639
Views
6
CrossRef citations to date
0
Altmetric
Articles

Agility capabilities in wood procurement systems: a literature synthesis

, &
Pages 216-232 | Received 27 Nov 2012, Accepted 11 Sep 2013, Published online: 19 Nov 2013

References

  • Adebayo AB, Han HS, Johnson L. 2007. Productivity and cost of cut-to-length and whole-tree harvesting in a mixed-conifer stand. Forest Prod J. 57:59–69.
  • Agarwal A, Shankar R, Tiwari M. 2007. Modeling agility of supply chain. Ind Mark Manage. 36:443–457.
  • Andersson J, Eliasson L. 2004. Effects of three harvesting work methods on Harwarder productivity in final felling. Silva Fenn. 32:195–202.
  • Andreassen K, Øyen BH. 2002. Economic consequences of three silvicultural methods in uneven-aged mature coastal spruce forests of central Norway. Forestry. 75:483–488.
  • Asikainen A. 1998. Chipping terminal logistics. Scand J Forest Res. 13:386–392.
  • Asikainen A. 2004. Integration of work tasks and supply chains in wood harvesting – cost savings or complex solutions? Int J Forest Eng. 15:11–17.
  • Audy J-F, D’Amours S, Rönnqvist M. 2012a. An empirical study on coalition formation and cost/savings allocation. Int J Prod Econ. 136:13–27.
  • Audy J-F, Moreira M, Westlund K, D’Amours S, LeBel L, Rönnqvist M. 2012b. Alternative logisitics concepts fitting different wood supply situtations and markets. CIRRELT. 2012–2024.
  • Beaudoin D, Frayret J-M, LeBel L. 2008. Hierarchical forest management with anticipation: an application to tactical–operational planning integration. Can J Forest Res. 38:2198–2211.
  • Beaudoin D, Frayret J-M, LeBel L. 2010. Negotiation-based distributed wood procurement planning within a multi-firm environment. Forest Policy Econ. 12:79–93.
  • Bergström J, Walter F. 2000. GIS-based benefits analysis of new forest truck roads. Resultat-SkogForsk. 23:4.
  • Bettinger P, Siry J, Boston K, Grebner DL. 2008. Forest management and planning. Amsterdam, The Netherlands: Academic Press.
  • Björheden R, Helstad K. 2005. Raw material procurement in sawmills’ business level strategy – a contingency perspective. Int J Forest Eng. 16:47–56.
  • Blinn CR, Sinclair SA. 1986. Profitability of various timber harvesting systems as affected by product sorting and timber stand parameters. North J Appl Forestry. 3:167–172.
  • Bradley A. 2006. Hauling with full axle weights and reduced tire pressures on weight-restricted roads in British Columbia. Transport Res Rec J Transp Res Board. 1967:20–26.
  • Bredström D, Jönsson P, Rönnqvist M. 2010. Annual planning of harvesting resources in the forest industry. Int Trans Oper Res. 17:155–177.
  • Brinker RW, Jackson BD. 1991. Using a geographic information system to study a regional wood procurement problem. Forest Sci. 37:1614–1631.
  • Broad LR. 1989. Note on log sort yard location problems. Forest Sci. 35:640–645.
  • Brown C, Sessions J. 1999. Variable tire pressures for tropical forest? A synthesis of concepts and applications. J Trop Forest Sci. 11:380–400.
  • Carlgren C-G, Carlsson D, Rönnqvist M. 2006. Log sorting in forest harvest areas integrated with transportation planning using backhauling. Scand J Forest Res. 21:260–271.
  • Carlsson D, Rönnqvist M. 2007. Backhauling in forest transportation : models, methods, and practical usage. Can J Forest Res. 37:2612–2623.
  • Cass RD, Baker SA, Greene WD. 2009. Cost and productivity impacts of product sorting on conventional ground-based timber harvesting operations. Forest Prod J. 59:108–114.
  • Charles A, Lauras M, Wassenhove L Van. 2010. A model to define and assess the agility of supply chains: building on humanitarian experience. Int J Phys Distrib Logis Manage. 40:722–741.
