77
Views
11
CrossRef citations to date
0
Altmetric
Original Articles

‘Just-In-Time’ Production of Large Assemblies

, , &
Pages 653-667 | Received 01 Aug 1994, Accepted 01 Feb 1995, Published online: 13 Sep 2016

References

  • Adams, J., Balas, E. and Zawack, D. (1988) The shifting bottleneck procedure for job shop scheduling. Management Science, 34(3), 391–401.
  • Agrawal, A., Harhalakis, G., Minis, I. and Nagi, R. (1994) Just-In-Time production of large assemblies. Technical Report No. TR 94–51, Institute for Systems Research, University of Maryland, College Park, MD.
  • Ashour, S. (1967) A decomposition approach for the machine scheduling problem. International Journal of Production Research, 6, 109–122.
  • Ashour, S. and Hiremath, S.R. (1973) A branch and bound approach to the job shop scheduling problem. International Journal of Production Research, 11, 47–58.
  • Barker, J. R. and McMahon, G. B. (1985) Scheduling the general job shop. Management Science, 31, 594–598.
  • Bedworth, D. D. and Bailey, J. E. (1982) Integrated Production Control Systems, Wiley, New York.
  • Billington, P.J., McClain, J.O. and Thomas, L.J. (1983) Mathematical programming approaches to capacity-constrained MRP systems: review, formulation and problem reduction. Management Science, 29(10), 1126–1141.
  • Boctor, F.F. (1990) Some efficient multi-heuristic procedures for resource-constrained project scheduling. European Journal of Operational Research, 49, 3–9.
  • Carlier, J. and Pinson, E. (1989) An algorithm for solving the job shop problem. Management Science, 35(2), 164–176.
  • Coffman, E.G., Jr., (1976) Computer and Job-Shop Scheduling Theory, John Wiley, New York.
  • Elsayed, E.A. (1982) Algorithms for project scheduling with resource constraints. International Journal of Production Research, 20, 95–103.
  • Elsayed, E. A. and Nasr, N. Z. (1986) Heuristics for resource-constrained scheduling. International Journal of Production Research, 24, 299–310.
  • Godin, V. and Jones, C. (1969) The interactive shop supervisor. Industrial Engineering, 1, 16–22.
  • Goldratt, E. (1980) Optimized production timetable: a revolutionary program for industry, in APICS 23rd Annual Conference Proceedings Oct 14–17, Los Angeles, CA, 172–176.
  • Greenberg, H.H. (1968) A branch and bound solution to the general scheduling problem. Operations Research, 16, 353–361.
  • Hu, T.C. (1961) Parallel sequencing and assembly line problems. Operations Research, 9(6), 841–848.
  • Khattab, M.M. and Choobineh, F. (1991) A new approach for project scheduling with a limited resource. International Journal of Production Research, 29(1), 185–198.
  • Lageweg, B.J., Lenstra, J.K. and Rinnooy Kan, A.H.G. (1977) Job shop scheduling by implicit enumeration. Management Science, 24, 441–450.
  • Levulis, R.J. (1985) Finite capacity scheduling and simulation systems. Manufacturing Technology Information Analysis Center, Chicago, Illinois, Rep. MTIAC TA-85-04 (October).
  • MacCarthy, B.L. and Liu, J. (1993) Addressing the gap in scheduling research: a review of optimization and heuristic methods in production scheduling. International Journal of Production Research, 31(1), 59–79.
  • Miltenburg, J. and Sinnamon, G. (1989) Scheduling mixed-model multilevel just-in-time production systems. International Journal of Production Research, 27(9), 1487–1509.
  • Miltenburg, J. and Sinnamon, G. (1992) Algorithms for scheduling multilevel just-in-time production systems. IIE Transactions, 24(2), 121–130.
  • Orlicky, J. (1975) Material Requirements Planning, McGraw Hill, New York.
  • Panwalkar, S.S. and Iskander, W. (1977) A survey of scheduling rules. Operations Research, 25(1), 45–61.
  • Reiter, S. (1966) A system for managing job shop production. J. Business, 39(3), 371–393.
  • Rodammer, F.A. and White, K.P., Jr (1988) A recent survey of production scheduling. IEEE Transactions on Systems, Man, and Cybernetics, 18(6), 841–851.
  • Ulusoy, G. and Ozdamar, L. (1989) Heuristic performance and network/resource characteristics in resource-constrained project scheduling. Journal of the Operational Research Society, 40(12), 1149–1152.
  • Zahorik, A., Thomas, L.J. and Trigeiro, W.W. (1984) Network programming models for production scheduling in multi-stage, multi-item capacitated systems. Management Science, 30(3), 308–325.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.