7. References
- Aldanondo , M. and Mercé , C. 1991 . “Hierarchical data model for scheduling and monitoring in manufacturing systems,” . IFIP CAPE , 91 (North-Holland)
- Aldanondo , M. and Breuil , D. 1993 . “Raw manufacturing data for hierarchical decision system. Identification and potential uses,” . Journal of Decision Systems , 2 n°3–4 (Ed Hermes)
- Archimède , B. , Pun , L. , Bérard , C. and Doumeingts , G. 1993 . “Flow-Profiles and Potential Graphs based FMS dynamical control,” . Control Eng. Practice , 1 n°1.
- Doumeingts , G. 1990 . CIM: integration aspects “Design and Specification Method for Production Systems,” (Ed Teknea)
- Gelders.L , Mannaerts.P and Maes , J . 1994 . “Manufacturing strategy, performance indicators and improvement programs,” . International Journal of- Production Research , 32 n°4 (Taylor & Francis)
- Jones , A. and Saleh , A. 1990 . “A multi level/multi layer architecture for intelligent shop floor control,” . International Journal of CIM , 3 n°1. (Taylor & Francis)
- Scheer , A. 1989 . Enterprise Wide Data Modeling (Springer & Verlag)
- Winter , R. E. 1991 . “On the utilisation of an active, integrated database for the vertical integration of production planning and control,” . IFIP CAPE , 91 (North- Holland)