  • Chauhan S, Frayret J-M, LeBel L. 2011. Supply network planning in the forest supply chain with bucking decisions anticipation. Ann Oper Res. 190:93–115.
  • Christopher M. 2000. The agile supply chain. Ind Mark Manage. 29:37–44.
  • Christopher M, Peck H. 2004. Building the resilient supply chain. Int J Logist Manage. 15:1–14.
  • Christopher M, Towill D. 2001. An integrated model for the design of agile supply chains. Int J Phys Distrib Logist Manage. 31:235–246.
  • Christopher M, Towill D. 2002. Developing market specific supply chain strategies. Int J Logist Manage. 13:1–14.
  • Clark KB, Fujimoto T. 1989. Lead time in automobile product development explaining the Japanese advantage. J Eng Technol Manage. 6:25–58.
  • Collin J, Lorenzin D. 2006. Plan for supply chain agility at Nokia: lessons from the mobile infrastructure industry. Int J Phys Distrib Logist Manage. 36:418–430.
  • Crespell P, Knowles C, Hansen E. 2006. Innovativeness in the North American softwood sawmilling industry. Forest Sci. 52:568–578.
  • Cubbage FW. 1983. Tract size and harvesting costs in Southern Pine. J Forestry. 81:430–478.
  • D’Amours S, Rönnqvist M, Weintraub A. 2008. Using operational research for supply chain planning in the forest products industry. INFOR: Inf Syst Oper Res. 46:265–281.
  • Davis LS, Johnson KN, Bettinger P, Howard TE. 2001. Forest management: to sustain ecological, economic, and social values. 4th ed. New York (NY): McGraw-Hill Companies Inc.
  • Davis C, Kellogg L. 2005. Measuring machine productivity with the MultiDat datalogger: a demonstration on three forest machines. USDA Forest Service. Gen. Tech.:10.
  • DeVor R, Graves R, Mills JJ. 1997. Agile manufacturing research: accomplishments and opportunities. IIE Trans. 29:813–823.
  • Devlin GJ, McDonnell K. 2009. Assessing real time GPS asset tracking for timber haulage. Open Transp J. 3:78–86.
  • Devlin GJ, McDonnell K, Ward S. 2008. Timber haulage routing in Ireland: an analysis using GIS and GPS. J Transp Geogr. 16:63–72.
  • Dyer JH. 1996. How Chrysler created an American keiretsu. Harv Bus Rev. 74:42–56.
  • Dykstra DP, Kuru G, Nussbaum R. 2003. Technologies for log tracking. Int Forestry Rev. 5:262–267.
  • Eliasson L, Bengtsson J, Cedergren J, Lageson H. 1999. Comparison of single-grip harvester productivity in clear- and shelterwood cutting. Int J Forest Eng. 10:43–48.
  • Epstein R, Nieto E, Weintraub A, Chevalier P, Gabarró J. 1999. A system for the design of short term harvesting strategy. Eur J Oper Res. 119:427–439.
  • Erdle TA, Arp PA, Meng CH. 1981. Optimizing pulpwood inventories at roadsides, millyards and concentration yards: a case study. Forestry Chron. 57:218–225.
  • Faisal MN, Banwet DK, Shankar R. 2007. Supply chain agility: analysing the enablers. Int J Agile Syst Manage. 2:76–91.
  • Frisk M, Göthe-Lundgren M, Jörnsten K, Rönnqvist M. 2010. Cost allocation in collaborative forest transportation. Eur J Oper Res. 205:448–458.
  • Galbraith JE, Meng CH. 1981. Simulating optimum inventory of harvested wood. J Forestry. 79:292–295.
  • Gerasimov Y, Sokolov A. 2008. GIS-based decision-support program for planning and analyzing short-wood transport in Russia. Croat J Forest Eng. 29:163–175.
  • Goldman SL, Nagel RN, Preiss K. 1995. Agile competitors and virtual organizations. New York (NY): Van Nostrand Reinhold.
  • Goychuk D, Kilgore MA, Blinn CR, Coggins J, Kolka RK. 2011. The effect of timber harvesting guidelines on felling and skidding productivity in Northern Minnesota. Forest Sci. 57:393–407.
