Social impact assessment of investment activities in the China–Pakistan economic corridor

ORCID Icon, , , , , & show all
Pages 331-347 | Received 18 Dec 2017, Accepted 12 Apr 2018, Published online: 30 Apr 2018

References

  • Abbasi SA , Abbasi N . 2000. The likely adverse environmental impacts of renewable energy sources. Appl Energy. 65:121–144.10.1016/S0306-2619(99)00077-X
  • [ADB] Asian Development Bank . 2009. Safeguard policy statement. https://www.adb.org/sites/default/files/institutional-document/32056/safeguard-policy-statement-june2009.pdf.
  • [AfDB] African Development Bank . 2015. Environmental and social assessment procedures. Abidjan: quality assurance and results department, compliance and safeguards division. http://www.afdb.org/leadmin/uploads/afdb/Documents/Publications/SSS_%E2%80%93vol1_%E2%80%93_Issue4_-_EN_-_Environmental_and_Social_Assessment_Procedures__ESAP_.pdf.
  • [AIIB] Asian Infrastructure Investment Bank . 2016. Environmental and social framework. http://www.aiib.org/upload.le/2016/0226/20160226043633542.pdf.
  • Aminbakhsh S , Gunduz M , Sonmez R . 2013. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects. J Saf Res. 46:99–105.10.1016/j.jsr.2013.05.003
  • Annette E , Vladimir S , Tim JE . 2009. Assessment of sustainability indicators for renewable energy technologies. Renew Sustain Energy Rev. 13:1082–1088.
  • Barrington DJ , Dobbs S , Loden DI . 2012. Social and environmental justice for communities of the Mekong River. Int J Eng Social Justice Peace. 1(1):31–49.10.24908/ijesjp.v1i1.3515
  • Barrow CJ . 2000. Social impact assessment: an introduction. London: Edward Arnold.
  • Blanton R , Blanton SL . 2016. Globalization and collective labor rights. Sociol Forum. 31(1):181–202. DOI:10.1111/socf.12239.
  • Bryan T , Yvonne B , Daming H . 2009. Social impacts of large dam projects: a comparison of international case studies and implications for best practice. J Environ Manage. 90:S249–S257.
  • Burdge RJ , Vanclay F . 1996. Social impact assessment: a contribution to the state of the art series. Impact Assess. 14(1):59–86. DOI:10.1080/07349165.1996.9725886.
  • Burdge RJ . 2003. The practice of social impact assessment background. Impact Assess Project Appraisal. 21(2):84–88. DOI:10.3152/147154603781766356.
  • Chen JD , Zhang JQ . 2016. Location of Sino-Pakistan economic corridor in ‘one belt one road’ construction. J Xinjiang Normal Uni (Philosophy And Social Sciences). 37(4):125–133.
  • Ding XQ , Shi S . 2004. Application of the analytic hierarchy process to project risk management. J Ocean Univ China. 34(1):97–102.
  • Dominique E , Pierre S . 2012. Social impact assessments of large dams throughout the world: lessons learned over two decades. Impact Assess Project Appraisal. 21(3):215–224. DOI:10.3152/147154603781766310.
  • Du XL , Deng SM . 2005. The application of analytic hierarchy process in venture investment project evaluation. J Nanchang Univ (Engineering & Technology). 27(4):63–66.
  • Egre D , Sececal P . 2003. Social impact assessments of large dams throughout the world: lessons learned over two decades. Impact Assess Project Appraisal. 21(3):215–224. DOI:10.3152/147154603781766310.
  • Esteves AM , Franks D , Vanclay F . 2012. Social impact assessment: the state of the art. Impact Assess Project Appraisal. 30(1):34–42. DOI:10.1080/14615517.2012.660356.
  • Esteves AM , Ivanova G . 2016. Using social and economic impact assessment to guide local supplier development initiatives. Handb Res Methods Appl Econ Geogr. 5:1–30. DOI:10.4337/9780857932679.00035.
  • Giuseppina S , Frauke U , Sour K , Pin DL . 2015. Hydropower, social priorities and the rural-urban development divide: the case of large dams in Cambodia. Energy Policy. 86:273–285.
  • He GZ , Mol APJ , Zhang L , Lu YL . 2015. Environmental risks of high-speed railway in China: public participation, perception and trust. Environ Dev. 14:37–52.10.1016/j.envdev.2015.02.002
  • Huang YY , Fischer TB , Xu H . 2017a. The stakeholder analysis for SEA of Chinese foreign direct investment: the case of ‘One Belt, One Road’ initiative in Pakistan. Impact Assess Project Appraisal. 35(2):158–171. DOI:10.1080/14615517.2016.1251698.
  • Huang H , Xu XY , Chen CJ . 2017b. The political risk and suggestions for Chinese enterprises’ investment in Pakistan. Int outlook. 2:132–148. DOI:10.13851/j.cnki.gjzw.201702008.
  • [IHA] International Hydropower Association . 2009. Hydropower sustainability assessment protocol. http://www.hydrosustainability.org/IHAHydro4Life/media/PDFs/PDF%20docs/language%20docs%20for%20draft%20hydropower%20sustainability/HSAF-Draft_HSAP_Section_I_August_2009-english.pdf.
