References
- Audit office of PRC (2008). “Audit result on management and operation of toll roads in 18 provinces/cities.” http://www.gov.cn/zwgk/2008–02/27/content_902834.htm
- Cheng, H. (2005). Construction Contract Management. Beijing: China Construction Industry Press, 2005
- Cui, S.H. (2004). “Fuzhou Municipal Government incurring 900 million Dispute.” China weekly Economy, (30), 24~25
- FIDIC (1999), “Conditions of Contract for Construction (The New Red Book).” Beijing: China Machine Press, 2002
- Kerf M., Gray R. D., Irwin T., Levesque C. and Taylor R. R. (1998). Concessions for infrastructure A guide to their design and award. World Bank Technical paper no. 399
- Lee J. and Zhao G.B.(2006). “People’s Republic of China: Toll Roads Corporatization Strategy –Towards Better Governance.” Technical Assistance Consultant’s Report, Asia Development Bank
- Lodestar (2004). “The first and second stage project of Houshi power plant has been completed.” http://www.lodestar.com.cn/dl/news/90679.html
- Shen, J.Y., Wang, S. Q., Qiang, M.S. (2005). “The political and sovereign risks of BOT/PPP projects in China: Case Study.” Chinese Businessperson .investment and financing, Jan., 1~7
- Wang, L.L.(2006). “What a thorny rose – interview with the famous BOT expert Professor Wang SQ.” Construction Enterprise Management, Jun. (214), 2~4
- Wang, Y.D. (2004). “The trap of BOT Projects & New Tides of BOT.” http://www.tb-lawyer.com/Article_Show.asp?ArticleID=1486&ArticlePage=1
- Wang, S. Q. (2003). “BOT: an approach of project financing.” Project Management Technology, Dec. (6), 2~4
- Wang, W. (2002). “The Chinese BOT model encountering the Waterloo.” http://business.sohu.com/79/07/article200620779.shtml
- World Bank. (2008). 2007 Global data. http://ppi.worldbank.org/index.aspx
- World Bank. (2006). “China’s Expressways: Connecting People and Markets.” Washington, D.C. (Draft report).
- World Bank. (1997). “Dealing with Public risk in private infrastructure.” Washington, D.C.
- Yu, Y.H. (2005). “The pricing model of BOT projects based on risks partaking.” The thesis of master degree of Da Lian Science and Technology University
- Zou, X.W.P., Wang, S.Q. & Fang, D.P. (2008). “A Life-cycle risk Management framework for PPP Infrastructure Projects.” Journal of Financial Management of Property and Construction, 2(13), 123 – 142