  • Grebner DL, Grace LA, Stuart W, Gilliland DP. 2005. A practical framework for evaluating hauling costs. Int J Forest Eng. 16:115–128.
  • Greene WD, Harris TG, DeForest CE, Wang J. 1997. Harvesting cost implications of changes in the size of timber sales in Georgia. South J Appl Forestry. 21:193–198.
  • Gunasekaran A. 1998. Agile manufacturing: enablers and an implementation framework. Int J Prod Res. 36:1223–1247.
  • Gunasekaran A. 2001. Agile manufacturing: the 21st century competitive strategy. Oxford (UK): Elsevier.
  • Gunn E. 2009. Some perspectives on strategic forest management models and the forest products supply chain. INFOR: Inf Syst Oper Res. 47:261–272.
  • Gunnarsson H, Rönnqvist M, Carlsson D. 2007. Integrated production and distribution planning for Södra cell AB. J Math Model Algorithms. 6:25–45.
  • Hahn CK, Watts CA, Kim KY. 1990. The supplier development program: a conceptual model. J Purch Mater Manage. 26:2–7.
  • Hajek J, Billing J, Swan D. 2008. Transportation of raw forest products in northern ontario by trucks. In: Jacob B, Nordengen P, O’Connor A, Bouteldja M, editors. International conference on heavy vehicles. London: Hoboken; p. 377–386.
  • Hamsley AK, Greene WD, Baker SA. 2009. Comparison of value harvested by modified and conventional tree-length systems in the southeastern United States. Forest Prod J. 59:1–6.
  • Han H-S, Ted Bilek EM, Dramm (Rusty) J, Loeffler D, Calkin D. 2011. Financial feasibility of a log sort yard handling small-diameter logs: a preliminary study. West J Appl Forestry. 26:174–182.
  • Hanewinkel M, Pretzsch H. 2000. Modelling the conversion from even-aged to uneven-aged stands of Norway spruce (Picea abies L. Karst.) with a distance-dependent growth simulator. Forest Ecol Manage. 134:55–70.
  • Harrison A, Christopher M, van Hoek RI. 1999. Creating the agile supply chain. School of Management Cranfield University, Cranfield. 1–60.
  • Hartsough BR, McNeel JF, Durston TA, Stokes BJ. 1997. Comparison of mechanized systems for thinning ponderosa pine and mixed conifer stands. Forest Prod J. 47:59–68.
  • Helstad K. 2006. Managing timber procurement in Nordic purchasing sawmills [doctoral thesis]. Växjö University, Sweden.
  • Van Hoek RI, Harrison A, Christopher M. 2001. Measuring agile capabilities in the supply chain. Int J Oper Prod Manage. 21:126–148.
  • Hof JG, Field RC. 1987. On the possibility of using joint cost allocation in forest management decision making. Forest Sci. 33:1035–1046.
  • Howard AF, Temesgen H. 1997. Potential financial returns from alternative silvicultural prescriptions in second-growth stands of coastal British Columbia. Can J Forest Res. 27:1483–1495.
  • Hubbard TN. 2000. The demand for monitoring technologies: the case of trucking. Q J Econ. 115:533–560.
  • Jirousek R, Klvac R, Skoupy A. 2007. Productivity and costs of the mechanised cut-to-length wood harvesting system in clear-felling operations. J Forest Sci – UZPI. 53:476–482.
  • Kanzian C, Holzleitner F, Stampfer K, Ashton S. 2009. Regional energy wood logistics : optimizing local fuel supply. Silva Fenn. 43:113–128.
  • Kärhä K. 2006. Whole-tree harvesting in young stands in Finland. Forestry Stud/Metsanduslikud Uurimused. 45:118–134.
  • Karlsson J, Ronnqvist M, Bergstrom J. 2003. Short-term harvest planning including scheduling of harvest crews. Int Trans Oper Res. 10:413–431.
  • Karlsson J, Rönnqvist M, Bergström J. 2004. An optimization model for annual harvest planning. Can J Forest Res. 34:1747–1754.
