530
Views
7
CrossRef citations to date
0
Altmetric
Case Report

Evaluation of Supply Chain Management Lapses in Nigeria’s Construction Industry

, &

References

  • AbTalib, M. S. & Hamid, A.B. (2014). Application of Critical Success Factors in Supply Chain Management. International Journal of Supply Chain Management, 3(1), 2051–3771. IJSCM, ISSN: 2050–7399 (Online)
  • .Adamu, I., & Howell, G. (2012, July). Applying last planner in the Nigerian construction industry. 20th annual conference of the international group for lean construction. San Diego, California, USA: Montezuma Publishing.
  • Ahiakwo, O., Suresh, S., Oloko, D., & Khatih, J. (2012, July). Client perspective for the implementation of lean construction in the Nigerian construction industry. Proceedings of the 4th West Africa Built Environment Research (WABER) conference (pp. 133–146). Abuja, Nigeria.
  • Akintoye, A., McIntosh, G., & Fitzgerald, E. (2000). A survey of supply chain collaboration and management in the UK construction industry. European Journal of Purchasing & Supply Management, 6(3), 159–168. https://doi.org/https://doi.org/10.1016/S0969-7012(00)00012-5
  • Alarcon, L. F., & Serpell, A. (1996). Performance measuring benchmarking and modelling of construction projects.Chile: Department of Construction Engineering and Management. School of Engineering Santiago [Online], [cited 18 September 2010]. Available from Internet: http://www.fepup.pt/disciplinas/PGI914/Ref_topico1/Performance_benchmarking.pdf
  • Ala-Risku, T., & Karkkainen. M. (2006). Material delivery problems in construction projects: A possible solution. International Journal of Production Economics, 104(1), 19–29.
  • Alinaitwe, H. M. (2009). Prioritising lean construction barriers in Uganda’s construction industry. Journal of Construction in Developing Countries, 14(1), 15–30. http://web.usm.my/jcdc/vol14_1_2009/2_Henry%20%20(p.15-30).pdf
  • Altarum, T., & Boeing, H. (2003). Developing lean supply chains a guide book. The Boeing Company. http://www.newvectors.net/publications/pdfs/esd_LeanSupplyChainGuideBook.pdf
  • Anandhi, K., & Perumal, R. (2013). Job satisfaction in Logistics sector: A review and research agenda. International Journal of Marketing and Technology, 3(5), ISSN: 2249–1058.
  • Aniki, A. O., Mbohwa, C., & Akinlabi, E. T. (2014, July). Improvement of logistics and supply chain management in the cement industry in Nigeria. Proceedings of the world congress on engineering WCE, London, UK.
  • Aouad, G., Ozorhon, B., & Abbott, C. (2010). Facilitating innovation in construction: Directions and implications for research and policy. Construction Innovation: Information, Process, Management, 10(No. 4), pp. 374–94. https://doi.org/https://doi.org/10.1108/14714171011083551
  • Arbulu, R., & Ballard, G. (2004). Lean supply system in construction. 12th proceedings of the international group for lean construction, Elsinore, Denmark.
  • Aslam, M., Gao, Z., & Smith, G. (2020). Exploring factors for implementing lean construction for rapid initial successes in construction. Journal of Cleaner Production, 277, 1–14. https://doi.org/https://doi.org/10.1016/j.jclepro.2020.123295
  • Ballard, G., & Howell, G. (1998). What kind of production is construction? [ Paper presentation]. IGLC-6, Guaruja, Brazil.
  • Barratt, M. & Oliveira, A. (2001). “Exploring the experiences of collaborative planning initiatives”. International Journal of Physical Distribution & Logistics Management, 31(4), 266–289. https://doi.org/https://doi.org/10.1108/09600030110394932
  • Battula, R. V., Namburu, S. K., & Kone, V. (2020). A study on factors involved in implementation of supply chain management in construction industry. Materials Today: Proceedings. https://doi.org/https://doi.org/10.1016/j.matpr.2020.04.900 
  • Beil, D. R. (2009). Operations research and management science: Supplier selection. Wiley Encyclopaedia.
