1,952
Views
8
CrossRef citations to date
0
Altmetric
Review Article

A methodical literature review on application of Lean & Six Sigma in various industries

ORCID Icon & ORCID Icon
Pages 107-121 | Received 05 Dec 2018, Accepted 14 Feb 2019, Published online: 08 Mar 2019

References

  • Abed, A. M. 2015. “Create Heijunka 5’s Matrix to Control the Dynamic Gemba as Lean Tool.” Journal of Human Resource Management 3 (2): 6–16. doi:10.11648/j.jhrm.20150302.11.
  • Adnan, H., and A. R. Bakri. 2012. “Boosting Lean Production via TPM.” International Congress on Interdisciplinary Business and Social Science 2012, Procedia - Social and Behavioral Sciences 65: 485–491.
  • Adrian Pugna, R. N. 2016. “Using Six Sigma Methodology to Improve the Assembly Process in an Automotive Company.” SIM 2015/13th International Symposium in Management, Procedia - Social and Behavioral Sciences 221: 308–316.
  • Agostino Villa, T. T. 2013. “From JIT to Seru, for a Production as Lean as Possible.” The Manufacturing Engineering Society International Conference, MESIC 2013, Procedia Engineering 63: 956–965.
  • Ahmad Naufal, A. J. 2012. “Development of Kanban System at Local Manufacturing Company in Malaysia – Case Study.” International Symposium on Robotics and Intelligent Sensors 2012 (IRIS 2012), Procedia Engineering 41: 1721–1726.
  • Akhil Khajuria, A. R. 2018. “Implementation of DMAIC Six Sigma Principle in Thermoforming for Improving Rate of Production.” International Journal For Research In Mechanical & Civil Engineering 4 (1): 13–22.
  • Alaa Alshammari, S. R. 2018. “Quality Improvement in Plastic Injection Molding Industry: Applying Lean Six Sigma to SME in Kuwait.” Proceedings of the International Conference on Industrial Engineering and Operations Management, Bandung, Indonesia, March 6–8, 2018.
  • Al-Akel Karam, M. L. 2018. “The Contirubtion of Lean Manufacturing Tools to Changeover Time Decrease in the Pharmaceutical Industry. A SMED Project.” 11th International Conference Interdisciplinarity in Engineering, INTER-ENG 2017, Procedia Manufacturing 22: 886–892.
  • Alves, M. J., P. Junior, and J. V. Mendes. 2017. “Operational Practices of Lean Manufacturing: Potentiating Environmental Improvements.” Journal of Industrial Engineering and Management, JIEM, 2017 10 (4): 550–580.
  • Amine Belhadi, F. E. 2016. “A Framework for Effective Implementation of Lean Production in Small and Medium-Sized Enterprises.” Journal of Industrial Engineering and Management, JIEM, 2016 – 9 (3): 786–810.
  • Ashish Mishra, P. M. 2015. “Six Sigma Methodology in a Plastic Injection Molding Industry: A Case Study.” International Journal of Industrial Engineering and Technology 7 (1): 15–30.
  • Azizi, A., and T. A. Manoharan. 2015. “Designing a Future Value Stream Mapping to Reduce Lead Time Using SMED – A Case Study.” 2nd International Materials, Industrial, and Manufacturing Engineering Conference, MIMEC2015, Procedia Manufacturing 2: 153–158.
  • Barbosa, G. F., J. de Carvalho, and C. H. Pereira de Souza. 2014. “Deployment of a Laser Projection Solution for Stripes Plotting Based on Six Sigma DMAIC Methodology Applied to Aircraft Painting Shop.” Production & Manufacturing Research 697–711. doi:10.1080/21693277.2014.943432.
  • Ben Ruben, R., and S. Vinodh. 2017. “Implementation of Lean Six Sigma Framework with Environmental Considerations in an Indian Automotive Component Manufacturing Firm: A Case Study.” Production Planning & Control 28: 1–19.
  • Borges Lopes, R., F. Freitas, and I. Sousa. 2015. “Application of Lean Manufacturing Tools in the Food and Beverage Industries.” Journal of Technology Management & Innovation 2015 10 (3): 120–130. doi:10.4067/S0718-27242015000300013.
  • Brito, M., and A. L. Ramos. 2017. “Combining SMED Methodology and Ergonomics for Reduction of Setup in a Turning Production Area.” Manufacturing Engineering Society International Conference 2017, MESIC 2017, Procedia Manufacturing 13: 1112–1119.
  • Cabrita, M. D. R., and J. P. Domingues. 2015. “Application of Lean Six-Sigma Methodology to Reducing Production Costs: Case Study of a Portuguese Bolts Manufacturer.” International Journal of Management Science and Engineering Management 11: 1–9.
