1,239
Views
1
CrossRef citations to date
0
Altmetric
Research Article

Contractor-led design risk management in international large project: Korean contractor’s perspective

, , &
Pages 1387-1398 | Received 11 Dec 2021, Accepted 28 May 2022, Published online: 16 Jun 2022

References

  • Al-Qady, M., and A. Kandil. 2013. “Document Management in Construction: Practices and Opinions.” Journal of Construction Engineering and Management 10 (1061/(ASCE)CO.1943–7862.0000741): 06013002. doi:10.1061/(ASCE)CO.1943-7862.0000741.
  • Aminmansour, A., and K. S. Moon. 2010. “Integrated Design and Construction of Tall Buildings.” Journal of Architectural Engineering 16 (2): 47–53. doi:10.1061/(ASCE)1076-0431(2010)16:2(47).
  • Bala, B. K., F. M. Arshad, and K. M. Noh. 2017. System Dynamics: Modelling and Simulation. Singapore: Springer.
  • CAO, D., H. LI, and G. WANG. 2017. “Impacts of Building Information modeling (BIM) Implementation on Design and Construction Performance: A Resource Dependence Theory Perspective.” Frontiers of Engineering Management 4 (1): 20–34. doi:10.15302/J-FEM-2017010.
  • Cerezo-Narváez, A., A. Pastor-Fernández, M. Otero-Mateo, and P. Ballesteros-Pérez. 2020. “Integration of Cost and Work Breakdown Structures in the Management of Construction Projects.” Applied Sciences 10 (4): 1386–1418. doi:10.3390/app10041386.
  • Chou, J.-S., A.-D. Pham, and H. Wang. 2013. “Bidding Strategy to Support decision-making by Integrating Fuzzy AHP and regression-based Simulation.” Automation in Construction 35: 517–527. doi:10.1016/j.autcon.2013.06.007.
  • Demirkesen, S., and B. Ozorhon. 2017. “Impact of Integration Management on Construction Project Management Performance.” International Journal of Project Management 35 (8): 1639–1654. doi:10.1016/j.ijproman.2017.09.008.
  • Doumbouya, L., G. Gao, and C. Guan. 2016. “Adoption of the Building Information Modeling (BIM) for Construction Project Effectiveness: The Review of BIM Benefits.” American Journal of Civil Engineering and Architecture 4 (3): 74–79.
  • Emmitt, S. 2010. “Design Management in Architecture, Engineering and Construction: Origin and Trends.” Gestão & Tecnologia de Projetos 5 (3): 28–37. doi:10.4237/gtp.v5i3.173.
  • Emmitt, S., C. Pasquire, and B. Merita (2011). “Addressing the architect/contractor Interface: A Lean Design Management Perspective.” In: A. F. H. J. den Otter, S. Emmitt, and C. Achammer (Eds.) Proceedings of the CIB-W096 Conference Vienna: Architectural Management in the Digital Arena, Vienna University of Technology: Austria, 13-15 October 2011, 110–119.
  • Forrester, J. W. 1961. Industrial Dynamics. Waltham, MA: Pegasus Communications.
  • Galloway, P. 2009. “Design-build/EPC Contractor’s Heightened Risk – Changes in a Changing World.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction 1 (1): 7–15. doi:10.1061/(ASCE)1943-4162(2009)1:1(7).
  • Gransberg, D. D. 2013. “Early Contractor Design Involvement to Expedite the Delivery of Emergency Highway Projects.” Transportation Research Record 2347 (1): 19–26. doi:10.3141/2347-03.
  • Gray, C., W. Hughes, and J. Bennett (1994). The Successful Management of Design, Centre for Strategic Studies in Construction, Reading (Reading: University of Reading), W. s and J. Bennett
  • Han, S., P. Love, and F. Pena-Mora. 2013. “A System Dynamics Model for Assessing the Impact of Design Errors in Construction Projects.” Mathematical and Computer Modelling 57 (9–10): 2044–2053. doi:10.1016/j.mcm.2011.06.039.
  • Hastie, J., M. Sutrisna, and C. Egbu. 2017. “Modelling Knowledge Integration Process in Early Contractor Involvement Procurement at Tender Stage – A Western Australian Case Study.” Construction Innovation 17 (4): 429–456. doi:10.1108/CI-04-2016-0021.
  • Hauke, J., and T. Kossowski. 2011. “Comparison of Values of Pearson’s and Spearman’s Correlation Coefficients on the Same Sets of Data.” Quaestiones Geographicae 30 (2): 87. doi:10.2478/v10117-011-0021-1.
  • Kalan, D., and M. E. Ozbek. 2020. “Development of a Construction Project Bidding decision-making Tool.” Practice Periodical on Structural Design and Construction 25 (1): 04019032. doi:10.1061/(ASCE)SC.1943-5576.0000457.
  • Larsen, J. K., G. Q. Shen, S. M. Lindhard, and T. D. Brunoe. 2016. “Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects.” Journal of Management in Engineering 32 (1): 04015032. doi:10.1061/(ASCE)ME.1943-5479.0000391.
  • Liu, J., P. Yang, B. Xia, and M. Skitmore. 2017. “Effect of Perceived Justice on Subcontractor Willingness to Cooperate: The Mediating Role of Relationship Value.” Journal of Construction Engineering and Management 143 (9): 1–8. doi:10.1061/(ASCE)CO.1943-7862.0001350.
  • Loosemore, M., and E. Cheung. 2015. “Implementing Systems Thinking to Manage Risk in Public Private Partnership Projects.” International Journal of Project Management 33 (6): 1325–1334. doi:10.1016/j.ijproman.2015.02.005.
