References
- Aissani N, Beldjilali B, Trentesaux D. 2009. Dynamic scheduling of maintenance tasks in the petroleum industry: a reinforcement approach. Eng Appl Artif Intell. 22:1089–1103.
- Baluja S, Caruana R. 1995. Removing the genetics from the standard genetic algorithm. Machine Learning: Proceedings of the Twelfth International Conference, Lake Tahoe, California, USA. p. 38–46.
- Ben Ali M, Sassi M, Gossa M, Harrath Y. 2011. Simultaneous scheduling of production and maintenance tasks in the job shop. Int J Prod Res. 49:3891–3918.
- Burke EK, Gustafson S, Kendall G. 2004. Diversity in genetic programming: an analysis of measures and correlation with fitness. IEEE Trans Evol Comput. 8:47–62.
- Davis L. 1991. Handbook of genetic algorithms. New York (NY): Van Nostrand Reinhold.
- Deris S, Omatu S, Ohta H, Shaharudin Kutar Lt.Cdr, Abd Samat P. 1999. Ship maintenance scheduling by genetic algorithm and constraint-based reasoning. Eur J Oper Res. 112:489–502.
- Dhillon Balbir S. 2008. Mining equipment reliability, maintainability, and safety. Ottawa: Springer Science & Business Media.
- Diaz-Gomez P, Hougen D. 2007. Initial population for genetic algorithms: a metric approach. Proceedings of the 2007 International Conference on Genetic and Evolutionary Methods, Las Vegas, NV. p. 43–49.
- Gopalakrishnan M, Mohan S, He Z. 2001. A tabu search heuristic for preventive maintenance scheduling. Comput Ind Eng. 40:149–160.
- Gurobi Optimization, Inc. 2016. Gurobi optimizer reference manual. http://www.gurobi.com/
- Jin X, Li L, Ni J. 2009. Option model for joint production and preventive maintenance system. Int J Prod Econ. 119:347–353.
- Jiu S, Zhou Z, Liu J. 2013. The equipment maintenance scheduling problem in a coal production system. Int J Prod Res. 51:5309–5336.
- Leung Y, Gao Y, Xu ZB. 1997. Degree of population diversity -- a perspective on premature convergence in genetic algorithms and its Markov chain analysis. IEEE Trans Neural Networks. 8:1165–1176.
- Lewis MW, Steinberg L. 2001. Maintenance of mobile mine equipment in the information age. J Qual Maint Eng. 7:264–274.
- Mitchell M. 1998. An introduction to genetic algorithms. Cambridge (MA): MIT press.
- Najid NM, Alaoui-Selsouli M, Mohafid A. 2011. An integrated production and maintenance planning model with time windows and shortage cost. Int J Prod Res. 49:2265–2283.
- Pandey D, Kulkarni MS, Vrat P. 2011. A methodology for joint optimization for maintenance planning, process quality and production scheduling. Comput Ind Eng. 61:1098–1106.
- Singleton T, Krellis O. 1998. Mine maintenance -- the cost of operation. Coal Operators Conference, Wollongong, NSW, Australia. p. 81–90.
- Summit R, Halomoan D. 2015. Reliability modelling for maintenance scheduling of mobile mining equipment. ANZIAM J. 55:526–540.
- Tomlingson PD. 2007. Mine maintenance management reader. Littleton (CO): Society for Mining, Metallurgy, and Exploration.
- Topal E, Ramazan S. 2010. A new MIP model for mine equipment scheduling by minimizing maintenance cost. Eur J Oper Res. 207:1065–1071.