2,955
Views
1
CrossRef citations to date
0
Altmetric
Research Article

Development of a pre-qualification and selection framework for construction projects’ contractors in Saudi Arabia

, , &
Pages 1545-1563 | Received 08 Jan 2022, Accepted 28 May 2022, Published online: 25 Aug 2022

References

  • Abu Nemeh, M. 2012. Multi-criteria decision making model for the selection of a construction contractor in Saudi Arabia.s[Master Thesis]. King Fadh University of Petroleum andsMinerals; 2012. 1–186.
  • Al-Harbi, K. 2001 Application of the AHP in project Management, International Journal of Project Management. 19: 19–27. . : .
  • Al-Reshaid, K., and N. Kartam, ”Design–build Pre-Qualification and Tendering Approach for Public Projects,” Department of Civil Engineering, College of Engineering, Kuwait University Construction Program, Major Projects, Administration, Kuwait University, 17 November 2004.
  • Aladdin, A., B. H. Samer, B. Barkokebas, B. Ahmed, and H. Mohamed. 2019. “A BIM-based Automation of Design and Drafting for Manufacturing of Wood Panels for Modular Residential Buildings.” International Journal of Construction Management 19 (3): 187–205. doi:10.1080/15623599.2017.1411458.
  • AlBogamy, A., D. Scott, and N. Dawood. 2012. “Addressing Construction Delays in the Kingdom of Saudi Arabia.” International Proceedings of Economics Development & Research, 45, pp. 148.
  • AlMutairi, S. 2017. “Assessment and Develop the Saudi’s Contractors Classification System.” Ph.D. Dissertation, Arizona State University.
  • Alshamrani, O. 2012. “Evaluation of School Buildings Using Sustainability Measures and Life- Cycle Costing Technique.” PhD Dissertation, Concordia University.
  • Aparna, S., S. Senaratne, and Y. G. Sandanayake. 2018. “Methodology to Extract Underlying Basic Assumptions of a Public Sector Construction Project Culture: An Exploratory Case Study.” International Journal of Construction Management 18 (6): 467–481. doi:10.1080/15623599.2017.1338130.
  • Awal, S. M. 2010. Contractor Selection in Ghana,” Department of Building Technology. February. Ghana: Kwame Nkrumah University Of Science And Technology In Partial Fulfilment.
  • Beale and Company. 2016. “The Future of Saudi Arabia: Opportunities and Challenges in Infrastructure Projects and Beyond.” [Online]. August. Accessed 05 September 2018. http://www.beale-law.com
  • Bubshait, A., and K. AL-Gobail, and Member, ASCE. 1966. “Contractor Prequalification in Saudi Arabia.” March.
  • Chee, H. W., D. H. Gary, and A. C. Patricia. 2010. “Lowest Price or Value? Investigation of UK construction clients’ tender selection process,” United Kingdom: Construction Management and Economics.
  • Chen, Z.-S., X. Zhang, W. Pedrycz, X.-J. Wang, and M. J. Skibniewski. 2020. “Bid Evaluation in Civil Construction under Uncertainty: A Two-Stage LSP-ELECTRE III-Based Approach.” Engineering Applications of Artificial Intelligence 94 (September 2020): 103835. doi:10.1016/j.engappai.2020.103835.
  • Chen, Z.-S., X. Zhang, R. M. Rodríguez, W. Pedrycz, and L. Martínez. 2021. “Expertise-based Bid Evaluation for construction-contractor Selection with Generalized Comparative Linguistic ELECTRE III.” Automation in Construction 125: 103578. doi:10.1016/j.autcon.2021.103578.
  • Cheng, E., and H. Li. 2004. Contractor Selection Using the Analytic Network. Kowloon, Hong Kong: Department of Building and Real Estate, The Hong Kong Polytechnic University, Hunghom. January 09.
  • Contractors classification agency. 2017. [Online]. Accessed 11 September 2018. https://contractors.momra.gov.sa/Classification_Fields.aspx
  • Daniel, K., B. Nathan, F. Nicholas, and C. Nicholas. 2020. “Productivity Enablers and Inhibiting Health and Wellbeing Practices of South Australian Construction site-based Workers: A Qualitative Study.” International Journal of Construction Management 20 (8): 882–899. doi:10.1080/15623599.2018.1496538.
  • Edmundas, K. Z. 2015. Selecting a Contractor by Using a Novel Method forMultiple Attribute Analysis: Weighted Aggregated Sum Product Assessment with Grey Values (WASPAS-G). Romania: Vilnius Gediminas Technical University.
  • El-Sawalhi, N., et al. 2007. “.” In BuHu (Built a Human Environmental Research Institute), School of Construction and Property ManagementEl-Sawalhi, N., Eaton, D., & Rustom, R. (2007). Contractor pre-qualification model: State-of-the-art. International Journal of Project Management, 25(5), 465–474. doi:10.1016/J.IJPROMAN.2006.11.011
