388
Views
11
CrossRef citations to date
0
Altmetric
Original Articles

Developing a building-performance evaluation framework for post-disaster reconstruction: the case of hospital buildings in Aceh, Indonesia

ORCID Icon &
Pages 56-77 | Received 04 Aug 2017, Accepted 25 Jul 2018, Published online: 16 Nov 2018

References

  • Abulnour AH. 2014. The post-disaster temporary dwelling: fundamentals of provision, design and construction. Hous Build Natl Res Cent. 10(1):10–24.
  • Adamy A. 2009. BRR, nilai proyek dan evaluasi. Rehab rekon. Online article ed. Banda Aceh: The Aceh Institute.
  • Adamy A, Abu Bakar AH. 2011. Asset evaluation for post-disaster project built by central government in Banda Aceh Indonesia. Asian J Environ Disast Manage. 03(04):405–423.
  • Adewunmi Y, Omirin M, Famuyiwa F, Farinloye O. 2011. Post-occupancy evaluation of postgraduate hostel facilities. Facilities. 29(3–4):149–168.
  • AEDET. 2003. Achieving excellence design evaluation. London (UK): Department of Health.
  • Akter S, D’Ambra J, Ray P. 2010. Service quality of health: development and validation of a hierarchical model using PLS. Electron Market. 20(3–4):209–227.
  • Amaratunga D, Baldry D. 2003. A conceptual framework to measure facilities management performance. Proper Manage. 21(2):171–189.
  • Arain F. 2015. Knowledge-based approach for sustainable disaster management: empowering emergency response management team. Proc Eng. 118:232–239.
  • Asian Development Bank. 2005. An initial assessment of the impact of the earthquake and tsunami of December 26, 2004 on south and Southeast Asia. Philippines, Manila.
  • Baird G. 2009. Incorporating user performance criteria into building sustainability rating tools (BSRTs) for buildings in operation. Sustainability. 1(4):1069–1086.
  • Bambang, Firdaus. 2006. Budget tracking: Aceh rehabilitation and reconstruction. In: Foundation T, editor. Banda Aceh, Indonesia: GERAK Aceh.
  • Becker F. 1990. The total workplace. New York (NY): Van Nostrand Reinhold.
  • Bordass B, Leaman A, Ruyssevelt P. 2001. Assessing building performance in use 5: conclusions and implications. Build Res Inform. 29(2):144–157.
  • Bouaicha R, Bouri A. 2013. Modeling the quality of external audit: emperical validation in the Tunisian context. J Emerg Trend Econ Manage Sci. 4(2):233–242.
  • BRR NAD-Nias. 2008. Asset management and administering results for rehabilitation and reconstruction (on-budget). Center for accounting and asset management. Banda Aceh, Indonesia: BRR NAD-Nias.
  • BRR NAD-Nias. 2009. Education, health, women empowerment: preparing quality generation. Banda Aceh, Indonesia: BRR NAD-Nias.
  • Chin WW. 1998. The partial least squares approach to structural equation modeling. In: Marcoulides GA, editor. Modern business research methods. Mahwah (NJ): Lawrence Erlbaum Associates.
  • Chin WW. 2010. How to write up and report PLS analyses. In: Vinci VE, Chin WW, Henseler J, editors. Modern methods for business research. Mahwah (NJ): Lawrence Erlbaum Asscociates.
  • Chin WW, Newsted PR. 1999. Structural equation modeling analysis with small samples using partial least squares. In: Hoyle R, editor. Statical strategies for small sample research. Thousand Oaks (CA): Sage Publications; p. 307–341.
  • Cole RJ. 1998. Emerging trend in building environmental assessment methods. Build Res Inform. 26(1):3–16.
  • da Silva J. 2010. Lessons from Aceh: key considerations in post-disaster reconstruction. Warwickshire (UK): Practical Action Publishing.
  • Dinas Kesehatan Provinsi NAD. 2006. Profil kesehatan provinsi nangroe aceh darussalam 2005. Banda Aceh.
  • Dorasol N, Sarrazin I, Hakim A, Hamadan N, Nik Lah NMI. 2012. POE Performance criteria and parameters for hospital building in Malaysia. 3rd International Conference on Business and Economic Research, Golden Flower Hotel; 12–13 March; Bandung, Indonesia.
  • Douglas J. 1996. Building performance and its relevance to facilities management. Facilities. 14(3–4):23–32.
  • Edwards JR. 2001. Multidimensional constructs in organizational behavior research: an integrative analytical framework. Organ Res Method. 4(2):144–192.
  • Evans H. 2010. Provincial human development report aceh 2010. Banda Aceh, Indonesia: UNDP – Indonesia: Dinas Kesehatan Provinsi NAD.