  • Kasarda JD, Rondinelli DA. 1998. Innovative infrastructure for agile manufacturers. Sloan Manage Rev. 39:73–82.
  • Katayama H, Bennett D. 1999. Agility, adaptability and leanness: a comparison of concepts and a study of practice. Int J Prod Econ. 60–61:43–51.
  • Kellogg LD, Bettinger P. 1994. Thinning productivity and cost for a mechanized cut-to-length system in the Northwest Pacific coast region of the USA. Int J Forest Eng. 5:43–52.
  • Kestler MA, Berg RL, Miller HJ, Steinert BC, Eaton R, Larson G, Haddock J. 2011. Keeping springtime low-volume road damage to a minimum. transportation research record. J Trans Res Board. 2205:155–164.
  • Kidd PT. 1995. Agile manufacturing: forging new frontiers. Boston (MA): Addison-Wesley Longman Publishing.
  • Kivinen V-P, Uusitalo J. 2002. Applying fuzzy logic to tree bucking control. Forest Sci. 48:673–684.
  • Kluender RA, Stokes BJ. 1994. Productivity and costs of three harvesting methods. South J Appl Forestry. 18:168–174.
  • Kruczynski LR, Jasumback A. 1993. Forestry management applications: forest service experiences with GPS. J Forestry. 91:20–24.
  • Kuuluvainen J, Karppinen H, Ovaskainen V. 1996. Landowner objectives and nonindustrial private timber supply. Forest Sci. 42:300–309.
  • Laiho O, Lähde E, Pukkala T. 2011. Uneven- vs even-aged management in Finnish boreal forests. Forestry. 84:547–556.
  • LeBel L, Carruth JS. 1997. Simulation of woodyard inventory variations using a stochastic model. Forest Prod J. 47:52–57.
  • Lee HL. 2004. The triple-a supply chain. Harv Bus Rev. 82:102–112.
  • Li X, Chung C, Goldsby TJ, Holsapple CW. 2008. A unified model of supply chain agility: the work-design perspective. Int J Logist Manage. 19:408–435.
  • Lin C-T, Chiu H, Chu P-Y. 2006. Agility index in the supply chain. Int J Prod Econ. 100:285–299.
  • Liu C, Ruel J-C, Zhang SY. 2007. Immediate impacts of partial cutting strategies on stand characteristics and value. Forest Ecol Manage. 250:148–155.
  • Lussier J-M. 2009. Changing our mental model from growing volume to producing value: the case of uneven-aged hardwood management. Forestry Chron. 85:382–386.
  • Macdonald G. 1995. The case for boreal mixedwood management: an ontario perspective. Forestry Chron. 71:725–734.
  • Malinen J, Palander T. 2004. Metrics for distribution similarity applied to the bucking to demand procedure. Int J Forest Eng. 15:33–40.
  • Maltamo M, Packalén P, Yu X, Eerikäinen K, Hyyppä J, Pitkänen J. 2005. Identifying and quantifying structural characteristics of heterogeneous boreal forests using laser scanner data. Forest Ecol Manage. 216:41–50.
  • Marshall HD, Murphy GE, Boston K. 2006. Evaluation of the economic impacts of length and diameter measurement error on mechanical harvesters and processors operating in pine stands. Can J Forest Res. 36:1661–1673.
  • Masson R, Iosif L, MacKerron G, Fernie J. 2007. Managing complexity in agile global fashion industry supply chains. Int J Logist Manage. 18:238–254.
  • McCullen P, Saw R, Christopher M, Towill D. 2006. The F1 supply chain: adapting the car to the circuit – the supply chain to the market. Supply Chain Forum: An Int J. 7:14–23.
  • McDonald TP, Fulton JP. 2005. Automated time study of skidders using global positioning system data. Comput Electron Agric. 48:19–37.
  • Mentzer JT, Foggin JH, Golicic SG. 2000. Supply chain collaboration: enablers, impediments, and benefits. Supply Chain Manage Rev. 4:52–58.
  • Mondragon AEC, Lyons AC, Kehoe DF. 2004. Assessing the value of information systems in supporting agility in high-tech manufacturing enterprises. Int J Oper Prod Manage. 24:1219–1246.