  • [IIED] International Institute for Environment and Development, [WBCSD] World Business Council for Sustainable Development . 2001. Social impact assessment in the mining industry: current situation and future directions. IIED and WBCSD.
  • John P , Graham W . 2008. The Ex-ante and Ex-post economic and social impacts of the introduction of high-speed trains in South East England. Planning Pract Res. 23(3):403–422. DOI:10.1080/02697450802423641.
  • Karst TG , Wouter B , Bert VW . 2009. social impacts of transport: literature review and the state of the practice of transport appraisal in the Netherlands and the United Kingdom. Transp Rev. 29(1):69–90. DOI:10.1080/01441640802130490.
  • Kelly M , Desiree D . 2013. Cumulative biophysical impact of small and large hydropower development in Nu River, China. Water Resour Res. 49:3104–3118. DOI:10.1002/wrcr.20243.
  • [KGIW] Kashgar Government Information Website . 2017. National economy. http://www.kashi.gov.cn/Item/8758.aspx.
  • Kuenzer C , Campbell I , Roch M , Leinekugel P , Tuan VQ , Dech S . 2013. Understanding the impact of hydropower developments in the context of upstream-downstream relations in the Mekong river basin. Sustain Sci. 8:565–584.10.1007/s11625-012-0195-z
  • Lemos CC , Fischer TB , Souza MP . 2012. Strategic environmental assessment in tourism planning-Extent of application and quality of documentation. Environ Impact Assess Rev. 35:1–10.10.1016/j.eiar.2011.11.007
  • Li WY . 2009. Application of AHP analysis in risk management of engineering projects. J Beijing Univ Chem Technol (Social Sciences Edition). 65(1):46–48.
  • Li JH , Yang JM . 2005. An application of hierarchical analysis method in risk evaluation of mining project investment. Mining R&D. 25(6):9–12.
  • Lockie S . 2001. SIA in review: setting the agenda for impact assessment in the 21st century. Impact Assess Project Appraisal. 19(4):277–287.10.3152/147154601781766952
  • Malik AR , Chen XP . 2017. [Translator] the economic perspective of the China-Pakistan economic corridor. Pacific J. 25(5):92–99.
  • Marcus W , Andrea H , Peter J . 2012. Environmental and livelihood impacts of dams: common lessons across development gradients that challenge sustainability. Int J River Basin Manage. 10(1):73–92. DOI:10.1080/15715124.2012.656133.
  • Ministry of Foreign Affairs of the People’s Republic of China . 2015. Vision and Actions on jointly building silk road economic belt and 21st-century maritime silk road. http://www.fmprc.gov.cn/mfa_eng/zxxx_662805/t1249618.shtml.
  • Ministry of Planning, Development & Reform of Pakistan . 2018. Long term plan for China-Pakistan economic corridor (2017–2030). http://cpec.gov.pk/long-term-plan-cpec.
  • Meschtyb NA , Forbes BC , Kankaanpää P . 2005. Social Impact Assessment along Russia’s Northern Sea Route: petroleum transport and the Arctic Operational Platform (ARCOP). Arct Inst North Am. 58(3):322–327.
  • Peter J , Karen L . 2012. The social consequences of transport decision-making: clarifying concepts, synthesising knowledge and assessing implications. J Transp Geogr. 21:4–16.
  • Philip MF . 2014. Impacts of Brazil’s Madeira River Dams: unlearned lessons for hydroelectric development in Amazonia. Environ Sci Policy. 38:164–172.
  • Philip MF . 2002. Avanca Brasil: environmental and social consequences of Brazil’s planned infrastructure in Amazonia. Environ Manage. 30(6):735–747.
  • Phylip-Jones J , Fischer TB . 2013. EIA for wind farms in the United Kingdom and Germany. J Environ Assess Policy Manage. 15(2):1–30.
  • Phylip-Jones J , Fischer TB . 2015. Strategic environmental assessment (SEA) for wind energy planning: lessons from the United Kingdom and Germany. Environ Impact Assess Rev. 50:203–212.10.1016/j.eiar.2014.09.013
  • Saidur R , Rahim NA , Islam MR , Solangi KH . 2011. Environmental impact of wind energy. Renew Sustain Energy Rev. 15:2423–2430.10.1016/j.rser.2011.02.024
  • Shi S , Ning YM . 2005. Evolution on connotation of space in human geography. Scientia Geographica Sinica. 25(3):340–345.
  • Shi GQ , Zhang RL , Peng SP , Wu S , Tang B . 2017. Social risks evaluation of overseas investment pertaining to China-Pakistan economic corridor construction. J Hohai Univ (Philosophy And Social Sciences). 19(1):59–64.
  • Singh G . 2008. Mitigating environmental and social impacts of coal mining in India. Mining Engineers’ Journal. 8–24. (June), 8.
  • Stuart O , Jamie P , Ashok C , David D . 2012. Dams on the Mekong River: lost fish protein and the implications for land and water resources. Global Environ Change. 22:925–932.