  • FEMA. 2007. Design guide for improving hospital safety in earthquake, floods, and high winds. Washington, DC: Federal Emergency Management Agency.
  • Fornell C, Bookstein FL. 1982. Two structural equations models: LISREL and PLS applied to costumer exit-voice theory. J Market Res. 19(4):440–452.
  • Government of Aceh. 2011. The progress of rehab recon and exit strategy after earthquake and tsunami. Banda Aceh, Indonesia: Government of Aceh.
  • Green Building Council Indonesia. 2012. Greenship Rating Tools. Jakarta: Green Building Council Indonesia.
  • GTZ. 2002. Disaster risk management. Eschborn, Germany: GTZ.
  • Haigh R, Amaratunga D. 2010. An integrative review of the built environment discipline’s role in the development of society’s resilience to disasters. Int J Dis Res Built Enviorn. 1(1):11–24.
  • Hair JF, Hilt TM, Tingle C, Sarstedt M. 2013. A primer on partial least squares structural equation modeling (PLS-SEM). Thousand Oaks (CA): Sage.
  • Hair JF, Sarstedt M, Ringle CM, Mena JA. 2012. An assessment of the use of partial least sqaures structural equation modeling in marketing research. J Acad Mark Sci. 40(3):414–433.
  • Hayat E, Amaratunga D. 2014. The impact of the local political and socio-economic condtition to the capacity of the local governments in the maintenance of post-disaster road infrastructure reconstruction assets. Proc Econ Financ. 18:718–726.
  • Hulland J. 1999. Use of partial least squares (PLS) in strategic management research: a review of four recent studies. Strategic Management Journal. 20(2):195–204.
  • [IOM] Institute of Medicine. 1999. To err is human: building a safer health system. Washington (DC): National Academy Press.
  • Ismail D, Majid TA, Roosli R, Samah NA. 2014. Project management success for post-disaster reconstruction projects: international NGOs perspectives. Proc Econ Financ. 18:120–127.
  • Jarvis CB, MacKenzie SB, Podsakoff PM. 2003. A critical review of construct indicators and measurement model misspecification in marketing and consumer research. J Consum Res. 30(2):199–218.
  • Jayasuriya S, McCawley P. 2010. The Asian tsunami. Aid and reconstruction after a disaster. Tokyo, Japan: Edward Elgar Publishing Ltd. and the Asian Development Bank Institute.
  • Jha AK, Barenstein JD, Phelps PM, Pittet D, Sena S. 2010. Safer homes, stronger communities: a handbook for reconstructing after natural disasters. Washington (DC): World Bank.
  • Kelly C. 1996. Limitations to the use of military resources for foreign disaster assistance. Disast Prev Manage. 5(1):22–29.
  • Kernohan D, Gray J, Daish J, Joiner D. 1992. User participation in building design and anagement. Oxford: Butterworth-Heinemann Ltd.
  • Kirkpatrick C, editor. 1991. Project rehabilitation in developing countries. London: Routledge.
  • Konara S. 2010. Building post occupancy evaluation framework. Colombo, Sri Lanka: University of Colombo.
  • Krejcie RV, Morgan DW. 1970. Determining Sample Size for Research Activities. Educational and Psychological Measurement. 30:607–610.
  • Latham B. 2007. Sampling: what is it? Quantitative research methods. http://webpages.acs.ttu.edu/rlatham/Coursework/5377(Quant))/Sampling_Methodology_Paper.pdf.
  • Lavy S, Garcia JA, Dixit MK. 2010. Establishment of KPIs for facility performance measurement: review of literature. Facilities. 28(9–10):440–464.
  • Leaman A, Stevenson F, Bordass B. 2010. Building evaluation: practice and principles. Build Res Inform. 38(5):564–577.
  • Lowe R, Chiu LF, Oreszczyn T. 2017. Socio-technical case study method in building performance evaluation. Build Res Inform. 1:16.
  • Lyons, Boano. 2010. Building back better: delivering people centered housing reconstruction at scale. Rugby (UK): Practical Action Publishing.
  • MacAskill K, Guthrie P. 2015. A hierarchy of measures for infrastructure resilience - learning from post-disaster reconstruction in Christchurch, New Zealand. Civil Eng Environ Syst. 32(1–2):130–142.
  • MacKenzie SB, Podsakoff PM, Jarvis CB. 2005. The problem of measurement model misspecification in behavioral and organizational research and some recommended solutions. J Appl Psychol. 90(4):710–730.
  • Martinez-Ruiz A, Aluja-Banet T. 2009. Toward the definition of a structural equation model of patent value: PLS path modeling with formative constructs. Revstat Stat J. 7(3):265–290.