  • BR, R. K., Agarwal, A. & Sharma, M. K. (2016). “Lean management – a step towards sustainable green supply chain”. Competitiveness Review,26(3), 311–331. https://doi.org/https://doi.org/10.1108/CR-05-2015-0040
  • Dallasega, P., Rauch, E., & Linder, C. (2018). Industry 4.0 as an enabler of proximity for construction supply chains: A systematic literature review. Computers in Industry, 99, 205–225. https://doi.org/https://doi.org/10.1016/j.compind.2018.03.039
  • Daria Z., Glenn B., & Christine P. (2012). Target value design: using collaboration and a lean approach to reduce construction cost.Construction Management and Economics, 30(5), 383–398.
  • Dave, B., Boddy, S., & Koskela, L. (2010). Improving Information Flow within the Production Management System with Web Services. In: IGLC 18 : 18th Annual Conference of the International Group for Lean Construction, 14­16th July 2010, Haifa, Isreal. (Unpublished).
  • Denscombe, M. (2010). The good research guide for small-scale social research projects (3rd ed.). McGraw Hill.
  • Ekeskär, A. (2016). Exploring Third-Party Logistics and Partnering in Construction: A Supply Chain Management Perspective. (Unpublished Post-graduate thesis), Linköping University, Norrkoping, Sweden.
  • Emuze, F., & Smallwood, J. 2013. Lean supply chain decisions implications for construction in a developing economy [ Paper presentation]. 21th annual conference of the international group for lean construction, Fortaleza, Brazil.
  • Fliedner, G. (2008). Sustainability: A new lean principle. In: Proceedings of the 39th Annual Meeting of the Decision Sciences Institute, Baltimore, Maryland, pp. 3321–3326.
  • Formoso, C. T, Isatto, L. E., & Hirota, H. E. (1999). Method for Waste Control in the Building Industry. Proceedings IGLC-7. University of California, Berkeley, CA, USA.
  • Forsman, S., Björngrim, N., Bystedt, A., Laitila, L., Bomark, P., & Öhman, M. (2012). Need for innovation in supplying engineer-to-order joinery products to construction: A case study in Sweden. Construction Innovation, 12(4), 464–491. https://doi.org/https://doi.org/10.1108/14714171211272225
  • Forsman, S., Bystedt, A., & Ohman, M. (2011). Interaction in the construction process – System effects for a joinery products supplier. Lean Construction Journal, 1–18. https://www.diva-portal.org/smash/get/diva2:985793/FULLTEXT01.pdf
  • Frödell, M. (2014). Organisation of purchasing and buyer-supplier relationships in large construction companies [Unpublished PhD thesis]. Chalmers University of Technology.
  • Garland, R. (1991). The mid-point on a rating scale: Is it desirable? Marketing Bulletin,2, 66–70.
  • Gonzalez, D., Firte, F., & Dimitrov, I. (2016). Successful application of Last planner system combined with location based management system:divergence between theory and practice. (Unpublished Master’s thesis), Aalborg university, Denmark.
  • Green, S., & May, S. (2005). Lean construction: Arenas of enactment, models of diffusion, and the meaning of “leanness”. Building Research & Information, 33(6), 498–511. https://doi.org/https://doi.org/10.1080/09613210500285106
  • Hair, J., Anderson, R. E., Tathan, R. L., & Black, W. C. (1998). Multivariate data analysis. Prentice Hall.
  • Hallman, M. (2013). Implementing last planner on construction sites: Foremen and superintendents’ experiences of a lean implementation [Unpublished Bachelor’s thesis]. Chalmers University of Technology.
