- Akintoye, A. S., and M. J. Macleod. 1997. “Risk Analysis and Management in Construction.” International Journal of Project Management 15 (1): 31–38. doi: 10.1016/S0263-7863(96)00035-X
- Al-Zahrani, S. n.d. The Systems Approach. Accessed January 5, 2013. http://www.google.co.nz/url?sa=t&rct=j&q=&esrc=s&source=web&cd=1&ved=0CGAQFjAA&url=http%3A%2F%2Fwww.dr-saleh.com%2Fis%2FLinkClick.aspx%3Ffileticket%3DKtKZZqr5izI%253D%26tabid%3D56%26mid%3D384&ei=B8AQUOTrA-uaiQeC24CIBg&usg=AFQjCNFvdtLsWBhp4W_ZyEJMAMv3KKrgdw&sig2=5F-S_ZT4YFnZ7CJrtE6pyA.
- Arashpour, M., R. Wakefield, N. Blismas, and E. W. M. Leeb. 2014. “Framework for Improving Workflow Stability: Deployment of Optimized Capacity Buffers in A Synchronized Construction Production.” Canadian Journal of Civil Engineering 41 (12): 995–1004. doi: 10.1139/cjce-2014-0199
- Belassi, W. and O. I. Tukel. 1996. “A new Framework for Determining Critical Success/Failure Factors in Projects.” International Journal of Project Management 14 (3): 141–151. doi: 10.1016/0263-7863(95)00064-X
- Bernardo, J. M. 2003. Bayesian Statistics. Accessed February 5, 2013. http://www.uv.es/bernardo/BayesStat.pdf.
- Bourne, L. 2007. Avoiding the Successful Failure. Accessed February 5, 2013. http://www.mosaicproject.com.au/PDF_Papers/P046_Successful_Failure.pdf.
- Chartered Institute of Building. 2009. CMYA Awards 2009 - Categories. Accessed May 20, 2015. http://www.construction-manager.co.uk/features/cmya-awards-2009-categories/.
- Chartered Institute of Building. 2010a. The Construction Manager of the Year 2010 and Gold: New Build / Refurbishment Projects over £40m to £60m. Accessed December 12, 2012. http://www.cmya.co.uk/Winner/2010/538.
- Chartered Institute of Building. 2010b. Gold: New Build / Refurbishment Projects over £26m to £40m. Accessed December 12, 2012. http://www.cmya.co.uk/Winner/2010/529.
- Chartered Institute of Building. 2010c. Silver: Housing / Accommodation Projects over £6m. Accessed December 12, 2012. http://www.cmya.co.uk/Winner/570.
- Chartered Institute of Building. 2010d. Silver: New Build / Refurbishment Projects £4m to £7m. Accessed December 12, 2012. http://www.cmya.co.uk/Winner/603.
- Chartered Institute of Building. 2011a. Gold: New Build / Refurbishment Projects £11m to £17m. Accessed December 12, 2012. http://www.cmya.co.uk/Winner/616.
- Chartered Institute of Building. 2011b. Gold: New Build/Refurbishment Projects over 8m to 14m. Accessed December 12, 2012. http://www.cmya.co.uk/Winner/2010/492.
- CIOB. 2010. Construction Manager of the Year: Entry Form. Accessed December 20, 2012. http://www.cmya.co.uk/Enter.
- Clough, R. H., G. A. Sears, and S. K. Sears. eds. 2008. Construction Project Management. New Jersy: John Wiley & Sons.
- Cottrell, W. D. 1999. “Simplfied Program Evaluation and Review Technique.” Journal of Construction Engineering and Management 125 (1): 16–22. doi: 10.1061/(ASCE)0733-9364(1999)125:1(16)
- Dias, W. P. S. 2002. “Reflective Practice, Artificial Intelligence, and Engineering Design: Common Trends and Interrelationships.” Artificial Intelligence for Engineering Design, Analysis and manufacturing 16: 261–271. doi: 10.1017/S0890060402164018
- Dias, W. P. S., and D. I. Blockley. 1995. “Reflective Practice in Engineering Design.” ICE Proceedings on Civil Engineering 108: 160–168. doi: 10.1680/icien.1995.28038
- Dijksterhuis, A., and L. F. Nordgren. 2006. “A Theory of Unconscious Thought.” Perspectives of Psychological Science 1 (2): 95–109. doi: 10.1111/j.1745-6916.2006.00007.x
- Fallah, M., B. Ashtiani, and M. B. Aryanezhad. 2010. “Critical Chain Project Scheduling: Utilizing Uncertainty for Buffer Sizing.” International Journal of Research and Review for Applied Science 3 (3): 280–283.
