2,303
Views
2
CrossRef citations to date
0
Altmetric
Construction Management

Multiple work zone strategy for repetitive on-site work of modular construction using parallel station method

, , , &
Pages 285-297 | Received 14 Oct 2019, Accepted 14 May 2020, Published online: 02 Jul 2020

References

  • AbouRizk, S. M., D. W. Halpin, and J. D. Lutz. 1992. “State of the Art in Construction Simulation.” In Proceedings of the 24th Conference on Winter Simulation, 1271–1277. New York, NY: Association for Computing Machinery.
  • Alghazi, A., and M. E. Kurz. 2018. “Mixed Model Line Balancing with Parallel Stations, Zoning Constraints, and Ergonomics.” Constraints 23 (1): 123–153. doi:10.1007/s10601-017-9279-9.
  • Altuwaim, A., and K. El-Rayes. 2018. “Optimizing the Scheduling of Repetitive Construction to Minimize Interruption Cost.” Journal of Construction Engineering and Management 144 (7): 04018051. doi:10.1061/(ASCE)CO.1943-7862.0001510.
  • Alvanchi, A., R. Azimi, S. Lee, S. M. AbouRizk, and P. Zubick. 2011. “Off-site Construction Planning Using Discrete Event Simulation.” Journal of Architectural Engineering 18 (2): 114–122. doi:10.1061/(ASCE)AE.1943-5568.0000055.
  • Arditi, D., O. B. Tokdemir, and K. Suh. 2002. “Challenges in Line-of-Balance Scheduling.” Journal of Construction Engineering and Management 128 (6): 545–556. doi:10.1061/(ASCE)0733-9364(2002)128:6(545).
  • Arif, M., M. A. Mullens, D. Espinal, and R. S. Broadway. 2002. “Estimating, Planning and Controlling Labor in the Industrialized Housing Factory.” In Proceedings of IIE Annual Conference, 1. Orlando, FL: Institute of Industrial Engineers-Publisher.
  • Askin, R., and M. Zhou. 1997. “A Parallel Station Heuristic for the Mixed-Model Production Line Balancing Problem.” International Journal of Production Research 35 (11): 3095–3106. doi:10.1080/002075497194309.
  • Becker, C., and A. Scholl. 2006. “A Survey on Problems and Methods in Generalized Assembly Line Balancing.” European Journal of Operational Research 168 (3): 694–715. doi:10.1016/j.ejor.2004.07.023.
  • Blismas, N., and R. Wakefield. 2009. “Drivers, Constraints and the Future of Offsite Manufacture in Australia.” Construction Innovation 9 (1): 72–83. doi:10.1108/14714170910931552.
  • Blismas, N. G., M. Pendelbury, A. Gibb, and C. Pasquire. 2005. “Constraints to the Use of Off-site Production on Construction Projects.” Architectural Engineering and Design Management 1 (3): 153–162. doi:10.1080/17452007.2005.9684590.
  • Carr, R. I., and W. L. Meyer. 1974. “Planning Construction of Repetitive Building Units.” Journal of the Construction Division 100 (3): 403–412.
  • Chrzanowski, E. N., Jr, and D. W. Johnston. 1986. “Application of Linear Scheduling.” Journal of Construction Engineering and Management 112 (4): 476–491. doi:10.1061/(ASCE)0733-9364(1986)112:4(476).
  • Eastman, C. M., and R. Sacks. 2008. “Relative Productivity in the AEC Industries in the United States for On-site and Off-site Activities.” Journal of Construction Engineering and Management 134 (7): 517–526. doi:10.1061/(ASCE)0733-9364(2008)134:7(517).
  • Ege, Y., M. Azizoglu, and N. E. Ozdemirel. 2009. “Assembly Line Balancing with Station Paralleling.” Computers & Industrial Engineering 57 (4): 1218–1225. doi:10.1016/j.cie.2009.05.014.
  • El-Rayes, K., and O. Moselhi. 2001. “Optimizing Resource Utilization for Repetitive Construction Projects.” Journal of Construction Engineering and Management 127 (1): 18–27. doi:10.1061/(ASCE)0733-9364(2001)127:1(18).
  • Fan, S.-L., K.-S. Sun, and Y.-R. Wang. 2012. “GA Optimization Model for Repetitive Projects with Soft Logic.” Automation in Construction 21: 253–261. doi:10.1016/j.autcon.2011.06.009.
  • Flapper, S. D. P., J. C. Fransoo, R. A. Broekmeulen, and K. Inderfurth. 2002. “Planning and Control of Rework in the Process Industries: A Review.” Production Planning & Control 13 (1): 26–34. doi:10.1080/09537280110061548.
  • Ioannou, P. G., and I.-T. Yang. 2016. “Repetitive Scheduling Method: Requirements, Modeling, and Implementation.” Journal of Construction Engineering and Management 142 (5): 04016002. doi:10.1061/(ASCE)CO.1943-7862.0001107.
  • Ipsilandis, P. G. 2006. “Multiobjective Optimization in Linear Repetitive Project Scheduling.” Operational Research 6 (3): 255–269. doi:10.1007/BF02941255.
  • Ipsilandis, P. G. 2007. “Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects.” Journal of Construction Engineering and Management 133 (6): 417–424. doi:10.1061/(ASCE)0733-9364(2007)133:6(417).
