Critical Analysis of the Key Factors Affecting Construction Labour Productivity –An Indian Perspective

&
Pages 103-125 | Published online: 09 Sep 2014

References

  • Alinaitwe, H. M., Mwakali, J. A. and Hansson, B. (2007). “Factors affecting the productivity of building craftsmen – Studies of Uganda.” Journal of Civil Engineering and Management, 13(3), 169–176.
  • Borcherding, J. D. and Garner, D. F. (1981). “Work force motivation and productivity on large jobs.” Journal of the Construction Division, 107(3), 443–453.
  • Chan, J. H. L., Chan, D. W. M., Chan, A. P. C. and Lam, P. T. I. (2012). “Risk mitigation strategies for guaranteed maximum price and target cost contracts in construction – A factor analysis approach.” Journal of Facilities Management, 10(1), 6–25.
  • Chan, P. W. and Kaka, A. (2007). “Productivity improvements: understand the workforce perceptions of productivity first.” Personnel Review, 36(4), 564 – 584.
  • Choi, T. N. Y., Chan, D. W. M. and Chan, A. P. C. (2011). “Perceived benefits of applying pay for safety scheme (PFSS) in construction – A factor analysis approach.” Safety Science, 49(6), 813–823.
  • Dai, J. and Goodrum, P. M., Maloney, W. F. and Srinivasan, C. (2009). “Latent structures of the factors affecting construction labour productivity.” Journal of Construction Engineering and Management, 135(5), 397–406.
  • Dai, J., Goodrum, P. M. and Maloney, W. F. (2007).“Analysis of craft workersʼ and foremen’s perceptions of the factors affecting construction labour productivity.” Construction Management and Economics, 25(11), 1139 – 1152.
  • Doloi, H. (2008). “Application of AHP in improving construction productivity from a management perspective.” Construction Management and Economics, 26(8), 841–854.
  • Doloi, H., Sawhney, A., Iyer, K. C. and Rentala, S. (2012). “Analysing factors affecting delays in Indian construction projects.” International Journal of Project Management, 30(4), 479–489.
  • Enshassi, A., Mohamed, S., Mustafa, Z. A. and Mayer, P. E. (2007). “Factors affecting labour productivity in building projects in the Gaza strip.” Journal of Civil Engineering and Management, 13(4), 245–254.
  • Field, A. (2005).Discovering statistics using SPSS, 2nd Ed. Sage Publications, London.
  • Hair, J. F., Black, W. C., Babin, B. J., Anderson, R. E. and Tatham, R. L. (2011). Multivariate data analysis, 6th Ed. Dorling Kindersley (India) Pvt. Ltd, New Delhi.
  • Hanna, A. S., Russell, J. S., Gotzion, T. W. and Nordheim, E. V. (1999).“Impact of change orders on labour efficiency for mechanical construction.” Journal of Construction Engineering and Management, 125(3), 176–184.
  • Hewage, K. N. and Ruwanpura, J. Y. (2006). “Carpentry workers issues and efficiencies related to construction productivity in commercial construction projects in Alberta.” Canadian Journal of Civil Engineering, 33, 1075 – 1089.
  • Hinze, J. (1978). “Turnover, new workers and safety.” Journal of the Construction Division, 104(4), 409–417.
  • Jarkas, A. M. and Bitar, C. G. (2012). “Factors affecting construction labour productivity in Kuwait.” Journal of Construction Engineering and Management, 138(7), 811–820.
  • Kadir, M. R. A., Lee, W. P., Jaafar, M. S., Sapuan, S. M., Ali, A. A. A. (2005). “Factors affecting construction labour productivity for Malaysian residential projects.” Structural Survey, 23(1), 42–54.
  • Kaming, P. F., Holt, G. D., Kometa, S. T. and Olomolaiye, P. O. (1998a). “Severity diagnosis of productivity problems-a reliability analysis.” International Journal of Project Management, 16(2), 107–113.
  • Kaming, P. F., Olomolaiye, P. O., Holt, G. D. and Harris, F. C. (1997). “Factors influencing craftsmen’s productivity in Indonesia.” International Journal of Project Management, 15(1), 21–30.
  • Kaming, P. F., Olomolaiye, P. O., Holt, G. D. and Harris, F. C. (1998b). “What motivates construction craftsmen in developing countries? A case study of Indonesia.” Building and Environment, 33(2–3), 131–141.
  • Kazaz, A. and Ulubeyli, S. (2007). “Drivers of productivity among construction workers: A study in a developing country.” Building and Environment, 42(5), 2132–2140.
  • Lim, E. C. and Alum, J. (1995). “Construction productivity: issues encountered by contractors in Singapore.” International Journal of Project Management, 13(1):51–58.
  • Makulsawatudom, A., Emsley, M. and Sinthawanarong, K. (2004). “Critical factors influencing construction productivity in Thailand.” The Journal of KMITNB, 14(3), 1–6.
  • Malhotra, N. K. and Dash, S. (2011). Marketing Research: An applied orientation, 6th Ed. Dorling Kindersley (India) Pvt. Ltd, New Delhi.
  • McTague, B. and Jergeas, G. (2002). Productivity improvements on Alberta major construction projects, Alberta Economic Development, Alberta.
  • Mojahed, S. and Aghazadeh, F. (2008). “Major factors influencing productivity of water and wastewater treatment plant construction: Evidence from the deep south USA.” International Journal of Project Management, 26(2), 195–202.
  • Olomolaiye, P. O. (1988). “An evaluation of bricklayers’ motivation and productivity.” Ph. D. dissertation, Loughborough University of Technology, U. K.
  • Park, H., Thomas, R. S. and Tucker, R. L. (2005). “Benchmarking of construction productivity.” Journal of Construction Engineering and Management, 131(7), 772–778.
  • Parkin, A. B., Tutesigensi, A. and Buyukalp, A. I. (2009). “Motivation among construction workers in Turkey.” Dainty A. R. J. (Ed.). Proceedings of 25th Annual ARCOM Conference, Nottingham, U. K., 7–9 September 2009, 105–114.
  • Rivas, A. R., Borcherding, J. D., Gonzalez, V. and Alarcon, L. F. (2011). “Analysis of factors influencing productivity using craftsmen questionnaires: Case study in a Chilean construction company.” Journal of Construction Engineering and Management, 137(4), 312–320.
  • Rojas, E. M. and Aramvareekul, P. (2003). “Labour productivity drivers and opportunities in the construction industry.” Journal of Management in Engineering, 19(2), 78–82.
  • Thomas, H. R. and Napolitan, C. L. (1995). “Quantitative effects of construction changes on labour productivity.” Journal of Construction Engineering and Management, 121(3), 290–296.
  • Thomas, H. R. and Raynar, K. A. (1997).“Scheduled overtime and labour productivity: quantitative analysis.” Journal of Construction Engineering and Management, 123(2), 181–188.
  • Tucker, R. L. (1986). “Management of construction productivity.” Journal of Management in Engineering, 2(3), 148–156.
  • Zakeri, M., Olomolaiye P., Holt, G. D. and Harris, F C. (1997). “Factors affecting the motivation of Iranian construction operatives.” Building and Environment, 32(2), 161–166.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.