References
- Egyptian Electricity Authority Statistics, Annual Report, (1995/96), EEA, Abbascyah, Cairo, Egypt.
- Touileb, R., 1997, Les Interconnextions Maghrebines du Simple Secours a L'integration des Reseaux, CIGRE Regional Meeting for African Continent, Cairo, Egypt, Report 1-106.
- Taher, F., 1997, Prospects of the Evolution of a Unified Interconnected Power System in Africa, IEEE Power Engineering Review, pp. 6-9.
- Awad , M. M. 1998 . The Egyptian Experience for Electric and Magnetic Fields and Radio Noise with Compact and Traditional Towers , Paris Session : CIGRE .
- Abd-Allah, M. A., Anis, K, and Mahmoud SH, 1993, Comparative Study of Magnetic Fields Near EHV and Distribution Power Lines, IEEE Power Engineering Society, North American Power Symposium, Howard Univ., Washington, D.C., October 11-12.
- Anis, H, et al, 1997, Measurements of ELF Magnetic Field Levels in Egypt. CIGRE Regional Meeting for the African Continent, Cairo, Egypt, Report IV-102.
- Redhead, C. S., and Dodge, C. H, 1992, Health Effects of Power Line Electromagnetic Fields, Congressional Research Series, The Library of Congress.
- Electric Power Transmission and the Environment, 1993, CIGRE, Report No. 74, Paris, France.
- Belzile, C., and Cohen, C., 1997, The Conservation of Threatened or Vulnerable Plant Species: The Dee Cantons-1-6vis Transmission Line Experience, Proceedings Sixth International Symposium on Environmental Concerns in Rights-of-Way Management, New Orleans, LA, Elsevier Science, Ltd., pp. 367-373.
- Hydro-Quebec, 1994, Le Processus de Participation Publique a Hydro-Quebec, Direction Communications et Relations Publiques, p. 66.
- Hammons , T. J. 1993 . Advanced Power Technologies-Tidal Power . Proceedings IEEE , 80 ( 3 ) : 419 – 433 .
- Nelson River HVDC Transmission Lines External Electrical Effects--Final Report, Manitoba HVDC Research Centre, Report E.4.55.2, June 1995.
- HVDC Power Transmission Environmental Issues Review, Oak Ridge National Laboratory, Report ORNL/Sub/95-SR893/2, April 1997.
- Environmental Assessment Sourcebook, Volumes 1, 2, & 3, World Bank Technical Paper Number 139, November 1994.
- Bruntland, G. H (Chair), 1987, Our Common Future: The World Commission on Environment and Development, Oxford University Press, New York, p. 44.
- CEA, 1997, Hydroelectricity: Water Powers on Earth, Canadian Electrical Association, Montreal, QC, p. 4.
- Doucet, G. J., Seguin, C., and Giguere, M., (Eds), 1995, Proceedings Fifth International Symposium on Environmental Concerns in Rights-of-Way Management, VicePresidence Environment, Hydro-Quebec, Montreal, QC, September 19-22, p. 558.
- Williams, J. R., and Goodrich-Mahoney, J. W., (Eds), 1997, Proceedings Sixth International Symposium on Environmental Concerns in Rights-of-Way Management, Intergy Sevices, Inc. and Electric Power Research Institute, New Orleans, LA, February 24-26, Elsevier Science Ltd., p. 551.
- Smallidge, P. J., Leopold, D. J., and Alien, C. M., 1995, Management Concerns for the Response of Blue Lupine Communities on Rights-of-Way in East-Central New York, USA, to Environmental Factors and Vegetation Management, Proceedings Fifth International Symposium on Environmental Concerns in Rights-of-Way Management, Hydro-Quebec, Montreal, QC, September 19-22, pp. 330-335.
- Deshaye, J., Brunelle, J., and Morneau, F., 1996, Etude de la Biodiversite des Emprises de Lignes de Transport d'Energie Electrique en Foret Mixte, Foramec Inc. & Hydro-Quebec, p. 80.
- Wester, E. E., and KoIb, J. W., 1997, Conservation of the Gopher Tortoise and Associated Species during Construction of the Florida Gas Transmission Company Phase III Expansion Project, Proceedings Sixth International Symposium on Environmental Concerns in Rights-of-Way Management, Intergy Services, Inc. and Electric Power Research Institute, February 24-26, New Orleans, LA, Elsevier Science., Ltd., p. 333-340.