305
Views
42
CrossRef citations to date
0
Altmetric
Original Articles

A Multilevel Framework for Lean Product Development System Design

, &
Pages 69-85 | Published online: 20 Apr 2015

  • Adler, P.S., A. Mandelbaum, V. Nguyen, and E. Schwerer, “Getting the Most Out of Your Product Development Process,” Harvard Business Review, 74:2 (1996), pp. 134–147.
  • Ainscough, M.S., and B. Yazdani, “Concurrent Engineering Within the British Industry,” Proceedings of Advances in Concurrent Engineering (1999), pp. 443–48.
  • Akao, Y., Quality Function Deployment: Integrating Customer Requirements Into Product Design, Productivity Press (1990).
  • Atwater, J.B., V.R. Kannan, and A.A. Stephens, “Cultivating Systemic Thinking in the Next Generation of Business Leaders,” Academy of Management Learning and Education, 7:1 (2008), pp. 9–25.
  • Baines, T., H. Lightfoot, G.M. Williams, and R. Greenough, “State-of-the-Art in Lean Design Engineering: A Literature Review on White Collar Lean,” Proceedings of the Institution of Mechanical Engineers, 220(B) (2006), pp. 1539–1547.
  • Ballé, F., M. Ballé, “Lean Development,” Business Strategy Review, 16:3 (2005), pp. 17–22.
  • Barclay, I., “Organizational Factors for Success in New Product Development,” Science, Measurement, and Technology, IEE Proceedings, 149:2 (2002), pp. 105–112.
  • Barczak, G., K.B. Kahn, and R. Moss, “An Exploratory Investigation of NPD Practices in Nonprofit Organizations,” The Journal of Product Innovation Management, 23:6 (2006), pp. 512–527.
  • Browning, T., “On Customer Value and Improvement in Product Development Processes,” Systems Engineering, 6:1 (2003), pp. 49–61.
  • Checkland P., Systems Thinking, Systems Practice, Wiley (1981).
  • Cooper, R.G., “Perspective: The Stage-Gate® Idea-to-Launch Process - Update, What's New, and NexGen Systems,” The Journal of Product Innovation Management, 25:3 (2008), pp. 213–232.
  • Cooper, R.G., and S.J. Edgett, Lean, Rapid and Profitable New Product Development, Product Development Institute, www.stage-gate.com.
  • Cooper, R.G., and S.J. Edgett, “Maximizing Productivity in Product Innovation,” Research Technology Management, 51:2 (2008), pp. 47–58.
  • Cooper, R.G., S.J. Edgett, and E.J. Kleinschmidt, “Benchmarking Best NPD Practices,” Research Technology Management, 47:1 (2003-2004), Nov-Dec, 31–43; May-June, 50–59; Nov-Dec, pp. 43–45.
  • Cusumano, M.A., and K. Nobeoka, Thinking Beyond Lean: How Multi-Project Management Is Transforming Product Development at Toyota and Other Companies, Free Press (1998).
  • Edwards, M.G., “The Integral Holon: A Holonomic Approach to Organisational Change and Transformation,” Journal of Organizational Change Management, 18:3 (2005), pp. 269–288.
  • Eisenhardt, K.M., “Building Theories from Case Study Research,” Academy of Management Review, 14:4 (1989), pp. 532–550.
  • Farris, J.A., R.L. Groesbeck, E.M. Van Aken, and G. Letens, “Evaluating the Relative Performance of Engineering Design Projects: A Case Study Using Data Envelopment Analysis,” IEEE Transactions on Engineering Management, 53:3 (2006), pp. 471–481.
  • Forrester, J.W., World Dynamics, Pegasus Communications (1971).
  • Goldratt, E.M., Critical Chain, North River Press Publishing Corporation (1997).
  • Haque, B., and M. James-Moore, “Applying Lean Thinking to New Product Introduction,” Journal of Engineering Design, 15:1 (2004a), pp. 1–31.
  • Haque, B., and M. James-Moore, “Measures of Performance for Lean Product Introduction in the Aerospace Industry,” Proceedings of the Institution of Mechanical Engineers, 218:B (2004b), pp. 1387–1398.
