1,414
Views
19
CrossRef citations to date
0
Altmetric
Original Articles

Coordination Challenges of Production Planning in the Construction of International Mega-Projects in The Middle East

, PE, PEng, PMP ORCID Icon & , PhD, PEng ORCID Icon

References

  • Abdelhamid, T. (2004). The self-destruction and renewal of lean construction theory: A prediction from Boyd’s theory. Proceedings of the 12th Annual Conference of the IGLC, Helsingør, Denmark.
  • Abdelhamid, T., El-Gafy, M., & Salem, O. (2008). Lean construction fundamentals and principles. American Professional Construction Journal, 32, 8–19.
  • Al Sarraj, Z. (1990). Formal development of line‐of‐balance technique. Journal of Construction Engineering Management, 116(4), 689–704.
  • AlSehaimi, A., Koskela, L., & Tzortzopoulos, P. (2013). Need for alternative research approaches in construction management: Case of delay studies. Journal of Management in Engineering, 148, 407–413.
  • Applebaum, H. (1982). Construction management: Traditional versus bureaucratic methods. Anthropological Quarterly 55 (4). The George Washington University Institute for Ethnographic Research: 224–234. doi:10.2307/3317151.
  • Ballard, G., & Howell, G. (1994). Implementing lean construction - Improving downstream performance. Proceedings of the 2nd Annual Conference on Lean Construction, Santiago, Chile, 101–110.
  • Ballard, G. & Howell, G. (1998). Shielding production: Essential step in production control. Journal of Construction Engineering, 124(1), 11–17.
  • Ballard, G. & Tommelein, I. (2016). Current Process Benchmark for the Last Planner® System. Lean Construction Journal, 57–89.
  • Campion, M., Puresell, E., & Brown, B. (1988), Structured interviewing: Raising the psychometric properties of the employment interview. Personnel Psychology, 41. 25–42.
  • COAA. (2007). Workface planning model and implementation guide. Construction Owners Association of Alberta, Edmonton, Alberta http://coaa.ab.ca/construction/AWPWFP/ImplementationGuide.aspx
  • Davies, A., Gann, D., & Douglas, T. (2009). Innovation in megaprojects: Systems integration at London Heathrow Terminal. 5. California Management Review 51(2), 101–125.
  • Dettman, K., Fauchler, D., Bayer, R., Wojtasinski, S., & M. J. Landry. (2010). In mega projects: Challenges and recommended practices.” In P. Levin, ed. Construction contract claims, changes, and disputeresolution, Reston VA: American Council of Engineering. Pp. 469–481.
  • Do, D., Ballard, G., & Tillmann, P. (2015). The application of target value design in the design and construction of the UHS Temecula Valley Hospital. Part 1 of 5. Berkeley, CA: UC Berkeley.
  • Eastman, C. & Sacks, R. (2008). Relative productivity in the AEC industries in the United States for on-site and off-site activities. Journal of Construction Engineering Management, 134(7), 517–526.
  • Flyvbjerg, B. (2007). Megaproject policy and planning: Problems, causes, cures. Summary of dissertation for higher doctorate in science. Aalborg, Denmark: Aalborg University.
  • Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6–19. doi:0.1002/pmj.21409.
  • Frandson, A., Berghede, K., & Tommelein, I. (2013). Takt time planning for construction of exterior cladding. Proceedings of the 21st Annual Conference of the IGLC, Fortaleza, Brazil, 527–536.
  • Frandson, A.G., Seppänen, O., & Tommelein, I. (2015). Comparison between LBM and Takt time planning. Proceedings of the 23rd Annual Conference of the IGLC, Perth, Australia, 3–12.
  • Goldratt, E. (1997). Critical chain, Great Barrington, MNA: The North River Press Publishing Corporation.
  • Halpin, D., & Riggs, L. (1992). Planning and analysis of construction operations, New York: John Wiley & Sons.
  • Howell, G., Ballard, G., & Tommelein, I. (2011). Construction engineering-reinvigorating the discipline. Journal of Construction Engineering Management, 276, 740–744.
  • Jergeas, G. & Lynch, R. (2014). Future pathway for industrial mega-project delivery, Calgary, Alberta, Canada: GO Productivity.
  • Junnonen, J. & Seppanen, O. (2004). Task planning as a part of production control. Proceedings of the 12th Annual Conference of the IGLC, Helsingør, Denmark.
  • Kelley, J., & Walker, M. (1959). Critical-path planning and scheduling. Proceedings of the Eastern Joint Computer Conference, Boston, MA, 160–173.
  • Kenley, R., and Seppänen, O. (2010). Location-based management system for construction improving productivity using Flowline, New York: Spon Press.
  • Koskela, L. (2000). An exploration towards a production theory and its application to construction. PhD thesis, Helsinki University of Technology–VTT Technical Research Centre.
  • Koskela, L., Howell, G., Ballard, G., & Tommelein, I. (2002). The foundations of lean construction. In Design and Construction: Building in Value, R. Best and G. De Valence, eds., pp. 211–226. Oxford, UK: Butterworth-Heinemann, Elsevier.
  • Koskela, L., Howell, G., Pikas, E., & Dave, B. (2014). If CPM is so bad, why have we been using it so long. Proc., 22nd Annual Conference of the IGLC, Oslo, Norway, 27–37.
  • Lichtig, W. (2005). Sutter health: Developing a contracting model to support lean project delivery. Lean Construction Journal, 2(1), 105–112.
  • McTague, R. & Jergeas, G. (2002). Productivity improvements on Alberta major construction projects: Phase I-back to basics. Calgary, Alberta Economic Development.
  • Ohno, T. (1988). Toyota production system: Beyond large-scale production, New York: Productivity Press.
  • Peer, S. (1974). Network analysis and construction planning. Journal of the Construction Division, 100(3), 203–210.
  • Rankin, L., Slootman, T., & Jergeas, G. (2008). The industry’s perspective on workforce planning for major projects. AACE International Transactions, PM.12.1–12.
  • Rizzo, A. (2014). Rapid urban development and national master planning in Arab Gulf countries. Cities, 39, 50–57.
  • Ryan, G. (2009). Schedule for sale: Workface planning for construction projects. Bloomington, IN: AuthorHouse.
  • Scharfenort, N. (2012). Urban development and social change in Qatar: The Qatar national vision 2030 and the 2022 FIFA World Cup. Journal of Arabian Studies, 2(2), 209–230.
  • Seppänen, O. & Aalto, E. (2005). A case study of line-of-balance based schedule planning and control system. Proceedngs of the 13th Annual Conference of the IGLC, Sydney, Australia, 271–279.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.