1,625
Views
15
CrossRef citations to date
0
Altmetric
Research Articles

Assessing Understanding of Planning and Scheduling Theory and Practice on Construction Projects

References

  • Abeyasinghe, M., Greenwood, D. J., & Johansen, D. E. (2001). An efficient method for scheduling construction projects with resource constraints. International Journal of Project Management, 19(1), 29–45.
  • Ahuja, V., & Thiruvengadam, V. (2004). Project scheduling and monitoring: Current research status. Construction Innovation: Information, Process, Management, 4(1), 19–31.
  • Alsakini, W., Wikström, K., & Kiiras, J. (2004). Proactive schedule management of industrial turnkey projects in developing countries. International Journal of Project Management, 22(1), 75–85.
  • Andersen, E. S. (1996). Warning: Activity planning is hazardous to your project’s health! International Journal of Project Management, 14(2), 89–94.
  • Antill, J. M., & Woodhead, R. W. (1990). Critical path methods in construction practice (3rd ed.). New York, NY: Wiley-Interscience.
  • Aoieong, R. T., Tang, S. L., & Ahmed, S. M. (2002). A process approach in measuring quality costs of construction projects: Model development. Construction Management & Economics, 20(2), 179–192.
  • Ballard, H. G. (2000). The last planner system of production control (Unpublished Ph.D. dissertation). School of Civil Engineering, University of Birmingham, Birmingham, UK. Retrieved from http://www.leanconstruction.org/media/docs/ballard2000-dissertation.pdf
  • Carpio, C., Sydorovych, O., & Marra, M. (2007, February 4–7). Relative importance of environmental attributes using logistic regression. Presented at the Southern Agricultural Economics Association Annual Meetings, Mobile, AL. Retrieved from http://ideas.repec.org/p/ags/saeasm/34846.html
  • Cegarra, J., & Wezel, W. (2011). A comparison of task analysis methods for planning and scheduling. In C. F. Jan, W. Toni, & W. John (Eds.), Behavioral operations in planning and scheduling (pp. 323–338). Berlin, Germany: Springer.
  • Chan, D. W., & Kumaraswamy, M. M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), 55–63.
  • Chen, S.-M., Griffis, F. H., Chen, P.-H., & Chang, L.-M. (2012). Simulation and analytical techniques for construction resource planning and scheduling. Automation in Construction, 21, 99–113.
  • Choo, H. J., & Tommelein, I. D. (2001, August). Requirements and barriers to adoption of last planner computer tools. Presented at the Ninth Annual Conference of the International Group for Lean Construction (IGLC-9) (pp. 6–8), Singapore.
  • Chua, D. K., & Godinot, M. (2006). Use of a WBS matrix to improve interface management in projects. Journal of Construction Engineering and Management, 132(1), 67–79.
  • Dawood, N., & Sriprasert, E. (2006). Construction scheduling using multi‐constraint and genetic algorithms approach. Construction Management and Economics, 24(1), 19–30.
  • Demeulemeester, E. L., & Herroelen, W. S. (2002). Project scheduling: A research handbook. Norwell, MA: Kluwer Academic Publisher.
  • De Snoo, C., Van Wezel, W., & Jorna, R. J. (2011). An empirical investigation of scheduling performance criteria. Journal of Operations Management, 29(3), 181–193.
  • Diaz, C. F., & Hadipriono, F. C. (1993). Nondeterministic networking methods. Journal of Construction Engineering and Management, 119(1), 40–57.
  • Elmaghraby, S. E., Herroelen, W. S., & Leus, R. (2003). Note on the paper ‘Resource-constrained project management using enhanced theory of constraint’ by Wei et al. International Journal of Project Management, 21(4), 301–305.
  • Fellows, R. F., & Liu, A. M. (2009). Research methods for construction (3rd ed.). Chichester, UK: Wiley-Blackwell.
  • Glenwright, E., & Mattos, A. D. (2008, July). The case for construction schedule validation and auditing. AACE International Transactions, Toronto, Canada.
  • Haugan, G. T. (2002). Project planning and scheduling. Leesburg Pike, VA: Management Concepts Press.
  • Herroelen, W., & Leus, R. (2001). On the merits and pitfalls of critical chain scheduling. Journal of Operations Management, 19(5), 559–577.
  • Holt, G. D. (2014). Asking questions, analysing answers: Relative importance revisited. Construction Innovation: Information, Process, Management, 14(1), 2–16.
  • Huang, J. W., & Wang, X. X. (2009, December). Risk analysis of construction schedule based on PERT and MC simulation. In 2009 International Conference on Information Management, Innovation Management and Industrial Engineering (pp. 150–153). Xian, China: IEEE.
  • Hwang, B.-G., & Ng, W. J. (2013). Project management knowledge and skills for green construction: Overcoming challenges. International Journal of Project Management, 31(2), 272–284.
