7,487
Views
21
CrossRef citations to date
0
Altmetric
Original Articles

Factors affecting the productivity of building craftsmen ‐ studies of Uganda

, &
Pages 169-176 | Received 10 Nov 2006, Accepted 06 Mar 2007, Published online: 14 Oct 2010

References

  • EGAN , J. 1998 . “ SIR ” . In Rethinking Construction , 25 London : DETR . HMSO
  • LIM , E. C. and ALUM , J. 1995 . Construction Productivity: issues encountered by contractors in Singapore . International Journal of Project Management, , 13 ( 1 ) : 51 – 58 .
  • KAMING , P. F. , OLOMOLAIYE , P. O. , HOLT , G. and HARRIS , F. 1997 . Factors influencing craftsmen productivity in Indonesia . International Journal of Project Management, , 15 ( 1 ) : 21 – 30 .
  • OLOMOLAIYE , P. , WAHAB , K. and PRICE , A. 1987 . Problems influencing craftsmen productivity in Nigeria . Building and Environment, , 22 ( 4 ) : 317 – 323 .
  • Uganda Bureau of Statistics . 2005 . Statistical abstract , 14 Government of Uganda .
  • World Bank . 1984 . The construction industry issues and strategies in developing countries , 42 Washington DC : World Bank .
  • FDI trends . 2004 . “ Looking beyond the current gloom in developing countries ” . 3
  • UNABCEC . 2004 . Improving Uganda's construction industry . Construction Review, , 15 ( 10 ) : 18 – 19 .
  • MUBIRU , F. 2001 . Comparative analysis of bidding strategies of contractors in Uganda. , 42 Kampala : Makerere University . MSc thesis
  • KAMING , P F. , HOLT , G. D. , KOMETA , S. T. and OLOMOLAIYE , P. 1998 . Severity diagnosis of productivity problems ‐ a reliability analysis . International Journal of Project Management, , 16 ( 2 ) : 107 – 113 .
  • MOTWANI , J. , KUMAR , A. and NOVAKOSKI , M. 1995 . Measuring construction productivity: a practical approach . Work Study, , 44 ( 8 ) : 18 – 20 .
  • YATES , J. K. and GUHATHAKURTA , S. 1993 . International labour productivity . Cost Engineering, , 35 ( 1 ) : 15 – 26 .
  • KHEON , E. and BROWN , G. 1986 . International labour productivity factors . Journal of Construction Engineering and Management, , 112 ( 2 ) : 299 – 302 .
  • BORCHERDING , J. D. 1976 . Improving productivity in industrial construction . Journal of the Construction Division, , 102 ( C04 ) : 599 – 614 .
  • POLAT , G. and ARDITI , P. 2005 . The JIT management system in developing countries . Construction Management and Economics, , 23 ( 7 ) : 697 – 712 .
  • MCKIM , R. , HEZAGY , T. and ATTALA , M. 2000 . Project performance control in reconstruction projects . Journal of Construction Engineering and Management, , 126 ( 2 ) : 137 – 141 .
  • ATKINSON , A. , WATERHOUSE , J. and WELLS , R. 1997 . A stakeholder approach to strategic performance measurement . Sloan Management Review, , 38 ( 3 ) : 25 – 37 .
  • ABDUL‐HADI , N. , AL‐ SUD AIRI , A. and ALQAHTANI , S. 2005 . Prioritising barriers to successful business process re‐engineering (BPR) efforts in Saudi Arabian construction industry . Construction Management and Economics, , 23 ( 3 ) : 305 – 315 .
  • TEICHOLZ , P. , GOODRUM , P. M. and HAAS , C. T. U.S. 2001 . Construction labour productivity trends, 1970 ‐1998 . Journal of Construction Engineering and Management, , 127 ( 5 ) : 427 – 429 .
  • CASLER , S. D. and GALLATIN , M. S. 1997 . Sectoral contributions to Total Factor Productivity: Another perspective on the growth showdown . Journal of Macroeconomics, , 19 ( 2 ) : 381 – 393 .
  • GRUNBERG , T. 2003 . A review of improvement methods in manufacturing operations . Work study, , 52 ( 2 ) : 89 – 93 .
  • HANSSEN , G. A. 1997 . Automating Business Process Re‐engineering: using the power simulation strategies in improving performance and profit. , 2nd ed , New Jersey : Prentice Hall .
  • MAKULSAWATUDOM , A. and EMSLEY , M. 2002 . Critical factors influencing construction productivity in Thailand . Proc of CIB 10th International Symposium Construction Innovation and Global Competitiveness . Sept 9–13 2002 , Cincinnati, Ohio, USA. pp. 182
  • ZAKERI , M. , OLOMOLAIYE , P. , HOLT , G. and HARRIS , F. 1996 . A survey of constraints on Iranian construction operatives’ productivity . Construction Management and Economics, , 14 ( 5 ) : 417 – 426 .
  • LEMA , M. N. 1996 . Construction labour productivity analysis and benchmarking ‐ the case of Tanzania. , 74 UK : Loughborough University . PhD thesis
  • ROSEFIELDE , S. and QUINN MILLS , D. 1979 . Is construction technologically stagnant? The construction industry: balance wheel of the economy , Edited by: Lange , J. and Mills , D. 90 Lexington : Lexington Books .
  • FELLOWS , R. and LIU , A. 2003 . Research Methods for Construction. , 2nd ed , 54 Oxford : Blackwell Science .
  • FERBER , R. 1980 . Readings in the analysis of survey data. , 77 New York : American Marketing Association .
  • KOTHARI , C. R. 2003 . Research methodology, methods and techniques. , 45 New Delhi : Wisha Prakashan .
  • SIEGEL , S. and CASTELLAN , N. J. 1998 . Non‐parametric statistics for behavioural sciences. , 2nd ed , 59 London : McGraw‐Hill International Editions .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.