  • Cheung, W. M., J. T. Leong, and P. Vichare. 2017. “Incorporating Lean Thinking and Life Cycle Assessment to Reduce Environmental Impacts of Plastic Injection Moulded Products.” Journal of Cleaner Production 167: 759–775. doi:10.1016/j.jclepro.2017.08.208.
  • Ching, N. T., and T. S. Hong. 2015. “The Analysis of Lean Manufacturing Tools in Malaysia’s Manufacturing Industry.” Journal of Scientific Research and Development 2: 95–100.
  • Choomlucksana, J., and M. Ongsaranakorn. 2015. “Mproving the Productivity of Sheet Metal Stamping Subassembly Area Using the Application of Lean Manufacturing Principles.” 2nd International Materials, Industrial, and Manufacturing Engineering Conference, MIMEC2015, Procedia Manufacturing 2: 102–107.
  • Costa, T., and F. J. G. Silva. 2017. “Improve the Extrusion Process in Tire Production Using Six Sigma Methodology.” Manufacturing Engineering Society International Conference 2017, MESIC 2017, 28–30 June 2017, Procedia Manufacturing 13: 1104–1111.
  • de Bucourt, M., R. Busse, F. Güttler, C. Wintzer, F. Collettini, C. Kloeters, B. Hamm, and U. K. Teichgräber. 2011. “Lean Manufacturing and Toyota Production System Terminology Applied to the Procurement of Vascular Stents in Interventional Radiology.” Insights into Imaging 415–423. doi:10.1007/s13244-011-0097-0.
  • Desai, D. A., P. Kotadiya, N. Makwana, and S. Patel. 2015. “Curbing Variations in Packaging Process through Six Sigma Way in a Large-Scale Food-Processing Industry.” Journal of Industrial Engineering International 119–129. doi:10.1007/s40092-014-0082-6.
  • Ferradas, P. G., and K. Salonitis. 2013. “Improving Changeover Time: A Tailored SMED Approach for Welding Cells.” Forty Sixth CIRP Conference on Manufacturing Systems 2013, Procedia CIRP 7: 598–603.
  • Halim, N. H. A., and N. Yusuf. 2015. “Effective Material Handling System for JIT Automotive Production Line.” 2nd International Materials, Industrial, and Manufacturing Engineering Conference, MIMEC2015, Procedia Manufacturing 2: 251–257.
  • Hardik, B., and S. Pandya. 2015. “Lean Manufacturing Implementation Using Value Stream Mapping in an Automotive Industry.” International Journal of Advance Engineering and Research Development 2(5): 812–822. May −2015.
  • Jayachitra, R. 2016. “Quality Enhancement in Plastic Manufacturing Industry Using Six Sigma Methodology.” International Journal of Engineering and Robot Technology. 3(1): 7–19.
  • Karstoft, J., and L. Tarp. 2011. “Is Lean Management Implementable in a Department of Radiology?” Insights into Imaging 267–273. doi:10.1007/s13244-010-0044-5.
  • Karthik, B. S., and S. Vinodh. 2016. “Application of Lean Approach for Reducing Weld Defects in a Valve Component: A Case Study.” International Journal of Lean Six Sigma 8: 181–209.
  • Khawale, Y. S. (2017). “Implementation of Six Sigma Methodology for Piston Rod Manufacturing.” Global Research and Development Journal for Engineering 2 (3). February 2017. 14–18.
  • Kumar, M., J. Antony, R. K. Singh, M. K. Tiwari, and D. Perry. 2006. “Implementing the Lean Sigma Framework in an Indian SME: A Case Study.” Production Planning & Control 17 (4): 407–423. doi:10.1080/09537280500483350.
  • Kumar, M. K., and A. J. Rajan. 2014. “Application of Lean Manufacturing in Mass Production System: A Case Study in Indian Manufacturing Unit.” Proceedings of the 2014 IEEE IEEM, Bandar Sunway, Malaysia, 702–706.
  • Lata, K. M. 2016. “Implementation of Lean Manufacturing in a Plastic Grain Manufacturing Company in India: A Case Study.” Journal of Material Science and Mechanical Engineering 3: 395–400.
  • Lucherini, F., and M. Rapaccini. 2017. “Exploring the Impact of Lean Manufacturing on Flexibility in SMEs.” Journal of Industrial Engineering and Management 10 (5): 919–945.
  • Marques, P. A. D. A., and R. Matthé. 2016. “Six Sigma DMAIC Project to Improve the Performance of an Aluminum Die Casting Operation in Portugal.” International Journal of Quality & Reliability Management 34: 307–330.
  • Mikva, M., and V. Prajová. 2016. “Standardization – One of the Tools of Continuous Improvement.” International Conference on Manufacturing Engineering and Materials, ICMEM 2016, Procedia Engineering 149: 329–332.
