4
Views
7
CrossRef citations to date
0
Altmetric
Original Articles

Cyclic Assembly Schedules for Dynamic Demands

Pages 643-652 | Received 01 Aug 1993, Accepted 01 Feb 1995, Published online: 13 Sep 2016

References

  • Afentakis, P. (1987) A parallel heuristic algorithm for lot-sizing in multistage production systems. IIE Transactions, 19(3), 34–42 #.
  • Afentakis, P., Gavish, B. and Karmarkar, U. (1984) Computationally efficient optimal solutions to the lot-sizing problem in multistage assembly systems. Management Science, 30(2), 222–239.
  • Bahl, H. C. and Ritzman, L. P. (1984) A cyclical scheduling heuristic for lot sizing with capacity constraints. International Journal of Production Research, 22(5), 791–800.
  • Campbell, G. M. and Mabert, V. A. (1991) Cyclical schedules for capacitated lot sizing with dynamic demands. Management Science, 37(4), 409–427.
  • Coleman, B. J. and McKnew, M. A. (1991) An improved heuristic for multilevel lot sizing in material requirements planning. Decision Sciences, 22(1), 136–156.
  • Dobson, G. (1992) The cyclic lot scheduling problem with sequence-dependent setups. Operations Research, 40(4), 736–749.
  • Gallego, G. and Moon, I. (1992) The effect of externalizing setups in the economic lot scheduling problem. Operations Research, 40, 614–619.
  • Gallego, G. and Roundy, R. (1992) The economic lot scheduling problem with finite backorder costs. Naval Research Logistics, 39, 729–739.
  • Gallego, G. and Shaw, D. (1990) Complexity and heuristics for some economic lot scheduling problems. Technical Report. Department of IE/OR, Columbia University.
  • Gelders, L. F. and VanWassenhove, L. N. (1981) Production planning: a review. European Journal of Operational Research, 7(2), 101–110.
  • Hall, R.W. (1988) Cyclic scheduling for improvement. International Journal of Production Research, 6(3), 457–72.
  • Jackson, P.L., Maxwell, W.L. and Muckstadt, J.A. (1988) Determining optimal reorder intervals in capacitated production-distribution systems. Management Science, 34(8), 938–958.
  • Maxwell, W. L. and Muckstadt, J. A. (1985) Establishing consistent and realistic reorder intervals in production-distribution systems. Operations Research, 33, 1316–1341.
  • McClain, J. O. and Trigeiro, W. W. (1985) Cyclic assembly schedules. IIE Transactions, 17(4), 346–353.
  • McKnew, M.A., Saydam, C. and Coleman, B.J. (1991) An efficient zero-one formulation of the multilevel lot-sizing problem. Decision Sciences, 280–295.
  • Roundy, R. (1989) Rounding off to powers of two in continuous relaxations of capacitated lot scheduling problems. Management Science, 35(12), 1433–1442.
  • Roundy, R. (1993) Efficient, effective lot sizing for multistage production systems. Operations Research, 41(2), 371–385.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.