  • Hannus, M., Kazi, A. S. & Zarli, A. (2010). ICT Supported Energy Efficiency in Construction. Strategic Research Roadmap and Implementation Recommendations, Brussels, Espoo, Sophia-Antipolis: REEBconsortium. isbn: 978–951–38–7432–2
  • Hosseini, M. S., Azizi, S., & Sheikhi, N. (2012). An Investigation on the Effect of Supply Chain Integration on Competitive Capability: An Empirical Analysis of Iranian Food Industry. International Journal of Business and Management, 7(5).
  • Hsu, P. Y., Aurisicchio, M., & Angeloudis, P. (2019). Risk-averse supply chain for modular construction projects. Automation in Construction, 106, 1–12. https://doi.org/https://doi.org/10.1016/j.autcon.2019.102898
  • Isatto, E. L., & Formoso, C. T. (2011). Three theoretical perspectives for understanding inter-firm coordination of construction project supply chains. Australasian Journal of Construction Economics and Building, 11(3), 1–17. https://doi.org/https://doi.org/10.5130/AJCEB.v11i3.2198
  • Jiang, R., Wu, C., Mao, C., & Shrestha, A. (2016). Ecosystem visualization and analysis of Chinese fabricated housing industry. Process Engineering, 145, 436–443. https://doi.org/https://doi.org/10.1016/j.proeng.2016.04.011
  • Jorgensen, B & Emmitt, S. (2008). LOST IN TRANSITION – THE TRANSFER OF LEAN MANUFACTURING TO CONSTRUCTION. Loughborough University Institutional Repository.
  • Kissi, E., Boateng, E. B., Adjei-Kumi, T., & Badu, E. (2016). Principal component analysis of challenges facing the implementation of value engineering in public projects in developing countries. International Journal of Construction Management, 17(2), 142-150. https://doi.org/https://doi.org/10.1080/15623599.2016.1233088.
  • Koskela, L. (1999, July). Management of production in construction: A theoretical view. Proceedings of the seventh annual conference of the international group for lean construction IGLC-7, Berkeley, CA.
  • Koskela, L. (2000). An exploration towards a production theory and its application to construction [Unpublished thesis]. VTT Technical Research Centre of Finland, Espoo.
  • Lamming, R. (1996). Squaring lean supply with supply chain management. International Journal of Operations & Production Management,16(2), 183–196.
  • McCurry, L. & McIvor, R. T. (2001), “Agile manufacturing: 21st century strategy for manufacturing on the periphery?”. Conference Proceedings,Irish Academy of Management Conference, University of Ulster, September.
  • Moneke, U. U., & Echeme, I. I. (2016). Assessment of SCM in the Nigerian construction industry for effective project delivery in Imo state, Nigeria. Int’l Journal of Development & Management Review, 11(1), 233–249.
  • Mossman, A. (2009). why isn’t the UK construction industry going lean with gusto? Lean Construction Journal, 2009, 24–36. https://www.researchgate.net/profile/Alan_Mossman/publication/228885226_Why_isn't_the_UK_construction_industry_going_lean_with_gusto/links/5612a12e08aeed6ac8842d70/Why-isnt-the-UK-construction-industry-going-lean-with-gusto.pdf
  • Nicholas, J., & Soni, A. (2006). The portal to lean production: principles and practices for doing more with less. Auerbach Publications.
  • Nourbakhsh, M., Mohamad Zin, R., Irizarry, J., Zolfagharian, S. & Gheisari, M. (2012). Mobile application prototype for on‐site information management in construction industry. Engineering, Construction and Architectural Management, 19(5), 474–494. https://doi.org/https://doi.org/10.1108/09699981211259577
  • Ochieng, E.G ., & Price, A. D. F. (2010). Managing cross-cultural communication in multicultural construction project teams: The case of Kenya and UK. International Journal of Project Management, 28, 449–460.
  • Oehmen, J., Oppenheim, B. W., Secor, D., Norman, E., Rebentisch, E., & Sopko, J. A. M. (2012). The guide to lean enablers for managing engineering programs. Joint MIT‐PMI‐INCOSE Community of Practice on Lean in Program Management.
