R. Y., A. M. Grigoriadis, and D. W. Halpin. 1994. “Simulation of Cable-Stayed Bridges Using Disco.” Proceedings of WSC94 winter simulation conference, Orlando, FL, 1130–1136.
  • Li, H., and P. Love. 1997. “Using Improved Genetic Algorithms to Facilitate Time–Cost Optimization.” Journal of Construction Engineering and Management 123 (3): 233–237. doi: 10.1061/(ASCE)0733-9364(1997)123:3(233)
  • Martinez, J. C. 1996. “STROBOSCOPE – State and Resource Based Simulation of Construction Process.” PhD thesis, University of Michigan, US.
  • Marzouk M. 2010. “The State of Computer Simulation Applications in Construction.” In Handbook of Research on Discrete Event Simulation Environments: Technologies and Applications, edited by E. M. O. Abu Taieh, A. A. El Sheikh, 509–534. Hershey, PA: IGI Global.
  • Marzouk, M., and O. Moselhi. 2003. “An Object Oriented Model for Earthmoving Operations.” Journal of Construction Engineering and Management 129 (2): 173–181. doi: 10.1061/(ASCE)0733-9364(2003)129:2(173)
  • Marzouk, M., O. Omar, M. Abdel Hamid, and M. El-Said. 2010. “An Optimization Algorithm for Simulation-Based Planning of Low Income Housing Projects.” Journal of Advanced Research (JAR) 1 (4): 291–300. doi: 10.1016/j.jare.2010.06.002
  • Marzouk, M., H. Said, and M. El-Said. 2009. “Framework for Multiobjective Optimization of Launching Girder Bridges.” Journal of Construction Engineering and Management 135 (8): 791–800. doi: 10.1061/(ASCE)0733-9364(2009)135:8(791)
  • Mattila, K. G., and D. M. Abraham. 1998. “Resource Leveling of Linear Schedules Using Integer Linear Programming.” Journal of Construction Engineering and Management 124 (3): 232–243. doi: 10.1061/(ASCE)0733-9364(1998)124:3(232)
  • Omar, O. 2009. “A Framework for Planning and Optimizing Low-Income Housing Projects using Computer Simulation.” MSc thesis, Cairo University, Egypt.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.