571
Views
7
CrossRef citations to date
0
Altmetric
Articles

An approach for identifying and selecting improvement projects

&

References

  • Akao, Y. (1990). Quality function deployment: Integrating customer requirements into product design. Cambridge, MA: Productivity Press.
  • Akao, Y. (1991). Hoshin Kanri: Policy development for successful TQM. Cambridge, MA: Productivity Press.
  • Banuelas, R., Antony, J., & Brace, M. (2005). An application of Six Sigma to reduce waste. Quality and Reliability Engineering International, 21(6), 553–570.
  • Bilgen, B., & Şen, M. (2012). Project selection through fuzzy analytic hierarchy process and a case study on Six Sigma implementation in an automotive industry. Production Planning & Control, 23(1), 2–25.
  • Boran, S., Yazgan, H. R., & Goztepe, K. (2011). A fuzzy ANP-based approach for prioritising projects: A Six Sigma case study. International Journal of Six Sigma and Competitive Advantage, 6(3), 133–155.
  • Breyfogle, F. W. (2003). Implementing Six Sigma: Smarter solutions using statistical methods (2nd ed.). New York, NY: John Wiley.
  • Breyfogle, F. W., Cupello, J. M., & Meadows, B. (2001). Managing Six Sigma: A practical guide to understanding, assessing, and implementing the strategy that yields bottom-line success. New York, NY: John Wiley.
  • Chuang, P. T. (2001). Combining the analytic hierarchy process and quality function deployment for a location decision from a requirement perspective. The International Journal of Advanced Manufacturing Technology, 18(11), 842–849.
  • DOD. (1980). IL-STD-1629A – Procedures for performing a failure mode, effects and criticality analysis. Washington, DC: United States Department of Defense.
  • Duffy, G. L. (2014). Modular Kaizen: Continuous and breakthrough improvement. Milwaukee, WI: ASQ Quality Press.
  • Gitlow, H., Oppenheim, A., & Oppenheim, R. (1995). Quality management: Tools and methods for improvement (2nd ed.). Burr Ridge, IL: Irwin.
  • Gryna, F. M. (2001). Quality planning and analysis: From product development through use. Boston, MA: McGraw-Hill.
  • Harry, M., & Schroeder, R. (2005). Six Sigma: The breakthrough management strategy revolutionizing the world’s top corporations. New York, NY: Random House LLC.
  • Hira, A., & Parfitt, T. W. (2004). Development projects for a new millennium. West Port, CT: Greenwood Publishing Group.
  • Jung, J. Y., & Lim, S.-G. (2007). Project categorization, prioritization, and execution based on Six Sigma concept: A case study of operational improvement project. Project Management Journal, 38(1), 55–60.
  • Juran, J. M., & Godfrey, A. B. (1999). Juran’s quality handbook. New York, NY: McGraw-Hill Professional.
  • Kelly, M. (2002). Three steps to project selection. Six Sigma Forum Magazine, 2(1), 29–33.
  • Kirkham, L., Garza-Reyes, J. A., Kumar, V., & Antony, J. (2014). Prioritisation of operations improvement projects in the European manufacturing industry. International Journal of Production Research, 52(18), 5323–5345.
  • Kornfeld, B., & Kara, S. (2013). Selection of Lean and Six Sigma projects in industry. International Journal of Lean Six Sigma, 4(1), 4–16.
  • Kubiak, T. M. (2012). The certified Six Sigma master black belt handbook. Milwaukee, WI: ASQ Quality Press.
  • Kumar, M., Antony, J., & Rae Cho, B. (2009). Project selection and its impact on the successful deployment of Six Sigma. Business Process Management Journal, 15(5), 669–686.
  • Marriott, B., Arturo Garza-Reyes, J., Soriano-Meier, H., & Antony, J. (2013). An integrated methodology to prioritise improvement initiatives in low volume-high integrity product manufacturing organisations. Journal of Manufacturing Technology Management, 24(2), 197–217.
  • Montgomery, D. C., & Woodall, W. H. (2008). An overview of Six Sigma. International Statistical Review, 76(3), 329–346. doi: 10.1111/j.1751-5823.2008.00061.x
  • Munro, R. A., Maio, M. J., Nawaz, M. B., Ramu, G., & Zrymiak, D. J. (2008). The certified Six Sigma green belt handbook. Milwaukee, WI: ASQ Quality Press.
  • Padhy, R. (2017). Six Sigma project selections: A critical review. International Journal of Lean Six Sigma, 8(2), 244–258. doi:10.1108/IJLSS-06-2016-0025. Retrieved from http://www.emeraldinsight.com/doi/abs/10.1108/IJLSS-06-2016-0025
  • Padhy, R. K., & Sahu, S. (2011). A real option based Six Sigma project evaluation and selection model. International Journal of Project Management, 29(8), 1091–1102.
  • Pande, P. S., Neumann, R. P., & Cavanagh, R. R. (2000). The Six Sigma way: How GE, Motorola, and other top companies are honing their performance. New York, NY: McGraw-Hill.
  • Pyzdek, T., & Keller, P. A. (2014). The Six Sigma handbook: A complete guide for green belts, black belts, and managers at all levels. New York, NY: McGraw-Hill Professional.
  • Ramu, G. (2007). Six Sigma project assignment: Know your black belts. Six Sigma Forum Magazine, 6(2), 26–30.
  • Ray, S., & Das, P. (2010). Six Sigma project selection methodology. International Journal of Lean Six Sigma, 1(4), 293–309.
  • Ray, S., Das, P., Bhattacharyay, B. K., & Antony, J. (2013). Measuring Six Sigma project effectiveness using fuzzy approach. Quality and Reliability Engineering International, 29(3), 417–430.
  • Rohleder, T. R., & Silver, E. A. (1997). A tutorial on business process improvement. Journal of Operations Management, 15(2), 139–154.
  • Saaty, T. L. (1990). How to make a decision: The analytic hierarchy process. European Journal of Operational Research, 48(1), 9–26.
  • Saghaei, A., & Didehkhani, H. (2011). Developing an integrated model for the evaluation and selection of six sigma projects based on ANFIS and fuzzy goal programming. Expert Systems with Applications, 38(1), 721–728.
  • Schon, D. A. (1983). The reflective practitioner: How professionals think in action. New York, NY: Basic Books.
  • Sharma, S., & Chetiya, A. R. (2010). Six Sigma project selection: An analysis of responsible factors. International Journal of Lean Six Sigma, 1(4), 280–292.
  • Snee, R. D. (2001). Dealing with the Achilles’ heel of Six Sigma initiatives. Quality Progress, 34(3), 66–72.
  • Stamatis, D. H. (2003). Failure mode and effect analysis: FMEA from theory to execution (2nd ed.). Milwaukee, WI: Quality Press.
  • Su, C.-T., & Chou, C.-J. (2008). A systematic methodology for the creation of Six Sigma projects: A case study of semiconductor foundry. Expert Systems with Applications, 34(4), 2693–2703.
  • Tague, N. R. (2005). The quality toolbox (2nd ed.). Milwaukee, WI: ASQ Quality Press.
  • Verzuh, E. (2003). The portable MBA in project management. Hoboken, NJ: John Wiley & Sons.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.