  • Ofori, G. (2000). Greening the construction supply chain in Singapore. European Journal of Purchasing and Supply Management, 6(3–4), 195–206. Special Issue. https://doi.org/https://doi.org/10.1016/S0969-7012(00)00015-0
  • Ogunbiyi, O. (2014). Implementation of the lean approach in sustainable construction: A conceptual framework [Unpublished doctorate thesis]. University of Central Lancashire.
  • Ojo, E., Mbowa, C., & Akinlabi, E. T. (2014). Green supply chain management in construction industries in South Africa and Nigeria. International Journal of Chemical, Environmental and Biological Sciences (IJCEBS), 2(2), 2320–4087. https://ujcontent.uj.ac.za/vital/access/services/Download/uj:5192/CONTENT1?view=true
  • Okafor., C. C., & Ezeoyili., M. N. (2020). Assessment of infrastructure maintenance practices of three airports in Southern Nigeria. Nigerian Journal of Technology, 39(3), 744–751. https://doi.org/https://doi.org/10.4314/njt.v39i3.13
  • Olayiwola, M. K. A. (2008). The level of awareness and use of ICT in supply chain management in the Nigerian construction industry, procurement of construction and reconstruction projects in the international context [Unpublished thesis].
  • Omoregie, A., & Radford, D. (2005). Infrastructure delay and cost escalations: Causes and effects in Nigeria. Proceedings of the 6th int’l postgraduate research conference in the built and human environment. Int’l council for research and innovation in building and construction,  Delft University of Technology, 3-4 April.
  • Oppenheim, B. W. (2011). Lean for systems engineering with lean enablers for systems engineering. Wiley.
  • Ozkan-Ozen, D. Y., Kazancoglu, Y., & Mangla, S. K. (2020). Sychronized barriers for circular supply chains in industry 3.5/industry 4.0 transition for sustainable resources management. Resources, Conservation & Recycling, 161, 1–11. https://doi.org/https://doi.org/10.1016/j.resconrec.2020.104986
  • Pallant, J. (2005). SPSS survival manual: A step by step guide to data analysis using SPSS for windows (Version 12). Open University Press.
  • Patton, M. Q. (1990). Qualitative evaluation and research methods (2nd ed.). Sage.
  • Pinho, T., Telhada, J., & Carvalho, S. M. (2007). Definition of a supply chain management model in construction- Case study [ Paper presentation]. IGLC-15, Michigan, USA.
  • Ren, J. (2012). Lean construction and supply chain: A literature review [Unpublished master’s thesis]. Royal Institution of Technology Stockholm.
  • Rother, M. (2010). Toyota Kata: Management people for improvement, adaptativeness, and superior results. New York: McGraw Hill.
  • Sacks, R., Koskela, L., Dave, B. A., & Owen, R. (2010). “Interaction of lean and building information modeling in construction.Journal of Construction Engineering Management,136(9), 968–980.
  • Saka, N., & Mudi, A. (2007, September). Practices and challenges of supply chain management by building contracting firms in the Lagos metropolitan area. Proceedings of the 23rd annual ARCOM conference, Belfast, UK: Association of Researchers in Construction Management.
  • Sapuay, S. E. (2016). Construction waste - potential and constraints. Process Environmental Science, 35, 714–722. https://doi.org/https://doi.org/10.1016/j.proenv.2016.07.074
  • Schenck, J. (1998). CPFR: Stitching together the partnership. Apparel Industry Magazine, 59(8), 72–76.
  • Silveira, S. S. & Alves, C. L. (2018). Target Value Design Inspired Practices to Deliver Sustainable Buildings. Buildings, 8, 116. https://doi.org/https://doi.org/10.3390/buildings8090116
  • Silvius, G., Kampinga, M., Paniagua, S., & Mooi, H. (2017). Considering sustainability in project management decision making, an investigation using Q-methodology. International Journal of Production Management, 35(6), 1133–50.
