Towards self-recovering construction schedules: a new method for periodically updating project plans and optimizing recovery actions

, &
Pages 2335-2347 | Received 08 Sep 2021, Accepted 24 Nov 2022, Published online: 21 Dec 2022

References

  • Abdul-Rahman, H., M. A. Berawi, A. R. Berawi, O. Mohamed, M. Othman, and I. A. Yahya. 2006. “Delay Mitigation in the Malaysian Construction Industry.” Journal of Construction Engineering and Management 132 (2): 125–133. doi:10.1061/(ASCE)0733-9364(2006)132:2(125).
  • Agyei, W. 2015. “And CPM Techniques With Linear Programming : Case Study.” International Journal of Scientific & Technology Research.
  • Al-Zwainy, F. M. S., H. A. Rasheed, and H. F. Ibraheem. 2012. “Development of the Construction Productivity Estimation Model Using Artificial Neural Network for Finishing Works for Floors with Marble.” ARPN Journal of Engineering and Applied Sciences.
  • Babu, A. J. G., and N. Suresh. 1996. “Project Management with Time, Cost, and Quality Considerations.” European Journal of Operational Research 88 (2): 320–327. doi:10.1016/0377-2217(94)00202-9.
  • Ballesteros-Pérez, P., K. M. Elamrousy, and M. C. González-Cruz. 2019. “Non-linear time-cost trade-off Models of Activity Crashing: Application to Construction Scheduling and Project Compression with fast-tracking.” Automation in Construction 97 (November 2018): 229–240. doi:10.1016/j.autcon.2018.11.001.
  • Durdyev, S., M. Omarov, and S. Ismail. 2017. “Causes of Delay in Residential Construction Projects in Cambodia.” Cogent Engineering 4 (1): 1291117. doi:10.1080/23311916.2017.1291117.
  • Feylizadeh, M. R., A. Mahmoudi, M. Bagherpour, and D. F. Li. 2018. “Project Crashing Using A Fuzzy multi-objective Model considering Time, Cost, Quality and Risk under Fast Tracking Technique: A Case Study.” Journal of Intelligent and Fuzzy Systems 35 (3): 3615–3631. doi:10.3233/JIFS-18171.
  • Gerek, I. H., E. Erdis, G. Mistikoglu, and M. Usmen. 2015. “Modelling Masonry Crew Productivity Using Two Artificial Neural Network Techniques.” Journal of Civil Engineering and Management. doi:10.3846/13923730.2013.802741.
  • Guida, P. L., and G. Sacco. 2019. “A Method for Project Schedule Delay Analysis.” Computers and Industrial Engineering 128 (December 2018): 346–357. doi:10.1016/j.cie.2018.12.046.
  • Hady, H. N., L. A. Al-Kindi, and M. A. Mahmoud (2020). “Construction Project Planning Using Integration of Crashing and Concurrency Techniques.” IOP Conference Series: Materials Science and Engineering. Istanbul, Turkey, 737(1). https://iopscience.iop.org/article/10.1088/1757-899X/737/1/012037/meta
  • Harun, T., P. Gul, D. Atilla, and A. Firat Dogu. 2020. “Project Crashing with Crash Duration Consumption Rate: An Illustrative Example.” 56–64. doi:10.3311/ccc2020-046.
  • Heravi, G., and E. Eslamdoost. 2015. “Applying Artificial Neural Networks for Measuring and Predicting Construction-Labor Productivity.” Journal of Construction Engineering and Management 141 (10). doi:10.1061/(asce)co.1943-7862.0001006.
  • Jang, H., K. Kim, J. Kim, and J. Kim. 2011. “Labour Productivity Model for Reinforced Concrete Construction Projects.” Construction Innovation 11 (1): 92–113. doi:10.1108/14714171111104655.
  • Leu, S. S., A. T. Chen, and C. H. Yang. 2001. “A GA-based Fuzzy Optimal Model for Construction time-cost trade-off.” International Journal of Project Management 19 (1): 47–58. doi:10.1016/S0263-7863(99)00035-6.
  • li, H., P. E. D. Love, and D. S. Drew. 2000. “Effects of Overtime Work and Additional Resources on Project Cost and quality.” Engineering, Construction and Architectural Management 7 (3): 211–220. doi:10.1108/eb021146.
  • Lock, D. 2017. “The Essentials of Project Management, Fourth Edition.” The Essentials of Project Management. Fourth Edition. doi:10.4324/9781315239941.
  • Martens, A., and M. Vanhoucke. 2019. “The Impact of Applying Effort to Reduce Activity Variability on the Project Time and Cost Performance.” European Journal of Operational Research 277 (2): 442–453. doi:10.1016/j.ejor.2019.03.020.
  • Perera, N. A., M. Sutrisna, and T. W. Yiu. 2016. “Decision-Making Model for Selecting the Optimum Method of Delay Analysis in Construction Projects.” Journal of Management in Engineering 32 (5). doi:10.1061/(asce)me.1943-5479.0000441.
  • Rivas, R. A., J. D. Borcherding, V. González, and L. F. Alarcón. 2011. “Analysis of Factors Influencing Productivity Using Craftsmen Questionnaires: Case Study in a Chilean Construction Company.” Journal of Construction Engineering and Management 137 (4): 312–320. doi:10.1061/(asce)co.1943-7862.0000274.
  • Shaik, N. B., S. R. Pedapati, S. A. Ammar Taqvi, A. R. Othman, and F. A. Abd Dzubir. 2020. “A feed-forward Back Propagation Neural Network Approach to Predict the Life Condition of Crude Oil Pipeline.” Processes 8 (6): 661. doi:10.3390/PR8060661.
  • Sindhu, J., K. Choi, S. Lavy, Z. K. Rybkowski, B. F. Bigelow, and W. Li. 2018. “Effects of Front-End Planning under Fast-Tracked Project Delivery Systems for Industrial Projects.” International Journal of Construction Education and Research 14 (3): 163–178. doi:10.1080/15578771.2017.1280100.
  • Umit Dikmen, S., and M. Sonmez. 2011. “An Artificial Neural Networks Model for the Estimation of Formwork Labour.” Journal of Civil Engineering and Management. doi:10.3846/13923730.2011.594154.
  • Yu, Y., W. Umer, X. Yang, and M. F. Antwi-Afari. 2021. “Posture-related Data Collection Methods for Construction Workers: A Review.” Automation in Construction 124 (November 2019): 103538. doi:10.1016/j.autcon.2020.103538.