  • Muller, E., T. Stock, and R. Schillig. 2014. “A Method to Generate Energy Value-Streams in Production and Logistics in Respect of Time- and Energy-Consumption.” Production Engineering Res. Devel: 243–251. doi:10.1007/s11740-013-0516-9.
  • Mwanza, B. G., and C. Mbohwa. 2015. “Design of a Total Productive Maintenance Model for Effective Implementation: Case Study of a Chemical Manufacturing Company.” Industrial Engineering and Service Science 2015, IESS 2015, Procedia Manufacturing 4: 461–470.
  • Nguyen, M.-N., and N. H. Do. 2016. “Re-Engineering Assembly Line with Lean Techniques.” 13th Global Conference on Sustainable Manufacturing - Decoupling Growth from Resource Use Procedia CIRP 40: 590–595.
  • Noorwali, A. 2013. “Apply Lean and Taguchi in Different Level of Variability of Food Flow Processing System.” The Manufacturing Engineering Society International Conference, MESIC 2013, Procedia Engineering 63: 728–734.
  • Nurazree Mahmud, M. F., and M. F. Hilmi. 2014. “TQM and Malaysian SMEs Performance: The Mediating Roles of Organization Learning.” Procedia - Social and Behavioral Sciences 130 (2014): 216–225. doi:10.1016/j.sbspro.2014.04.026.
  • Oliveira, J., and J. C. Sá. 2017. “Continuous Improvement through ‘Lean Tools’ an Application in Mechanical Company.” Manufacturing Engineering Society Interna-tional Conference 2017, MESIC 2017, 28–30 June 2017, Procedia Manufacturing 13: 1082–1089.
  • Phaniraj, K., and A. L. Venkatesh. 2015. “Lean Construction: A Case Study at Precast Plant.” International Journal of Engineering Research & Technology (IJERT) 4 (05): 823–827.
  • Prakash, J., and J. F. Chin. 2014. “Implementation of Hybrid Parallel kanban-CONWIP System: A Case Study.” Cogent Engineering 8: 1–15.
  • Rahani, A. R., and M. Al-Ashraf. 2012. “Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study.” International Symposium on Robotics and Intelligent Sensors 2012 (IRIS 2012), Procedia Engineering 41: 1727–1734.
  • Rahman, N. A. A., and S. M. Sharif. 2013. “Lean Manufacturing Case Study with Kanban System Implementation.” International Conference on Economics and Business Research 2013 (ICEBR 2013), Procedia Economics and Finance 7: 174–180.
  • Ranteshwar Singh, A. M. 2013. “Total Productive Maintenance (TPM) Implementation in a Machine Shop: A Case Study.” Chemical, Civil and Mechanical Engineering Tracks of 3rd Nirma University International Conference of Engineering, Procedia Engineering 51: 592–599.
  • Rodriguez-Mendez, R., D. Sánchez-Partida, J. L. Martínez-Flores, and E. Arvizu-BarrÓn. 2015. “A Case Study: SMED & JIT Methodologies to Develop Continuous Flow of Stamped Parts into AC Disconnect Assembly Line in Schneider Electric Tlaxcala Plant.” International Federation of Automatic Control -Papersonline 48 (3): 1399–1404.
  • Rohani, J. M., and S. M. Zahraee. 2015. “Production Line Analysis via Value Stream Mapping: A Lean Manufacturing Process of Color Industry.” 2nd International Materials, Industrial, and Manufacturing Engineering Conference, MIMEC2015, Procedia Manufacturing 2: 6–10.
  • Rohini, R., and J. Mallikarjun. 2011. “Six Sigma: Improving the Quality of Operation Theatre.” International Conference on Asia Pacific Business Innovation & Technology, Procedia - Social and Behavioral Sciences 25: 273–280.
  • Rojasra, P. M., and M. N. Qureshi. 2013. “Performance Improvement through 5S in Small Scale Industry: A Case Study.” International Journal of Modern Engineering Research (IJMER) 3(3): 1654–1660. May – June 2013.
  • Roriz, C., and E. Nunes. 2017. “Application of Lean Production Principles and Tools for Quality Improvement of Production Processes in a Carton Company.” 27th International Conference on Flexible Automation and Intelligent Manufacturing, Procedia Manufacturing 11: 1069–1076.
  • Rosa, C., and F. J. G. Silva. 2017a. “SMED Methodology: The Reduction of Setup Time for Steel Wire-Rope Assembly Line in the Automotive Industry.” Manufacturing Engineering Society International Conference 2017, MESIC 2017, 28–30 June, Procedia Manufacturing 13: 1034–1042.