  • Singh, S., & Kumar, K. (2020). Review of literature of lean construction and lean tools using systematic literature review technique (2008–2018). Ain Shams Engineering Journal, 11(2), 465–471. https://doi.org/https://doi.org/10.1016/j.asej.2019.08.012
  • So, S. & Sun, H. (2010). “Supplier integration strategy for lean manufacturing adoption in electronic‐enabled supply chains”. Supply Chain Management, 15(6), 474–487. https://doi.org/https://doi.org/10.1108/13598541011080455
  • Somiah, M. K., Aigbavboa, C., & Thwala, W. D. (2020). Rethinking the attributes for competitive advantage of indigenous construction firms in developing countries: A Ghana study. International Journal of Construction Education and Research, 2–16. https://doi.org/https://doi.org/10.1080/15578771.2020.1739179
  • Souza, D. V. S. D., & Koskela, L. 2014. Interfaces, flows and problems of construction supply chains— A case study in Brazil [ Paper presentation]. 22nd annual conference of the international group for lean construction, Oslo, Norway.
  • Tezel, A., Koskela, L., & Aziz, Z. (2018). ean thinking in the highways construction sector: Motivation, implementation and barriers. Production Planning & Control, 29(3), 247–269. https://doi.org/https://doi.org/10.1080/09537287.2017.1412522
  • Thomas, H. R., Riley, D. R., & Messner, J. I. (2005). Fundamental principles of site material management. Construction Engineering and Management, 131(7), 808–815. https://doi.org/https://doi.org/10.1061/(ASCE)0733-9364(2005)131:7(808)
  • Tommelein, I. D. (1998). Pull- driven scheduling for pipe-spool installation: Simulation of a lean construction technique. Journal of Construction Engineering and Management, 124(4), 279–288. https://doi.org/https://doi.org/10.1061/(ASCE)0733-9364(1998)124:4(279)
  • Tumpa, J. T., Ali, M. S., Rahman, H. M., Paul, K. S., Chowdhury, P., & Khan, S. A. R. (2019). Barriers to green supply chain management: An emerging economy context. Journal of Cleaner Production, 236, 1–12. https://doi.org/https://doi.org/10.1016/j.jclepro.2019.117617
  • Ugwu, O. O., & Attah, I. C. (2016). An appraisal of construction management practice in Nigeria. Nigeria Journal of Technology, 35(4), 754–760. https://doi.org/https://doi.org/10.4314/njt.v35i4.9
  • Vidalakis, C., & Sommerville, J. (2013). Transportation responsiveness and efficiency within the building supply chain. Building Research and Information, 41(4), 469–481. https://doi.org/https://doi.org/10.1080/09613218.2012.715824
  • Vrijhoef, R., Koskela, L. J., & Howell, G. (2001). Understanding construction supply chains: An alternative interpretation. http://usir.salford.ac.uk/9422
  • Vrijhoef, R., & Koskela, L. (2005, July 18–21). Revisiting the three peculiarities of production in construction [ Paper presentation]. Thirteenth annual conference of the international group for lean construction (IGLC-13), Sydney, Australia.
  • Wee, H., & Wu, S. (2009). Lean supply chain and its effect on product cost and quality: A case study on Ford Motor Company. Supply Chain Management: An International Journal, 14(5), 335–341. https://doi.org/https://doi.org/10.1108/13598540910980242
  • Wincel, J. P. (2004). Lean supply chain management. Productivity Press.
  • Yin, K. R. (1994). Case study research: design methods, applied social research methods series (Vol. 5). Sage Publications.
  • Zhang, X., Zhang, H., & Mao, J. (2008). “The coordination of several sections in the tourism service supply chain.” Urban Studies, 15(5), 138–143.
  • Zimmer, E. (2006). Improving lean supply chain management in the construction industry [Unpublished thesis]. Department of Civil and Environment Engineering College of Engineering, University of Cincinnati.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.