  • Iyer, K. C., & Jha, K. N. (2006). Critical factors affecting schedule performance: Evidence from Indian construction projects. Journal of Construction Engineering and Management, 132(8), 871–881.
  • James, T. (2007). A comparison of email and postal surveys. The Irish Journal of Psychology, 28(3–4), 129–137.
  • Jamieson, S. (2004). Likert scales: How to (ab) use them. Medical Education, 38(12), 1217–1218. 2
  • Jung, Y., & Kang, S. (2007). Knowledge-based standard progress measurement for integrated cost and schedule performance control. Journal of Construction Engineering and Management, 133(1), 10–21.
  • Junior, J., Scola, A., & Conte, A. (1998). Last planner as a site operations tool. Paper presented at the Proceedings of the 6th Annual Conference of International Group for Lean Construction (IGLC-6) (Unpublished), Sao Paulo, Brazil. Retrieved from http://www.ce.berkeley.edu/~tommelein/IGLC-6/AuadaScolaConte.pdf
  • Jun-yan, L. (2012). Schedule uncertainty control: A literature review. Physics Procedia, 33, 1842–1848.
  • Kelsey, J. M., Winch, G. M., & Penn, A. (2001). Understanding the project planning process: Requirements capture for the virtual construction site, (Bartlett Research Paper 15). London, UK: University College London (54 pp.).
  • Kerzner, H. (2009). Project management: A systems approach to planning, scheduling, and controlling (11th ed.). Hoboken, NJ: John Wiley & Sons.
  • Koelmans, R. G. (2004). Project success and performance evaluation. Paper presented at the International Platinum Conference “Platinum Adding Value,” South African Institute of Mining and Metallurgy (pp. 229–236). South Africa: Read, Swatman & Voigt (Pty) Limited.
  • Kog, Y. C., Chua, D. K., Loh, P. K., & Jaselskis, E. J. (1999). Key determinants for construction schedule performance. International Journal of Project Management, 17(6), 351–359.
  • Kuklan, H., Erdem, E., Nasri, F., & Paknejad, M. J. (1993). Project planning and control: An enhanced PERT network. International Journal of Project Management, 11(2), 87–92.
  • Kumar, P. P. (2005). Effective use of Gantt chart for managing large scale projects. Cost Engineering, 47(7), 14–21.
  • Kumaraswamy, M. M., & Chan, D. W. (1998). Contributors to construction delays. Construction Management & Economics, 16(1), 17–29.
  • Laslo, Z. (2010). Project portfolio management: An integrated method for resource planning and scheduling to minimize planning/scheduling-dependent expenses. International Journal of Project Management, 28(6), 609–618.
  • Leach, L. P. (2011). Buffers: Key to project schedule success. PM World Today, XIII(X), 9–11.
  • Lim, A., Ma, H., Rodrigues, B., Teck Tan, S., & Xiao, F. (2011). New concepts for activity float in resource-constrained project management. Computers & Operations Research, 38(6), 917–930.
  • Liu, S.-S., & Wang, C.-J. (2012). Optimizing linear project scheduling with multi-skilled crews. Automation in Construction, 24, 16–23.
  • Long, L. D., & Ohsato, A. (2008). Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. International Journal of Project Management, 26(6), 688–698.
  • Long, N. D., Ogunlana, S., Quang, T., & Lam, K. C. (2004). Large construction projects in developing countries: A case study from Vietnam. International Journal of Project Management, 22(7), 553–561.
  • Luu, V. T., Kim, S. Y., Tuan, N. V., & Ogunlana, S. O. (2009). Quantifying schedule risk in construction projects using Bayesian belief networks. International Journal of Project Management, 27(1), 39–50.
  • Ma, G., & Tu, M. (2002). The application of TOC in project schedule management. Journal of Industrial Engineering and Engineering Management, 4, 16.
  • Maylor, H. (2001). Beyond the Gantt chart: Project management moving on. European Management Journal, 19(1), 92–100.
  • McKay, K. N., & Wiers, V. (1999). Unifying the theory and practice of production scheduling. Journal of Manufacturing Systems, 18(4), 241–255.
  • Mikulakova, E., König, M., Tauscher, E., & Beucke, K. (2010). Knowledge-based schedule generation and evaluation. Advanced Engineering Informatics, 24(4), 389–403.
  • Mohan, S. (1990). Expert systems applications in construction management and engineering. Journal of Construction Engineering and Management, 116(1), 87–99.
  • Mongalo, M. A., & Lee, J. (1990). A comparative study of methods for probabilistic project scheduling. Computers & Industrial Engineering, 19(1–4), 505–509.
  • Mulholland, B., & Christian, J. (1999). Risk assessment in construction schedules. Journal of Construction Engineering and Management, 125(1), 8–15.
  • Nicholas, J. M., & Steyn, H. (2012). Project management for engineering, business, and technology (4th ed.). New York: Routledge.
  • Oberlender, G. D. (2000). Project management for engineering and construction. Boston, MA: McGraw-Hill.