  • Heroelen, W., R. Leus, and E. Demeulemeester, “Critical Chain Project Scheduling: Do Not Oversimplify,” Project Management Journal, 33:4 (2002), pp. 48–60.
  • Hines, P., M. Francis, M., and P. Found, “Towards Lean Product Lifecycle Management: a Framework for New Product Development,” Journal of Manufacturing Technology Management, 17:7 (2006), pp. 866–887.
  • Hines, P., M. Holwe, N. Rich, “Learning to Evolve: A Review of Contemporary Lean Thinking,” International Journal of Operations and Production Management, 24:9/10 (2004), pp. 994–1011.
  • House, R., D.M. Rousseau, and M. Thomas-Hunt, “The Meso Paradigm: A Framework for Integration of Micro and Macro Organizational Behavior,” in Research in Organizational Behavior, L. L. Cummings and B. Staw (eds.), JAI Press (1995), pp. 71–114.
  • ISO/IEC 15288, Systems Engineering - System Life Cycle Processes, International Organization for Standardization (2002).
  • Jiménez-Zarco, Martínez-Ruíz, and González-Benito, “Performance Measurement System Integration into New Product Innovation: A Literature Review and Conceptual Framework,” Academy of Marketing Science Review, 9 (2006), available at http://www.amsreview.org/articles/zarco09-2006.pdf
  • Kahn, B.K., B. Barczak, and R. Moss, “Dialogue on Best Practices in New Product Development - PERSPECTIVE: Establishing an NPD Best Practices Framework,” The Journal of Product Innovation Management, 23:2 (2006), pp. 106–116.
  • Karlsson, C., and P. Ahlstrom, “The Difficult Path to Lean Product Development,” Journal of Product Innovation Management, 13:4 (1996), pp. 283–295.
  • Kennedy, M., Product Development for the Lean Enterprise: Why Toyota's System is Four Times More Productive and How You Can Implement it, The Oaklea Press (2003).
  • Koestler, A., The Ghost in the Machine, Arkana (1967).
  • Lane, D.C., and R. Olivia, “The Greater Whole: Towards a Synthesis of Systems Dynamics and Soft Systems Methodology,” European Journal of Operational Research, 107:1 (1998), pp. 214–235.
  • Leach, L., Critical Chain Project Management, Artech House Professional Development Library (2000).
  • Lechler, T.G., B. Ronen, and E.A. Stohr, “Critical Chain: a New Project Management Paradigm or Old Wine in New Bottles,” Engineering Management Journal, 17:4 (2005), pp. 45–58.
  • Liker, J.M., The Toyota Way, McGrawhill (2004).
  • Liker, J.K., and J.M. Morgan, “The Toyota Way in Services: the Case of Lean Product Development,” Academy of Management Perspectives, 20:2 (2006), pp. 5–20.
  • Martinez, C., and J.A. Farris, “Lean Product Development: A Systematic Literature Review,” Proceedings of the IERC 2009, Engineering Management Track, Session Innovation and Product Development.
  • Mascitelli, R. The Lean Product Development Guidebook: Everything your Design Team Needs to Improve Efficiency and Slash Time-to-Market, Technology Perspectives (2007).
  • Maylor, H., “Concurrent New Product Development: an Empirical Assessment,” International Journal of Operations and Production Management, 17:12 (1997), pp. 1196–1214.
  • McKay, K.N., and T.E. Morton, “Critical Chain,” IIE Transactions, 30:8 (1998), pp. 759–763.
  • McManus, H., A. Haggerty, and E. Murman, “Lean Engineering: Doing the Right Thing Right,” Aeronautical Journal of the Royal Aeronautical Society., (2007), pp. 105–114.
  • Melnyk, Stephen A., Roger J. Calantone, Frank L. Montabon, and Richard T. Smith, “Short-Term Action in Pursuit of Long-Term Improvements: Introducing Kaizen Events,” Production and Inventory Management Journal, 39:4 (4th Quarter, 1998), pp. 69–76.
  • Millard R., “Value Stream Analysis and Mapping for Product Development,” Master's thesis (2001), Massachusetts Institute of Technology.