  • Minchin, E., L. Ptschelinzew, G. C. Migliaccio, and U. Gatti (2014). “NCHRP Report 787: Guide for Design Management on design-build and Construction manager/general Contractor Projects.” Transportation Research Board, Washington, DC.
  • Mohamed, A., S. Khoury, and M. Hafez. 2011. “Contractor’s Decision for Bid Profit Reduction within Opportunistic Bidding Behavior of Claims Recovery.” International Journal of Project Management 29 (1): 93–107. doi:10.1016/j.ijproman.2009.12.003.
  • Nibbelink, J. G., M. Sutrisna, and A. U. Zaman. 2017. “Unlocking the Potential of Early Contractor Involvement in Reducing Design Risks in Commercial Building Refurbishment Projects – A Western Australian Perspective.” Architectural Engineering and Design Management 13 (6): 439–456. doi:10.1080/17452007.2017.1348334.
  • Norusis, M. J. 2012. IBM SPSS Statistics 19 Statistical Procedures Companion. Hoboken, New Jersey: Prentice Hall.
  • Othman, M. Z., M. N. M. Nawi, F. A. A. Nifa, M. Yaakob, K. Rofie, Z. M. Zan, and M. A. A. Pozin. 2016. “A Strategy Towards Team Integration Practice for Improving the Design and Construction Process in the Malaysian Industrialized Building System Projects.” International Review of Management and Marketing 6 (S8): 226–229.
  • Pankaj, P. B. 2016. “Analysis of Time and Cost Overrun to Key Success of High-Rise Commercial Building Project - A Case Study.” International Journal of Civil Engineering and Technology 7 (4): 400–405.
  • Schaffernicht, M. 2010. “Causal Loop Diagrams between Structure and Behaviour: A Critical Analysis of the Relationship between Polarity, Behaviour and Events.” System Research and Behavioral Science 27 (6): 653–666. doi:10.1002/sres.1018.
  • Schmid, F., and R. Schmidt. 2007. “Multivariate Extensions of Spearman’s Rho and Related Statistics.” Statistics & Probability Letters 77 (4): 407–416. doi:10.1016/j.spl.2006.08.007.
  • Sha’ar, K. Z., S. A. Assaf, T. Bambang, M. Babsail, and A. M. Abd El Fattah. 2016. “Design-construction Interface Problems in Large Building Construction Projects.” International Journal of Construction Management. doi:10.1080/15623599.2016.1187248.
  • Song, L., Y. Mohamed, and S. M. Abourizk. 2009. “Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance.” Journal of Management in Engineering 25 (1): 12–20. doi:10.1061/(ASCE)0742-597X(2009)25:1(12).
  • Sterman, J. 2018. “System Dynamics at Sixty: The Path Forward.” System Dynamics Review 34 (1–2): 5–47. doi:10.1002/sdr.1601.
  • Sutrisna, M., and J. Goulding. 2019. “Managing Information Flow and Design Processes to Reduce Design Risks in Offsite Construction Projects.” Engineering, Construction and Architectural Management 26 (2): 267–284. doi:10.1108/ECAM-11-2017-0250.
  • Tzortzopoulos, P., and R. Cooper. 2007. “Design Management from a Contractor’s Perspective: The Need for Clarity.” Architectural Engineering and Design Management 3 (1): 17–28. doi:10.1080/17452007.2007.9684626.
  • Walker, D. H. T., and B. L. Walker (2012). “Understanding Early Contractor Involvement (ECI) Procurement Forms.” Procs 28th Annual ARCOM Conference, 3-5 September 2012, Edinburgh, UK, Association of Researchers in Construction Management, 877–887.
  • Wang, T., W. Tang, D. Qi, W. Shen, and M. Huang. 2016. “Enhancing Design Management by Partnering in Delivery of International EPC Projects: Evidence from Chinese Construction Companies.” Journal of Construction Engineering and Management 142 (4): 04015099. doi:10.1061/(ASCE)CO.1943-7862.0001082.
  • Whang, S. W., and R. Flanagan (2015). “Minimisation of Risk Exposure at the pre-production Stage through the Use of contractor-led Design Management.” In: A. B. Raidén and E. Aboagye-Nimo, eds. Proceedings of the 31st Annual ARCOM Conference, 7-9 September 2015, Lincoln, UK, Association of Researchers in Construction Management, 155–164.
  • Whang, S. W., R. Flanagan, and S. Kim. 2017. “Contractor-Led Critical Design Management Factors in High-Rise Building Projects Involving Multinational Design Teams.” Journal of Construction Engineering and Management 10 (5): 06016009. doi:10.1061/(ASCE)CO.1943-7862.0001242.
  • White, H., and R. Marasini. 2014. “Management of Interface between Main Contractor and Subcontractors for Successful Project Outcomes.” Journal of Engineering, Project, and Production Management 4 (1): 36–50. doi:10.32738/JEPPM.201401.0005.
  • Whyte, J., A. Stasis, and C. Lindkvist. 2016. “Managing Change in the Delivery of Complex Projects: Configuration Management, Asset Information and ‘Big Data’.” International Journal of Project Management 34 (2): 339–351. doi:10.1016/j.ijproman.2015.02.006.
  • Yearworth, M., and L. White. 2013. “The Uses of Qualitative Data in Multimethodology: Developing Causal Loop Diagrams during the Coding Process.” European Journal of Operational Research 231 (1): 151–161. doi:10.1016/j.ejor.2013.05.002.
  • Zhou, H.-B., and H. Zhang (2010). “Dynamic Risk Management System for Large Project Construction in China.” In: Proc. Geo. Florida Conf. Adv. Anal. Model Des.