  • Masyrafah H, McKeon JMJA. 2008. Post-tsunami aid effectiveness in Aceh: proliferation and coordination in reconstruction. Washington (DC): Wolfensohn Center for Development.
  • Moe TL, Pathranarakul P. 2006. An integrated approach to natural disaster management, public project. Disast Prev Manage. 15(3):396–413.
  • Myeda NE, Kamaruzzaman SN, Pitt M. 2011. Measuring the performance of office buildings maintenance management in Malaysia. J Facil Manage. 9(3):181–199.
  • Ofori G. 2001. Construction in disaster management. Singapore: National University of Singapore.
  • Pallant J. 2005. SPPS survival manual: a step by step guide to data analysis using SPPS for windows version 12). 2nd ed. Australia: Allen & Unwin.
  • Parida A, Kumar U. 2006. Maintenance performance measurement (MPM): issues and challenges. J Qual Maintenance Eng. 12(3):239–251.
  • Pathirage C, Haigh R, Amaratunga D, Baldry D. 2008. Knowledge management practices in facilities organisations; a case study. J Facil Manage. 6(1):5–22.
  • Potangaroa R. 2015. Sustainability by design: the challenge of shelter in post-disaster reconstruction. Proc Soc Behav Sci. 179:212–221.
  • Preiser FE, Schramm U. 1998. Building performance evaluation. Time-saver standards for architectural data. Berlin, Germany: Springer; p. 233–238.
  • Preiser WFE, Hardy AE, Schramm U, editors. 2017. Building performance evaluation: from delivery process to life cycle phases. 2nd ed. Switzerland: Springer Nature.
  • Preiser WFE, Vischer JC, editors. 2005. Assessing building performance. Oxford: Elsevier Butterworth-Heinemann.
  • President I. 2017. Laws of the republic Indonesia: construction service. No 2, Jakarta.
  • Reid A. 2006. Verandah of violence, the background to the aceh problem. Singapore: Singapore University Press.
  • Resosudarmo B, Nazara S. 2007. Aceh-nias reconstruction and rehabilitation: progress and challenges at the end of 2006. Chiyoda, Tokyo: Asian Development Bank Institute.
  • Shafique K, Warren CMJ. 2016. Stakeholders and their significance in post natural disaster reconstruction projects: a systematic review on the literature. Asian Soc Sci. 12(10):1–17.
  • Shauna MH, Preiser WFE, Watson C, editors. 2012. Enhancing building performance. New York (NY): John Wiley and Sons.
  • Shaw R. 2006. Indian Ocean tsunami and aftermath. Need for environment-disatser synergy in the reconstruction process. Disast Prev Manage. 15(1):5–20.
  • Soesastro H, Atje R. 2005. Survey of recent developments. Bull Indonesia Econ Stud. 41(1):5–34.
  • Takahashi M, Tanaka S, Kimura R, Umitsu M, Tabuchi R, Kuroda T, Ando M, Kimata F. 2007. Restoration after the Sumatra earthquake tsunami in Banda Aceh: based on the results of interdisciplinary researches by Nagoya University. J Nat Dis Sci. 29(2):53–61.
  • Telford J, Cosgrave J, Houghton R. 2006. Joint evaluation of the international response to the Indian ocean tsunami: synthesis report. London: Tsunami Evaluation Coalition.
  • Thampi 2005. Ensuring Effective Project Monitoring and Evaluation. Curbing Corruption in Tsunami Relief Operations: Jakarta, Indonesia.
  • The Aceh Institute. 2010. Post 2009 completion of reconstruction work in Aceh. Banda Aceh, Indonesia: The Aceh Institute.
  • Transition Sector. 2009. Inventory report asset rehabilitation and reconstruction of Aceh. Banda Aceh, Indonesia: Assistance Team for Aceh Governor.
  • UNCHS. 2001. Guidelines for the evaluation of post disaster programmes: a resource guide. Nairobi, Kenya: The United Nations Centre for Human Settlements (UNCHS) Habitat, Risk and Disaster Management Unit.
  • van Beuningen J, Schmeets H. 2013. Social capital in 2009: an index for the Netherlands. Soc Behav Sci. 72:73–90.
  • Wetzels M, Odekerken-Schroder G, van Oppen C. 2009. Using PLS path modeling for assessing hierarchical construct models: guidelines and empirical illustration. MIS Quart. 33(1):177–195.
  • Wibisana BH, Bitai CC. 2009. Education, health, women empowerment. BRR NAD-Nias. Banda Aceh, Indonesia: BRR Book Series.
  • Zimmerman A, Martin M. 2001. Post-occupancy evaluation: benefits and barriers. Building Research and Information. 29(2):168–174.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.