35
Views
13
CrossRef citations to date
0
Altmetric
Original Articles

A Decision Support System for Production Scheduling

Pages 243-260 | Published online: 31 May 2012

7. References

  • Atabakhsh , H. 1991 . “A survey for constraint based scheduling systems using an artificial intelligence approach,” . Al in Eng. vol. , 6 ( n° 2 ) : 58 – 73 .
  • Blazewicz , J. , Finke , G. , Haupt , R. and Schmidt , G. 1988 . “New trends in machine scheduling,” . European Journal of Operational Research , 37 : 303 – 317 .
  • Blazewicz , J. 1987 . “Selected topics in scheduling theory,” . Ann. Disc. Maths , 31 : 1 – 60 .
  • Blackstone , J. H. , Phillips , D. T. and Hogg , G. L . 1982 . “A state-of-the-art survey of dispatching rules for manufacturing job shop operations,” . Int. J. Prod. Res., vol. , 20 ( n° 1 ) : 27 – 45 .
  • Bulgren , W. 1982 . Discrete System Simulation Prentice-Hall .
  • Buzacott , J. A. and Yao , D. D. 1986 . “FMS: a review of analytical models,” . Management Science , 32 : 890 – 905 .
  • Carrie , A. S. 1986 . “The role of simulation in FMS,” . In Flexible Manufacturing Systems: Methods and Studies Edited by: Kusiak , A. 191 – 208 . Elsevier .
  • Garey , M. R. and Johnson , D. S. 1979 . Computers and Intractability: a Guide to the Theory of NP-Completeness San Francisco : Freeman .
  • Harrington , J. 1973 . Computer Integrated Manufacturing New York : Industrial Press .
  • Kalkunte , M. V. , Sarin , S. C. and Wilhelm , W. E. 1986 . “Flexible Manufacturing Systems: a review of modelling approaches for design, justification and operation,” . In Flexible Manufacturing Systems: Methods and Studies Edited by: Kusiak , A. 3 – 28 . Elsevier .
  • Kusiak , A. 1986 . “Application of operational research models and techniques in flexible manufacturing systems,” . European Journal of Operational Research , 24 : 336 – 345 .
  • Van , LOOVEREN A.J. , Gelders , L. F. and Van wassenhove , N. L. 1986 . “A review of FMS planning models,” . In Modelling and Design of Flexible Manufacturing Systems Edited by: Kusiak , A. 3 – 32 . Elsevier .
  • Mcnaughton , R. 1959 . “Scheduling with deadlines and loss functions,” . Management Science , 12 : 1 – 12 .
  • Ploenzke , Informatik . 1990 . “ Survey of “Leitstand” systems, Wiesbaden ” .
  • Panwalkar , S. S. and Iskande , W. 1977 . “A survey of scheduling rules,” . Operations Research, vol.25, n° , 1 : 45 – 61 .
  • Ranky , P. G. 1986 . Computer Integrated Manufacturing Prentice Hall . New York
  • Schmidt , G. 1984 . “Scheduling on semi-identical processors,” . Zeitschrift für Operations Research , 28 : 153 – 162 .
  • Schmidt , G. 1988 . “Scheduling independent tasks with deadlines on semi-identical processors,” . Journal of the Operational Research Society , 39 : 271 – 277 .
  • Schmidt , G. 1989 . CAM: Algorithmen und Decision Support für die Fertigungssteuerung, Springer-Verlag
  • Schmidt , G. 1989 . “Constraint satisfaction problems in project scheduling,” . In Advances in Project Scheduling Edited by: Slowinski , R. and Weglarz , J. 135 – 150 . Elsevier .
  • Scheer , A. W. 1991 . CIM—Towards the Factory of the Future, Springer-Verlag
  • Stecke , K. E. 1985 . “Design, planning, scheduling and control problems of flexible manufacturing systems”. . Annals of Operations Research , 3 : 3 – 121 .
  • Watermann , D. A. 1986 . A Guide to Expert Systems Addison-Wesley . Reding

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.