1,017
Views
10
CrossRef citations to date
0
Altmetric
Original Articles

Use of GIS to consider spatial aspects in construction planning process

Pages 207-222 | Received 28 Jun 2016, Accepted 17 Apr 2018, Published online: 24 Sep 2018

References

  • Adams TM. 1994. GIS-based subsurface data management. Microcomput Civil Eng. 9:305–313.
  • Anumba C, Dainty A, Ison S, Sergeant A. 2008. The utilisation of GIS in the construction labour market planning process. [Accessed 2012 May 15]. http://www.rics.org/NR/rdonlyres/B6AD4EB6-C418-4363-9DED-0997553D31C5/0/utilisation_of_gis.pdf.
  • Aouald G, Lee A, Wu S. 2007. Construction the future: nD modelling. London: Taylor and Francis.
  • ArcGIS version 9 Introduction part I & II. 2004. Environmental Systems and Research Institute. Redlands, CA: N. Y. Street.
  • Bansal VK. 2011a. Use of GIS and topology in the identification and resolution of space conflicts. J Comput Civil Eng. 25:159–171.
  • Bansal VK. 2011b. Application of geographic information systems in construction safety planning. Int J Project Manag. 29:66–77.
  • Bansal VK, Pal M. 2011. Construction projects scheduling using GIS tools. Int J Construct Manag. 11:1–18.
  • Bansal VK, Pal M. 2008. Generating, evaluating, and visualizing construction schedule with Geographic Information Systems. J Comput Civil Eng. 22:233–242.
  • Bansal VK, Pal M. 2007. Potential of geographic information systems in building cost estimation and visualisation. Automat Construct. 16:311–322.
  • Bansal VK. 2016. Potential application areas of GIS in pre-construction planning. J Profes Issues Eng Educ Practice 142:06015002-1-7.
  • Borrmann A, Rank E. 2009. Topological analysis of 3D building models using a spatial query language. Adv Eng Inform. 23:370–385.
  • Borrmann A, Schraufstetter S, Rank E. 2009. Implementing metric operators of a spatial query language for 3D building models: Octree and B-rep approaches. J Comput Civil Eng. 23:34–46.
  • Bouchlaghem D, Shang H, Whyte J, Ganah A. 2005. Visualization in architecture, engineering and construction (AEC). Automat Construct. 14:287–295.
  • Castronovo F, Lee S, Nikolic D, Messner JI. 2014. Visualization in 4D construction management software: a review of standards and guidelines. In: Issa RI, Flood I, editors. ASCE International Conference on Computing in Civil and Building Engineering. p. 315?322. ISBN: 9780784413616.
  • Chantawit D, Hadikusumo BHW, Charoenngam C. 2005. 4DCAD-Safety: visualizing project scheduling and safety planning. Construct Innov. 5:99–114.
  • Chau KW, Anson, M, Zhang JP. 2003. Implementation of visualization as planning and scheduling tool in construction. Build Environ. 38:713–719.
  • Cheng MY, O’Connor JT. 1996. ArcSite: enhanced GIS for construction site layout. J Construct Eng Manag. 122:329–336.
  • Cheng MY, Yang CY. 2001. GIS-Based cost estimate integrated with material layout planning. J Construct Eng Manag. 127:291–299.
  • Dawood N, Sriprasert E, Mallasi, Z, Hobbs, B. 2002. Development of an integrated information resource base for 4D/VR construction processes simulation. Automat Construct. 12:123–131.
  • ESRI. (2007). ArcGIS solutions for civil engineering. [Accessed 2010 Dec 6]. http://www.esri.com/library/brochures/pdfs/arcgis-civil-engineering.pdf.
  • Gallaher MP, O’Connor AC, Dettbarn Jr., JL, Gilday LT. 2004. Cost analysis of inadequate interoperability in the U.S. capital facilities industry. NIST Publ GCR 04–867. http://www.bfrl.nist.gov/oae/publications/gcrs/04867.pdf (2010 Feb 2).
  • Gidado K. 2004. Enhancing the prime contractor's pre-construction planning. J Constr Res. 5:87–106.
  • Gunes AE, Kovel JP. 2000. Using GIS in emergency management operations. J Urban Plan Dev. 126:136–149.
  • Halpin DW, Riggs LS. 1992. Planning and analysis of construction operations. New York: Wiley.
  • Hardin B, McCool D. 2015. BIM and construction management: Proven Tools, Methods, and Workflows, 2nd Edn. SYBEX, A Wiley Brand, John Wiley and Sons, NJ.
  • Heesom D, Mahdjoubi L. 2004. Trends of 4D CAD applications for construction planning. Construct Manag Econ. 22:171–182.
  • Isikdag U, Underwood J, Aouad G. 2008. An investigation into the applicability of building information models in geospatial environment in support of site selection and fire response management process. Adv Eng Inform. 22:504–519.