  • Sukhan J , Adrian S . 2000. Resettlement for China’s Three Gorges Dam: socio-economic impact and institutional tensions. Communist Post-Communist Stud. 33:223–241.
  • Storey K , Jones P . 2003. Social impact assessment, impact management and follow-up: a case study of the construction of the Hibernia offshore platform. Impact Assess Project Appraisal. 21(2):99–107. DOI:10.3152/147154603781766400.
  • Sun JH . 2009. Application of comprehensive analytic hierarchy process evaluation model in project risk assessment. Stat Decis. 23:164–167. DOI:10.13546/j.cnki.tjyjc.2009.23.011.
  • Tang BS , Wong SW , Lau MCH . 2008. Social impact assessment and public participation in China: a case study of land requisition in Guangzhou. Environ Impact Assess Rev. 28:57–72.10.1016/j.eiar.2007.03.004
  • Teng MM , Han CF , Liu XH . 2014. Index system for social impact assessment of large scale infrastructure projects in China. China Popul Resour Environ. 09:170–176.
  • Tian JF , Yu Q . 2011. Application of analytic hierarchy process in port investment project evaluation. Commun Finance Account. 1:8–9. DOI:10.16144/j.cnki.issn1002-8072.2011.02.021.
  • Tu HZ , lin YH , Qiao YR . 2017. Visual analysis of the trend of terrorism in Pakistan. Southeast Asia South Asian Stud. 4:94–99.
  • Umair S , Björklund A , Petersen EE . 2015. Social impact assessment of informal recycling of electronic ICT waste in Pakistan using UNEP SETAC guidelines. Resour Conserv Recycl. 95:46–57. DOI:10.1016/j.resconrec.2014.11.008.
  • Vanclay F . 2017. Project-induced displacement and resettlement: from impoverishment risks to an opportunity for development? Impact Assess Project Appraisal. 35(1):3–21. DOI:10.1080/14615517.2017.1278671.
  • Vanclay F . 2003. International principles for social impact assessment. Impact Assess Project Appraisal. 21(1):5–12. DOI:10.3152/147154603781766491.
  • Vanclay F . 2012. The potential application of social impact assessment in integrated coastal zone management. Ocean Coast Manage. 68:149–156.10.1016/j.ocecoaman.2012.05.016
  • [WB] World Bank. Environmental and Social Framework . 2017. http://documents.worldbank.org/curated/en/383011492423734099/pdf/114278-REVISED-Environmental-and-Social-Framework-Web.pdf.
  • Walker JL , Mitchell B , Wismer S . 2000. Impacts during project anticipation in Molas, Indonesia: implications for social impact assessment. Environ Impact Assess Rev. 20:513–535.10.1016/S0195-9255(99)00040-2
  • Wang P , Lassoie JP , Dong SK , Morreale SJ . 2013. A framework for social impact analysis of large dams: a case study of cascading dams on the Upper-Mekong River, China. J Environ Manage. 117:131–140.
  • Wei X , Xia EJ , Li QX . 2004. Comprehensive evaluation of risks in venture investment project decision–making. China Soft Sci. 2:153–157.
  • Wijnmalen DJD . 2007. Analysis of benefits, opportunities, costs, and risks (BOCR) with the AHP–ANP: a critical validation. Math Comput Model. 46:892–905.10.1016/j.mcm.2007.03.020
  • Xie GP . 2016. The construction of the ‘China-Pakistan Economic Corridor’ and its cross-border non-traditional security governance. Southeast Asian Affairs. 167(3):23–37.
  • Xu XB , Tan Y , Yang GS . 2013. Environmental impact assessments of the Three Gorges Project in China: issues and interventions. Earth Sci Rev. 124:115–125.10.1016/j.earscirev.2013.05.007
  • Yang Y . 2013. Reform of Pakistani Tribal Areas and Chinese Role. South Asian Stud Q. 3(3):56–64.
  • Zhang F , Li HM . 2005. Application of analytic hierarchy process in evaluation of venture capital project. Commercial Res. 24:11–13. DOI:10.13902/j.cnki.syyj.2005.24.004.
  • Zhang QF , Lou ZP . 2011. The environmental changes and mitigation actions in the Three Gorges Reservoir region, China. Environ Sci Policy. 14:1132–1138.10.1016/j.envsci.2011.07.008
  • Zhang RL , Andam F , Shi GQ . 2017. Environmental and social risk evaluation of overseas investment under the China-Pakistan economic corridor. Environ Monit Assess. 189:253. DOI:10.1007/s10661-017-5967-6.
  • Zhang TJ , Baker THW , Cheng GD , Wu QB . 2008. The Qinghai-Tibet railroad: a milestone project and its environmental impact. Cold Reg Sci Technol. 53:229–240.10.1016/j.coldregions.2008.06.003
  • Zhao Y , Wang YS . 2011. Progress of spatial analysis. Geogr Geo-Inf Sci. 27(5):1–8.
  • Zhou XJ , Yan DC . 2016. On land acquisition risks about intentional projects in the perspective of ‘One Belt and One Road’ – from the case of Karot Hydropower Station in Pakistan. J Xiangtan Univ (Philosophy and Social sciences). 40(4):53–59.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.