  • Morgan, J.M., “High Performance Product Development: A System Approach to a Lean Product Development Process,” Ph.D. dissertation (2002), University of Michigan.
  • Morgan, J.M., and J.K. Liker, The Toyota Product Development System: Integrating People, Process, and Technology, Productivity Press (2006).
  • Ohno, T., Toyota Production System: Beyond Large-Scale Production, Productivity Press (1988).
  • Oppenheim, B.W., “Lean Product Development Flow,” Systems Engineering, 7:4 (2004), pp. 352–376.
  • Papadopoulou, T.C. and M. Ozbayrak, “Leanness: Experiences from the Journey to Date,” Journal of Manufacturing Technology Management, 16:7 (2005), pp. 784–807.
  • PMI, The Standard for Program Management, Project Management Institute (2006a).
  • PMI, The Standard for Portfolio Management, Project Management Institute (2006b).
  • Rahim, R.A., and S.N. Baksh, “The Need for a New Product Development Framework for Engineer-to-Order Products,” European Journal of Innovation Management, 6:3 (2003), pp. 182–196.
  • Reinertsen, D., Managing the Design Factory, Free Press (1997).
  • Reinertsen, D., “Lean Thinking Isn't So Simple,” Electronic Design, 47:10 (1999), pp. 48–49.
  • Reinertsen, D., “Let it Flow: How Lean Product Development Sparked a Revolution,” Industrial Engineer, 37:6 (2005), pp. 40–45.
  • Reinertsen, D., The Principles of Product Development Flow: Second Generation Lean Product Development, Celeritas Publishing (2009).
  • Reinertsen, D., and L. Shaeffer, “Making R&D Lean,” Research Technology Management, 48:4 (2005), pp. 51–57.
  • Reinertsen, D., and P.G. Smith, Developing Products in Half the Time: New Rules, New Tools, Van Nostrand Reinhold (1998).
  • Rother, M., and J. Shook, Learning to See: Value Stream Mapping to Add Value and Eliminate Muda, The Lean Enterprise Institute, Inc (1999).
  • Shah, R, and P.T. Ward, “Defining and Developing Measures of Lean Production,” Journal of Operations Management, 76:4 (2007), pp. 785–805.
  • Sobek, D.K., J.K. Liker, and A.C. Ward, “Another Look at How Toyota Integrates Product Development,” Harvard Business Review, 76:4 (1998), pp. 36–49.
  • Sobek, D.K., A.C. Ward, and J.K. Liker, “Toyota's Principles of Set-based Concurrent Engineering,” Sloan Management Review, (Winter 1999), pp. 67–83.
  • Sterman, J.D., Business Dynamics: Systems Thinking and Modeling for a Complex World, Irwin/McGraw-Hill (2000).
  • deTreville, S., J. Antonakis, “Could Lean Production Job Design be Intrinsically Motivating? Contextual, Configurational, and Levels-of-Analysis Issues,” Journal of Operations Management, 24:2 (2006), pp. 99–123.
  • Van Aken, E., D. Van Goubergen, and G. Letens, “Integrated Enterprise Transformation: Case Application in a Project Organization in the Belgian Armed Forces,” Engineering Management Journal, 15:2 (2003), pp. 3–16.
  • Van de Ven, A.H., and M.S. Poole, “Explaining Development and Change in Organizations,” The Academy of Management Review, 20:3 (1995), pp. 510–541.
  • Van Goubergen, D., H. Van Landeghem, E. Van Aken, and G. Letens, “Using Value Stream Mapping to Redesign Engineering Project Work,” Proceedings of the Industrial Engineering Research Conference, May 18-20 (2003).
  • Winner, R.I., J.P. Pennel, H.E. Bertend, and M.M.G. Sulsarczul, “The Role of Concurrent Engineering in Weapen System Acquisition,” IDA Report R-338, Institute for Defence Systems Analysis (1988).
  • Womack, J.P., D.T. Jones, Lean Thinking, Simon and Shuster (1996).
  • Womack, J.P., D.T. Jones, and D. Roos, The Machine that Changed the World, Harper Perennial (1990).
  • Yin, R.K., Case Study Research - Design and Methods, Sage Publications (1984).

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.