  • Issa RRA, Flood I, O’Brien WJ. 2003. Closure. 4D CAD and visualization in construction: developments and applications. Tokyo: A.A. Balkema Publishers.
  • Kamat VR, Martinez JC. 2001. Visualizing simulated construction operations in 3D. J Comput Civil Eng. 15:329–337.
  • Kamat VR. 2008. Logical product models for automated scripting of process-level construction animations. Adv Eng Softw. 39:233–241.
  • Kerzner H. 2003. Project management a systems approach to planning, scheduling and controlling. New Jersey: John Wiley and Sons.
  • Kim S, Maghiar M, Li L, Bai Y. 2014. Developing a knowledge-based information system (KISCCES) for construction cost estimating and scheduling. ASCE Conf Construct Res Congress.
  • Koo B, Fischer M. 2000. Feasibility study of 4D CAD in commercial construction. Construct Eng Manag. 126:251–260.
  • Laufer A. 1990. Essentials of project planning: owner’s perspective. J Manag Eng. 6:162–176.
  • Laufer A. 1992. A micro view of the project planning process. Construct Manag Econ. 10:31–43.
  • Laufer A, Shapira A, Zall DC, Howell GA. 1993. Prebid and preconstruction planning process. J Construct Eng Manag. 119:426–444.
  • Lee S, Nikolic D, Messner JI. 2015. Framework of the virtual construction simulator 3 for construction planning and management education. J Comput. Civil Eng. 29:05014008-1-13.
  • Leite F, Cho Y, Behzadan AH, Lee SH, Choe S, Fang Y, Akhavian R, Hwang S. 2016. Visualization, information modeling, and simulation: grand challenges in the construction industry. Comput Civil Eng. 30:04016035-1-16.
  • Li H, Kong, CW, Pang YC, Shi WZ, Yu L. 2003. Internet-based Geographic Information Systems system for E-commerce application in construction material procurement. J Construct Eng Manag. 129:689–697.
  • Lin KL, Haas CT. 1996. An interactive planning environment for critical operations. J Construct Eng Manag. 122:212–222.
  • LISCAD. 2014. LISCAD surveying & engineering software. [Accessed June 21 2014]. http://www.liscad.com/liscad/.
  • Marshall-Ponting AJ, Aouad G. 2005. An nD modeling approach to improve communication processes for construction. Automat Construct. 14:311–332.
  • Migliaccio G, Zandbergen P, Martinez A. 2013. Empirical comparison of methods for estimating location cost adjustments factors. J Manag Eng. doi: 10.1061/(ASCE)ME.1943-5479.000024004014037.
  • Morad AA, Beliveau YJ. 1994. Geometric-based reasoning system for project planning. J Comput Civil Eng. 8:52–71.
  • Morad AA, Beliveau YJ. 1991. Knowledge-based planning system. J Construct Eng Manag. 117:1–12.
  • Nguyen TH, Oloufa AA. 2001. Computer-generated building data: topological information. J Comput Civil Eng. 15:268–274.
  • Oloufa AR, Eltahan AA, Papacostas CS. 1994. Integrated GIS for construction site investigation. J Construct Eng Manag. 120:211–222.
  • Paul N, Borrmann A. 2009. Geometrical and topological approaches in building information modelling. J Inform Technol Construct. 14:705–723.
  • Poku SE, Arditi D. 2006. Construction scheduling and process control using geographic information systems. Construct Eng Manag. 20:351–360.
  • Sampaio AZ, Martins OP. 2014. The application of virtual reality technology in the construction of bridge: the cantilever and incremental launching methods. Automat Construct. 37:58–67.
  • Shen Z, Orr K, Choi W, Kim N. 2014. Object-based 3D intelligent model for construction planning/simulation in a highway construction ASCE Conf Construct Res Congress.
  • SketchUp. 2015. Google SketchUp Plugins. [Accessed 2015 May 15]. http://sketchup.google.com/intl/en/download/plugins.html.
  • Thomas HR, Ellis RD. 2007. Contractor prebid planning principles. J Construct Eng Manag. 133:542–552.
  • Varghese K, O’Connor JT. 1995. Routing large vehicles on industrial construction site. Construct Eng Manag. 121:1–12.
  • Waly AF, Thabet WY. 2002. A virtual construction environment for pre-construction planning. Automat Construct. 12:139–154.
  • Zanenc PPA, Hartmanna T, Al-Jibourib SHS, Heijmansc HWN. 2013. Using 4D CAD to visualize the impacts of highway construction on the public. Automat Construct. 32:136–144.
  • Zlatanova S, Prosperi D. 2005. Large-scale 3D data integration: challenges and opportunities. Boca Raton, FL: CRC Press.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.