  • Jung, M. 2016. “Complexity of Construction Supply Chain Management: Agent-Based Simulation of High-Rise Building Construction Project.” PhD diss., Seoul National University.
  • Jung, M., J. Moon, M. Park, H.-S. Lee, S. U. Joo, and K.-P. Lee. 2017. “Construction Worker Hoisting Simulation for Sky-Lobby Lifting System.” Automation in Construction 73: 166–174. doi:10.1016/j.autcon.2016.10.002.
  • Kaming, P. F., P. O. Olomolaiye, G. D. Hold, and F. C. Harris. 1997. “Factors Influencing Construction Time and Cost Overruns on High-Rise Projects in Indonesia.” Construction Management and Economics 15 (1): 83–94. doi:10.1080/014461997373132.
  • Lawson, R. M., R. G. Ogden, and R. Bergin. 2011. “Application of Modular Construction in High-Rise Buildings.” Journal of Architectural Engineering 18 (2): 148–154. doi:10.1061/(ASCE)AE.1943-5568.0000057.
  • Lee, D., D.-S. Kim, G.-H. Kim, and S. Kim. 2015. “Time Reduction Effect of the Enhanced TACT Method for High-Rise Residential Buildings.” Journal of Civil Engineering and Management 22 (7): 944–953. doi:10.3846/13923730.2014.945949.
  • Lee, S., S. Han, and F. Peña-Mora. 2007. “Hybrid System Dynamics and Discrete Event Simulation for Construction Management.” In Proceeding of the 2007 ASCE International Workshop on Computing in Civil Engineering, 232–239. Reston, VA: ASCE.
  • Lu, N. 2009. “The Current Use of Offsite Construction Techniques in the United States Construction Industry.”  In Proceedings of the Construction Research Congress: Building a Sustainable Future, 946–955. Reston, VA: ASCE.
  • Moghadam, M., M. Al-Hussein, S. Al-Jibouri, and A. Telyas. 2012. “Post Simulation Visualization Model for Effective Scheduling of Modular Building Construction.” Canadian Journal of Civil Engineering 39 (9): 1053–1061. doi:10.1139/l2012-077.
  • Mohsen, O. M., P. J. Knytl, B. Abdulaal, J. Olearczyk, and M. Al-Hussein. 2008. “Simulation of Modular Building Construction.” In Proceedings of the 40th Conference on Winter Simulation, Winter Simulation Conference, 2471–2478. Winter Simulation Conference.
  • Moselhi, O., and K. El-Rayes. 1993. “Scheduling of Repetitive Projects with Cost Optimization.” Journal of Construction Engineering and Management 119 (4): 681–697. doi:10.1061/(ASCE)0733-9364(1993)119:4(681).
  • Mullens, M. A. 2011. Factory Design for Modular Homebuilding: Equipping the Modular Factory for Success. Winter Park, FL: Constructability Press.
  • Nassar, K. 2011. “Evolutionary Optimization of Resource Allocation in Repetitive Construction Schedules.” Journal of Information Technology in Construction (ITcon) 10 (18): 265–273.
  • Özcan, U. 2019. “Balancing and Scheduling Tasks in Parallel Assembly Lines with Sequence-Dependent Setup Times.” International Journal of Production Economics 213: 81–96. doi:10.1016/j.ijpe.2019.02.023.
  • Pinto, P. A., D. G. Dannenbring, and B. M. Khumawala. 1981. “Branch and Bound and Heuristic Procedures for Assembly Line Balancing with Paralleling of Stations.” The International Journal of Production Research 19 (5): 565–576. doi:10.1080/00207548108956687.
  • Reda, R. M. 1990. “RPM: Repetitive Project Modeling.” Journal of Construction Engineering and Management 116 (2): 316–330. doi:10.1061/(ASCE)0733-9364(1990)116:2(316).
  • Salama, T., and O. Moselhi. 2019. “Multi-Objective Optimization for Repetitive Scheduling under Uncertainty.” Engineering, Construction and Architectural Management 26 (7): 1294–1320. doi:10.1108/ECAM-05-2018-0217.
  • Shaked, O., and A. Warszawski. 1992. “CONSCHED: Expert System for Scheduling of Modular Construction Projects.” Journal of Construction Engineering and Management 118 (3): 488–506. doi:10.1061/(ASCE)0733-9364(1992)118:3(488).
  • Suhail, S. A., and R. H. Neale. 1994. “CPM/LOB: New Methodology to Integrate CPM and Line of Balance.” Journal of Construction Engineering and Management 120 (3): 667–684. doi:10.1061/(ASCE)0733-9364(1994)120:3(667).
  • Taghaddos, H., U. Hermann, S. AbouRizk, and Y. Mohamed. 2012. “Simulation-Based Multiagent Approach for Scheduling Modular Construction.” Journal of Computing in Civil Engineering 28 (2): 263–274. doi:10.1061/(ASCE)CP.1943-5487.0000262.
  • Zou, X., Fang, S.-C., Huang, Y.-S., and Zhang, L.-H. 2016. “Mixed-Integer Linear Programming Approach for Scheduling Repetitive Projects with Time-Cost Trade-Off Consideration”. Journal of Computing in Civil Engineering 31(3): 06016003https://doi.org/10.1061/(ASCE)CP.1943-5487.0000641.