  • Moore TY, Ruel J-C, Lapointe M-A, Lussier J-M. 2012. Evaluating the profitability of selection cuts in irregular boreal forests: an approach based on Monte Carlo simulations. Forestry. 85:63–77.
  • Murphy G. 2003. Reducing trucks on the road through optimal route scheduling and shared log transport services. Southern J Appl Forestry. 27:198–205.
  • Murphy G, Franich R. 2004. Early experience with aroma tagging and electronic nose technology for log tracking. Forest Prod J. 54:28–35.
  • Murphy G, Marshall H, Bolding MC. 2004. Adaptive control of bucking on harvesters to meet order book constraints. Forest Prod J. 54:114–121.
  • Nagel RN, Dove R. 1991. 21st century manufacturing enterprise strategy: An industry-led view. DIANE Publishing.
  • Narasimhan R, Das A. 1999. An empirical investigation of the contribution of strategic sourcing to manufacturing flexibilities and performance. Decis Sci. 30:683–718.
  • Nurminen T, Heinonen J. 2007. Characteristics and time consumption of timber trucking in Finland. Silva Fenn. 41:471–487.
  • Palander T, Väätäinen J. 2005. Impacts of interenterprise collaboration and backhauling on wood procurement in Finland. Scand J Forest Res. 20:177–183.
  • Palander T, Väätäinen J, Laukkanen S, Malinen J. 2004. Modeling backhauling on Finnish energy-wood network using minimizing of empty routes. Int J Forest Eng. 15:79–85.
  • Porter ME. 1998. Competitive strategy: techniques for analyzing industries and competitors : with a new introduction. New York (NY): Simon and Schuster.
  • Power DJ, Sohal AS, Rahman S-U. 2001. Critical success factors in agile supply chain management – An empirical study. Int J Phys Distrib Logist Manage. 31:247–265.
  • Prater E, Biehl M, Smith MA. 2001. International supply chain agility – tradeoffs between flexibility and uncertainty. Int J Oper Prod Manage. 21:823–839.
  • Pukkala T, Lähde E, Laiho O. 2010. Optimizing the structure and management of uneven-sized stands of Finland. Forestry. 83:129–142.
  • Pulkki R. 2003. Minimizing negative environmental impacts of forest harvesting operations. In: Burton PJ, Messier C, Smith DW, Adamowicz WL, editors. Towards sustainable management of the boreal forest. Ottawa: National Research Council of Canada; pp. 581–628.
  • Rauch P, Gronalt M. 2011. The effects of rising energy costs and transportation mode mix on forest fuel procurement costs. Biomass Bioenergy. 35:690–699.
  • Rönnqvist M. 2003. Optimization in forestry. Math Program. 97:267–284.
  • Sambamurthy V, Bharadwaj A, Grover V. 2003. Shaping agility through digital options: reconceptualizing the role of IT in contemporary firms. MIS Quarter. 27:237–264.
  • Sanchez R, Heene A, Thomas H. 1996. Dynamics of competence-based competition : theory and practice in the new strategic management. Oxford (UK): Pergamon.
  • SCC. 2010. Supply chain operations reference (SCOR) model overview, version 10.0:23.
  • Schneeweiss C, Zimmer K. 2004. Hierarchical coordination mechanisms within the supply chain. Eur J Oper Res. 153:687–703.
  • Sessions J, Akay A, Murphy G, Chung W, Aruga K. 2006. Road and harvesting planning and operations. In: Shao G, Reynolds K, editors. Computer applications in sustainable forest management: including perspectives on collaboration and integration. Dordrecht: Springer; pp. 83–89.
  • Sessions J, Boston K, Hill R, Stewart R. 2005. Log sorting location decisions under uncertainty. Forest Prod J. 55:53–57.
  • Sessions J, Paredes G. 1987. A solution procedure for the sort yard location problem in forest operations. Forest Sci. 33:750–762.
  • Shao G, Reynolds K. 2006. digitial forestry. In: Shao G, Reynolds K, editors. Computer applications in sustainable forest management: including perspectives on collaboration and integration. Dordrecht: Springer; pp. 3–16.