  • Sabaghi, M., R. Rostamzadeh, and C. Mascle. 2015. “Kanban and Value Stream Mapping Analysis in Lean Manufacturing Philosophy via Simulation: A Plastic Fabrication (Case Study).” International Journal of Services and Operations Management 118–140. doi:10.1504/IJSOM.2015.065977.
  • Sajeev, D., and M. Vinod. 2013. “Implementation of Six Sigma Methodology in a Blood Bag Manufacturing Company.” International Journal of Innovative Research in Science, Engineering and Technology 2 (1): 754–763.
  • Sambhe, R. U., Dr. 2012. “Six Sigma Practice for Quality Improvement – A Case Study of Indian Auto Ancillary Unit.” IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) 4 (4): 26–42. doi:10.9790/1684.
  • Santosa, W. A., and M. Sugarindra. 2018. “Implementation of Lean Manufacturing to Reduce Waste in Production Line with Value Stream Mapping Approach and Kaizen in Division Sanding Upright Piano, Case Study In: PT. X.” MATEC Web of Conferences 154: 1–4.
  • Sethia, C. S., and P. N. Shende. 2014. “A Case Study on Total Productive Maintenance in Rolling Mill.” Journal of Emerging Technologies and Innovative Research (JETIR) 1 (5): 283–289.
  • Shogo Kanamori, S. S. 2015. “Implementation of 5S Management Method for Lean Healthcare at a Health Center in Senegal: A Qualitative Study of Staff Perception.” Global Health Action 8: 1–9.
  • Siyu Chen, S. F. 2017. “The Design of JMP/SAP Based Six Sigma Management System and Its Application in SMED.” 13th Global Congress on Manufacturing and Management, GCMM 2016, Procedia Engineering 174: 416–424.
  • Soraphon Kigsirisin, S. P. 2016. “Approach for Total Productive Maintenance Evaluation in Water Productivity: A Case Study at Mahasawat Water Treatment Plant.” 12th International Conference on Hydroinformatics, HIC 2016, Procedia Engineering 154: 260–267.
  • Sri Indrawati, M. R. 2015. “Manufacturing Continuous Improvement Using Lean Six Sigma: An Iron Ores Industry Case Application.” Industrial Engineering and Service Science 2015, IESS 2015, Procedia Manufacturing 4: 528–534.
  • Tenera, A. S. 2010. “Improving Setup Time in a Press Line – Application of the SMED Methodology.” International Federation of Automatic Control 43: 297–302.
  • Tomas Rohac, M. J. 2015. “Value Stream Mapping Demonstration on Real Case Study.” 25th DAAAM International Symposium on Intelligent Manufacturing and Automation, DAAAM 2014, Procedia Engineering 100: 520–529.
  • Upton, M. L. 2004. The Lean Six Sigma Pocket Toolbook. New York: McGraw-Hill Companies. ISBN: 97800715-05734.
  • Venkataraman, K., and B. V. Ramnath. 2014. “Application of Value Stream Mapping for Reduction of Cycle Time in a Machining Process.” 3rd International Conference on Materials Processing and Characterisation (ICMPC 2014), Procedia Materials Science 6: 1187–1196.
  • Venkateswaran, D. N. 2016. “Performance Improvement Through Six Sigma Methodologies – A Plastic Firm Case Approach.” International Journal of Engineering Technology, Management and Applied Sciences 4 (9): 49–60.
  • Veres, C., and L. Marian. 2018. “Case Study Concerning 5S Method Impact in an Automotive Company.” 11th International Conference Interdisciplinarity in Engineering, INTER-ENG 2017, Procedia Manufacturing 22: 900–905.
  • Vikash Gupta, R. J. 2017. “Six-Sigma Application in Tire-Manufacturing Company: A Case Study.” Journal of Ind Eng Int 14: 511–520.
  • Wei Xia, J. S. 2013. “Simulation Guided Value Stream Mapping and Lean Improvement: A Case Study of a Tubular Machining Facility.” Journal of Industrial Engineering and Management, JIEM, 2013 – 6 (2): 456–476.
  • Xu, Y., and M. Chen. 2016. “Improving Just-in-Time Manufacturing Operations by Using Internet of Things Based Solutions.” 9th International Conference on Digital Enterprise Technology - DET 2016 – “Intelligent Manufacturing in the Knowledge Economy Era, Procedia CIRP 56: 326–331.
  • Yildiz, B., and M. Ustaoğlu. 2012. “Optimal Production Level for Evs Manufacturing Process in Turkey: A Comparable Case of EMQ/JIT Production Model for Evs Battery Production.” 8th International Strategic Management Conference, Procedia - Social and Behavioral Sciences 58: 1482–1490. doi:10.1016/j.sbspro.2012.09.1135.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.