References
- Asad, M.and Topal, E. 2011. Production scheduling of open pit mining operations through cutoff grade optimization, (SAIMM) South African Institute of Mining and Metallurgy, 111, (1), 741–750.
- Dimitrakopoulos, R. and Jewbali, A. 2013. Joint stochastic optimisation of short and long term mine production planning: method and application in a large operating gold mine, Mining Technology, 122, (2), 110–123.10.1179/1743286313Y.0000000040
- Groeneveld, B. and Topal, E. 2011. Flexible open-pit mine design under uncertainty, Journal of Mining Science, 47, (2), 212–226.10.1134/S1062739147020080
- Johnson, T. B. 1968. Optimum open pit mine production scheduling. PhD Dissertation, Univ. of California, Berkeley, USA.
- Li, Y., Topal, E. and Williams, D. 2014. Optimisation of waste rock placement using mixed integer programming (MIP) technique, IMMM Transactions section A, Mining Technology, 123, 220–229.
- Li, Y., Topal, E. and Williams, D. 2013. Waste rock dumping optimisation using mixed integer programming (MIP). International Journal of Mining, Reclamation and Environment, 27, (6), 425–436.10.1080/17480930.2013.794513
- Little, J. and Topal, E. 2011. Strategies to assist in obtaining an optimal solution for an underground mine planning problem using Mixed Integer Programming, International Journal of Mining and Mineral Engineering, 3, (2), 152–172.10.1504/IJMME.2011.042429
- Ramazan, S. 2007. The new fundamental tree algorithm for production scheduling of open pit mines, European Journal of Operational Research, 177, (2), 1153–1166.10.1016/j.ejor.2005.12.035
- Ramazan, S. and Dimitrakopoulos, R. 2004. Recent applications of operations research and efficient MIP formulations in open pit mining, SME, Transmission, 316, 73–78
- Sommerville, K. and Heyes, J. 2009. Be open to closure – it can save you money, in Proceedings Iron Ore 2009, 317–322, Perth, Australia, The Australasian Institute of Mining and Metallurgy.
- Topal, E. 2008. Early start and late start algorithms to improve the solution time for long term underground mine scheduling, (SAIMM) South African Institute of Mining and Metallurgy, 108, 2, 99–107.
- Topal, E. and Ramazan, S. 2012. Strategic mine planning model using network flow model and real case application. International Journal of Mining, Reclamation and Environment, 26, (1), 29–37.10.1080/17480930.2011.600827
- Wang, L. Z. and Butler, G. J. 2007. XPAC destination scheduling for waste dumps at BHP Billiton, in Proceedings Iron Ore Conference 2007, August 20, 2007–August 22, 2007, 421–425, Perth, Australia, The Australasian Institute of Mining and Metallurgy.