  • Shapiro JF. 2001. Modeling the supply chain. Pacific Grove (CA): Cengage Learning.
  • Sharifi H, Zhang Z. 1999. A methodology for achieving agility in manufacturing organisations: an introduction. Int J Prod Econ. 62:7–22.
  • Sibal PV, Bowyer JL, Bradley DP. 1984. Log merchandising in Aspen. J Forestry. 82:420–425.
  • Simmons FC. 1947. Mechanizing forest operations. J Forestry. 45:345–349.
  • Smith DM, Larson BC, Kelty MJ, Ashton PMS. 1997. The practice of silviculture: applied forest ecology. New York (NY): Wiley.
  • Stier JC, Steele TW, Engelhard RJ. 1986. Pulpwood procurement practices in the Wisconsin-Upper Michigan pulp and paper industry. North J Appl Forestry. 3:10–14.
  • Stokes BJ. 1992. Harvesting small trees and forest residues. Biomass Bioenergy. 2:131–147.
  • Stratton R, Warburton RD. 2003. The strategic integration of agile and lean supply. Int J Prod Econ. 85:183–198.
  • Sunderman R, Warburton R. 2003. Establishment of the creston log sort yard: case study. BC J Ecosyst Manage. 31:1–6.
  • Swafford PM, Ghosh S, Murthy N. 2006. The antecedents of supply chain agility of a firm: scale development and model testing. J Oper Manage. 24:170–188.
  • Talbot B, Nordfjell T, Suadicani K. 2003. Assessing the utility of two integrated harvester-forwarder machine concepts through stand-level simulation. Int J Forest Eng. 14:31–43.
  • Tittler R, Messier C, Burton PJ. 2011. Hierarchical forest management planning and sustainable forest management in the boreal forest. Forestry Chron. 77:998–1005.
  • Todd KM, Rice RW. 2005. Factors affecting pulpwood inventory levels in the northeastern United States. Forest Prod J. 55:17–21.
  • Tokarczyk J, Hansen E. 2006. Creating intangible competitive advantages in the forest products industry. Forest Prod J. 56:4–13.
  • Troncoso J, D’Amours S, Flisberg P, Rönnqvist M, Weintraub A. 2011. A mixed integer programming model to evaluate integrating strategies in the forest value chain – a case study in the Chilean forest industry. CIRRELT. 28:1–29.
  • Uusitalo J. 2005. A framework for CTL method-based wood procurement logistics. Int J Forest Eng. 16:37–46.
  • Uusitalo J, Kokko S, Kivinen V-P. 2004. The effect of two bucking methods on Scots pine lumber quality. Silva Fenn. 38:291–303.
  • Vahid S, Maness T. 2010. Modelling customer demand in forest products industry supply chains: a review of the literature. Int J Simulat Proc Model. 6:103–114.
  • Visser RJM, McDonagh KD, Meller RD, McDonald TP. 2004. Harvesting system simulation using a systems dynamic model. South J Appl Forestry. 28:91–99.
  • Visser RJM, Stampfer K. 2003. Tree-length system evaluation of second thinning in a loblolly pine plantation. South J Appl Forestry. 27:77–82.
  • Weintraub A, Epstein R, Morales R, Seron J, Traverso P. 1996. A truck scheduling system improves efficiency in the forest industries. Interfaces. 26:1–12.
  • Weller D, Denham R, Witte C, Mackie C, Smith D. 2003. Assessment and monitoring of foliage projected cover and canopy height across native vegetation in Queensland, Australia, using laser profiler data. Can J Rem Sens. 29:578–591.
  • Wikström P. 2000. A solution method for uneven-aged management applied to Norway Spruce. Forest Sci. 46:452–463.
  • Yaoxiang L, Jingxin W, Miller G, McNeel J. 2006. Production economics of harvesting small-diameter hardwood stands in central Appalachia. Forest Prod J. 56:81–86.
  • Yusuf Y, Sarhadi M, Gunasekaran A. 1999. Agile manufacturing. Int J Prod Econ. 62:33–43.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.