REFERENCES
- Biswas, G., Kawamura K., Saad, A., “Intelligent Manufacturing Systems: State-Of-The-Art.” Proceedings of the 10th Annual Technical and Business Exhibition Symposium (TABES). Huntsville Association of Technical Societies (HATS), May 1994, pp. 94–503.
- Kaplan, G. “Manufacturing a la Carte: Agile Assembly Lines, Faster Development Cycles.” IEEE Spectrum. IEEE Society, September 1993, pp. 24–27.
- Gunther, H. “The Design of an Hierarchical Model for Production Planning and Scheduling.” Multi-Stage Production Planning and Inventory Control. Springer Verlag, 1986, pp. 227–260.
- Ditts, D., N. Boyd, H. Whorms. “The Evolution of Control Architectures for Automated Manufacturing Systems.” Journal of Manufacturing Systems. SME, January 1993, pp. 79–93.
- Duffie, N., V. Prabhu. “Real-Time Distributed Scheduling of Heterarchical Manufacturing Systems.” Journal of Manufacturing Systems. SME, February 1994, pp. 94–107.
- Shaw, M. “A Distributed Scheduling Method for Computer Integrated Manufacturing: The Use of Local Area Networks in Cellular Systems.” International Journal of Production Research. Volume 25, number 9, 1987, pp. 1285–1303.
- Parunak, H. “Manufacturing Experience with The Contract Net.” Distributed Artificial Intelligence). Morgan Kaufmann, 1987, pp. 285–310.
- Smith, R. “A Framework for Problem Solving in a Distributed Processing Environment.” Computer Science Department Report STAN-CS-78-700. Stanford University, 1978.
- Baker, A. “Case Study Results with the Market-Driven Contract Net Production Planning and Control System.” Proceedings of Autofact'92. Society of Manufacturing Engineers, 1992, pp. 17–35.
- Blackstone, J., D. Phillips, G. Hogg. “A State-of-the-art Survey of Dispatching Rules for Manufacturing Job Shop Operations.” International Journal of Production Research. Volume 20, number 1, 1982, pp. 27–45.
- Wein L., P. Chevalier. “A Broader View of the Job-Shop Scheduling Algorithm.” Management Science. Volume 38, number 7, pp. 1018–1033.
- Smith, S. “A Constraint-Based Framework for Reactive Management of Factory Schedules.” First International Conference on Expert Systems and The Leading Edge in Production Planning and Control. 1987, pp. 349–366.
- Fox, M. Constraint-Directed Search: A Case Study of Job-Shop Scheduling. Morgan Kaufmann Publishers, 1992.
- Uckun, S., S. Bagchi, K. Kawamura, Y. Miyabe. “Managing Genetic Search in Job Shop Scheduling “IEEE Expert. IEEE Society, volume 8, number 5, pp. 15–24.
- Werner, E. and Y. Demazeau, editors, Decentralized A.I., Proceedings of the Third European Workshop on Modelling Autonomous Agents in a Multi-Agent World. Elsevier Science Publishers, 1992.
- Sycara K., S. Roth, N. Sadeh, M. Fox. “Distributed Constrained Heuristic Search.” IEEE Transactions on Systems, Man, and Cybernetics. IEEE Society, November-December 1991, pp. 1446–1461.
- Lin, G., J. Solberg. “The Performance Analysis of an Adaptive Manufacturing Control System “ Proceedings of the 2nd Industrial Engineering Research Conference. 1993 pp. 47–55.
- Tsukada, T. “Polite Rescheduling: Responding to Local Schedule Disruptions in Distributed Manufacturing Systems. “Proceeding of the IEEE International Conference on Robotics and Automation. IEEE Society, 1994, pp. 1986–1991.
- Huq, Z. “A Process Oriented Manufacturing System Simulation to Measure the Effect of Shop Control Factors. Journal of Simulation. April 1994, pp. 218–228.
- Buzacott, J., J. Shanthikumar. Stochastic Models of Manufacturing System. Prentice-Hall, 1993.
- Pedgen, C., R. Shannon, R. Sadowski. Introduction to Simulation Using Siman. McGraw-Hill, 1990.
- Ramamritham K., J. Stankovic. “Dynamic Task Scheduling in Hard Real-Time Distributed Systems.” IEEE Software. IEEE Society, July 1984, pp. 65–75.
- Cheng, S-C, Ramaamritham K. and J. Stankovic “Scheduling Algorithms for Hard Real-Time Systems - A Brief Survey.” IEEE Society, 1988, pp. 65–75.