- Fryer, B. 2004. The Practice of Construction Management. Oxford: Blackwell publishing.
- Ganaway, N. eds. 2006. Construction Business Management. Oxford: Butterworth-Heinemann.
- Jones, M., J. Meyer, and D. Flanagan. 2009. Emerging Earned Value Management Technique: Earned Schedule. Accessed March 20, 2013. http://www.earnedschedule.com/Docs/Emerging%20EVM%20Technique,%20Earned%20Schedule.pdf.
- Kinsella, E. A. 2007. “Technical Rationality in Schön's Reflective Practice: Dichotomous or non-Dualistic Epistemological Position.” Nursing Philosophy 8: 102–113. doi: 10.1111/j.1466-769X.2007.00304.x
- Lee, S., F. Peña-Mora, and M. Park. 2006. “Reliability and Stability Buffering Approach: Focusing on the Issues of Errors and Changes in Concurrent Design and Construction Projects.” Journal of Construction Engineering and Management 132 (5): 452–464. doi: 10.1061/(ASCE)0733-9364(2006)132:5(452)
- Long, L. D., and A. Ohsato. 2007. “Fuzzy Critical Chain Method for Project Scheduling Under Resource Constraints and Uncertainty.” International Journal of Project Management 26: 688–698. doi: 10.1016/j.ijproman.2007.09.012
- Lu, M., and H.-C. Lam. 2008. “Critical Path Scheduling Under Resource Calendar Constraints.” Jouranl of Construction Engineering and Mangement 134 (1): 25–30. doi: 10.1061/(ASCE)0733-9364(2008)134:1(25)
- Mensi, W. 2010. “Construction Scheduling using Critical Path Analysis with Separate Time Segments.” PhD diss., University of Waterloo.
- PWC. 2013. SA construction. Accessed May 20, 2015. www.pwc.co.za/construction.
- Ramanayaka, C. 2013. “Developing a Strategy-led Approach as a Methodology to Plan and Implement Construction Projects.” PhD diss., Auckland University of Technology.
- Ramanayaka, C., and J. Rotimi. 2011. “Strategy: Towards its Applicability for Successful Project Delivery.” Paper presented at the annual meeting for the Association of Researchers in Construction Management, Bristol, September 03–05.
- Rand, G. K. 2000. “Critical Chain: The Theory of Constraints Applied to Project Management.” International Journal of Project Management 18: 173–177. doi: 10.1016/S0263-7863(99)00019-8
- Schon, D. 1992. “The Thory of Inquiry: Dewey's Legacy to Education.” Curriculum Inquiry 22 (2): 119–139. doi: 10.2307/1180029
- Schon, D. 2001. “The Crisis of Professional Knowledge and the Pursuit of an Epistemology of Practice.” In Competence in the Learning Society, edited by J. Raven and J. Stephenson, 185–207. New York: Peter Lang.
- USAID. n.d. Earned Value Management. Accessed March 17, 2013. http://www.usaid.gov/our_work/economic_growth_and_trade/info_technology/tech_series/EVM_508.pdf.
- Walker, A. eds. 2007. Project Management in Construction. Oxford: Blackwell Publishing.
- Winch, G. M. eds. 2010. Managing Construction Projects. Singapore: Blackwell Publishing.
- Wong, J. M. W., and T. S. Ng. 2010. “Company Failure in the Construction Industry: A Critical Review and a Future Research Agenda.” Paper presented at at the fig Congress, Sydney, April 11–16.
- Yang, J. B. 2003. “Applying the Theory of Constraints to Construction Scheduling.” System Based Vision for Strategic and Creative Design 13: 175–180.
- Yin, R. K. 2003. “Introduction.” Chap. 1. In Case Study Research: Design and Methods. Thousand Oaks: SAGE Publications.
- Zhao, Z. Y., W. Y. You and J. Zuo. 2010. “Application of Innovative Critical Chain Method for Project Planning and Control Under Resource Constraints and Uncertainty.” Journal of Construction Engineering and Management 136 (9): 1056–1060. doi: 10.1061/(ASCE)CO.1943-7862.0000209