  • Oglietti, M. (2005). Understanding planning with incomplete information and sensing. Artificial Intelligence, 164(1–2), 171–208.
  • Olawale, Y., & Sun, M. (2015). Construction project control in the UK: Current practice, existing problems and recommendations for future improvement. International Journal of Project Management, 33(3), 623–637.
  • Oppenheim, A. N. (2000). Questionnaire design, interviewing and attitude measurement (4th ed.). London, UK: Continuum.
  • Oyedele, L. O. (2013). Analysis of architects’ demotivating factors in design firms. International Journal of Project Management, 31(3), 342–354.
  • Plotnick, F. L. & O’Brien, J. J (2009). CPM in construction management (7th ed.). New York: McGraw-Hill Professional.
  • Popescu, C. M., & Charoenngam, C. (1995). Project planning, scheduling, and control in construction: An encyclopedia of terms and applications. New York, NY: Wiley-Interscience.
  • Rand, G. K. (2000). Critical chain: The theory of constraints applied to project management. International Journal of Project Management, 18(3), 173–177.
  • Rasdorf, W., & Abudayyeh, O. (1991). Cost‐ and schedule‐control integration: Issues and needs. Journal of Construction Engineering and Management, 117(3), 486–502.
  • Rowley, J. (2014). Designing and using research questionnaires. Management Research Review, 37(3), 308–330.
  • Sacks, R., Radosavljevic, M., & Barak, R. (2010). Requirements for building information modeling based lean production management systems for construction. Automation in Construction, 19(5), 641–655.
  • Saver, J. (2001). Knowledge-based design of scheduling systems. Intelligent Automation & Soft Computing, 7(1), 55–62.
  • Shash, A. A., & Ahcom, J. (2006). Organizational aspects of planning and scheduling subsystem. Journal of Construction Research, 7(1), 247–265.
  • Shobrys, D. E., & White, D. C. (2000). Planning, scheduling and control systems: Why cannot they work together? Computers & Chemical Engineering, 24(2), 163–173.
  • Siemens, N. (1971). A simple CPM time-cost tradeoff algorithm. Management Science, 17(6), 354–363.
  • Smith, D. E., Frank, J., & Jónsson, A. K. (2000). Bridging the gap between planning and scheduling. The Knowledge Engineering Review, 15(1), 47–83.
  • Tam, V. W. Y., Shen, L. Y., & Kong, J. S. Y. (2011). Impacts of multi-layer chain subcontracting on project management performance. International Journal of Project Management, 29(1), 108–116.
  • Tan, W., & Khoshnevis, B. (2000). Integration of process planning and scheduling—A review. Journal of Intelligent Manufacturing, 11(1), 51–63.
  • Trietsch, D., & Baker, K. R. (2012). PERT 21: Fitting PERT/CPM for use in the 21st century. International Journal of Project Management, 30(4), 490–502.
  • Walker, D. H. T., & Shen, Y. J. (2002). Project understanding, planning, flexibility of management action and construction time performance: Two Australian case studies. Construction Management & Economics, 20(1), 31–44.
  • Weaver, P. (2009). Scheduling in the age of complexity. Paper presented at the Sixth Annual PMI College of Scheduling Conference (24 pp.), Boston, MA. Retrieved from http://www. mosaicprojects. com. au/Resources_Papers_089.html
  • Wilkins, D. E. (2001). A call for knowledge-based planning. AI Magazine, 22(1), 99–115.
  • Wilson, J. M. (2003). Gantt charts: A centenary appreciation. European Journal of Operational Research, 149(2), 430–437.
  • Winch, G. M., & Kelsey, J. (2005). What do construction project planners do? International Journal of Project Management, 23(2), 141–149.
  • Xie, X.-M., Yang, G., & Lin, C. (2010). Software development projects IRSE buffer settings and simulation based on critical chain. The Journal of China Universities of Posts and Telecommunications, 17, 100–106.
  • Yamín, R. A., & Harmelink, D. J. (2001). Comparison of linear scheduling model (LSM) and critical path method (CPM). Journal of Construction Engineering and Management, 127, 374–381.
  • Yang, J. B. (2005). Comparison of CPM and CCS tools to construction project. Proceedings of Third International Structural Engineering and Construction Conference (ISEC 03) (pp. 845–851), Shunan, Japan.
  • Yang, J. B. (2007a). How the critical chain scheduling method is working for construction. Cost Engineering, 49(4), 25–32.
  • Yang, J.-B. (2007b). Developing a knowledge map for construction scheduling using a novel approach. Automation in Construction, 16(6), 806–815.
  • Zakeri, M., Olomolaiye, P., Holt, G. D., & Harris, F. C. (1997). Factors affecting the motivation of Iranian construction operatives. Building and Environment, 32(2), 161–166.
  • Zhu, Z., & Heady, R. B. (1994). A simplified method of evaluating PERT/CPM network parameters. IEEE Transactions on Engineering Management, 41(4), 426–430.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.