  • Enshassi, A. E. 2014. Contractors’ Selection Criteria: Opinions Of Palestinian Construction Professionals. Gaza City, Gaza Strip - Palestinian: Department of Civil Engineering, IUG, P O Box 223. February.
  • Halil, F. 2007. “Contractor’s Perception of the Use of Statistical Approach in the Tender Evaluation at the Public Works Department, Malaysia.” American Journal of Applied Sciences 4 (12): 1084–1089. doi:10.3844/ajassp.2007.1084.1089.
  • Hatush, Z., and M. Skitmore. 1998. “Contractor Selection Using Multiciteria Utility Theory: An Additive Model.” Building and Environment 33(2–3), 105–15. .
  • Holt, G. D., P. O. Olomolaiye, and F. C. H. 1995. “Applying multi-attribute Analysis to Contractor Selection Decisions.” European Journal of Purchasing and Supply Management 1: 139–148 .
  • Ismail, H., ”Project Managmant, ” Planning Engineer, 06 November 2013. [Online]. Available: https://planningengineer.net/delays-construction-projects-ksa-2/. [Accessed 06 November 2013].
  • Jeddah Chamber. 2016. “Construction and real-estate Sector, Technical Report.” [Online]. March. Accessed 05 September 2018. https://www.jcci.org.sa/
  • Khoso, A. R., A. M. Yusof, Z.-S. Chen, X.-J. Wang, M. J. Skibniewski, and N. A. Memon. 2021. “Embedded Remote Group Environment through Modification in MACBETH – An Application of Contractor’s Selection in Construction.” Journal of Civil Engineering and Management 27 (8): 595–616. doi:10.3846/jcem.2021.15763.
  • Liu, X., Z. Zhang, and W. Qi. 2021. “The Strategy Analysis of Grouped Bid Evaluation in Reverse Auction: A Tripartite Evolutionary Game Perspective.” IEEESystemsJournal. doi:10.1109/JSYST.2021.3066370.
  • Paul, N. 2015. A Global Forcast for the Construction Industry 2030. 21 Broadwall, London SE1 9PL United Kingdom: Global Construction Perspectives and Oxford Economics Broadwall House.
  • Plebankiewicz, E. Construction Contractor Prequalification From Polish Clients’ Perspective. Kraków, Poland:Institute of Building and Transport Management, Cracow University of Technology, Warszawska. Vol. 24. 31–155 .12 June 2009.
  • Saleem, M., and A. Hosoda. 2021. “Development and Testing of Glow-in-the-Dark Concrete Based Raised Pavement Marker for Improved Traffic Safety.” Journal of Civil Engineering and Management 27 (5): 278–287. doi:10.3846/jcem.2021.14902.
  • Saleem, M., I. B. Nawaf, S. D. O. Alshamrani, and B. Abdulaziz. 2019. “Fundamental Investigation of Solid Waste Generation and Disposal Behavior in Higher Education Institute of Kingdom of Saudi Arabia.” Indoor and Built Environment 28 (7): 927–937. doi:10.1177/1420326X18804853.
  • SCA. 2018. “Statistical Report of Contracting Sector, Statistical Report.” [Online]. https://www.muqawil.org/public/publications/22382cf1827f13e0c8d180b742f29aaeec1a8524.pdf
  • Sodangi, M., A. F. Salman, and M. Saleem. 2018. “Building Information Modeling: Awareness across the Subcontracting Sector of Saudi Arabian Construction Industry.” Arabian Journal of Science and Engineering 43 (4): 1807–1816. doi:10.1007/s13369-017-2756-z.
  • Somboonpisan, J., and L. Charinee. 2021. “Environmental Weight for Bid Evaluation to Promote Sustainability in Highway Construction Projects.” Journal of Construction Engineering and Management 147 (4, April): 202. doi:10.1061/(ASCE)CO.1943-7862.0002005.
  • “Specialize in the Issuance of a Certificate Classification of Saudi and Foreign Contractors and Engineering Consulting Offices.” 2015. [ Online]. Accessed 10 September 2018. http://www.tasneef.com.sa/en/services/4/Classification-Certificate/
  • Turskis, Z. 2008.“MULTI-ATTRIBUTE CONTRACTORS RANKING METHOD BY APPLYING ORDERING OF FEASIBLE ALTERNATIVES OFsSOLUTIONS IN TERMS OF PREFERABILITY TECHNIQUE.“ In Technological and economic development Baltic Journal on Sustainability 14 (2): 224–239. doi:10.3846/1392-8619.2008.14.224-239.
  • Watt, D. J., B. Kayis, and K. Willey. 2008. Identifying Key Factors in the Evaluation of Tenders for Projects and Services. Sydney, NSW 2052, Australia: University of New South Wales, Faculty of Engineering. February 29.
  • Zavadskas, E., F. Peldschus, and A. Kaklauskas. 1994. Multiple Criteria Evaluation of Projects in Construction. Technika: Vilnius.
  • Zedan, H., and S. Martin. 1997. “Evaluating Contractor Prequalification Data: Selection Criteria and Project Success Factors.” Construction Management and Economics 15 (2): 129–147. doi:10.1080/01446199700000002.
  • Zedan, H., and S. Martin. 1998. “Contractor Selection Using Multiciteria Utility Theory: An Additive Model.” Building and Environment 33 (2–3): 105–115.