References
- Aktas B, Ozorhon B. 2015. Green building certification process of existing buildings in developing countries: cases from Turkey. J Manage Eng. 31(6):05015002. 1–9.
- Arashpour M, Wakefield R, Blismas N, Lee EWM. 2014. Analysis of disruptions caused by construction field rework on productivity in residential projects. J Const Eng Mngmnt. 140(2):1–12.
- Argyris C. 1992. On organizational learning. Oxford, England: Blackwell Scientific.
- Argyris C, Schön D. 1978. Organisational learning: A theory of action perspective. Reading, Mass: Addison-Wesley.
- Barber P, Graves A, Hall M, Sheath D, Tomkins C. 2000. Quality failure costs in civil engineering projects. Int J Qual & Reliability Mgmt. 17(4/5):479–492.
- Bernold LE, Lee TS. 2010. Experimental research in construction. J Constr Eng Mngmnt. 136(1):26–35.
- Caldas CH, Gibson GE, Jr., Weerasooriya R, Yohe AM. 2009. Identification of effective management practices and technologies for lessons learned programs in the construction industry. J Constr Eng Mngmnt. 135(6):531–539.
- Carrillo P, Ruikar K, Fuller P. 2013. When will we learn? Improving lessons learned practice in construction. Int J Project Mngmnt. 31(4):567–578.
- Chinowsky P, Carrillo P. 2007. Knowledge management to learning organization connection. J Manage Eng. 23(3):122–130.
- Chiva R, Alegre J. 2005. Organizational learning and organizational knowledge: Towards the integration of two approaches. Mngmnt Learning. 36(1):49–68.
- Choi C, Kelly T, Cooper KG. 2002. “The rework cycle game: learning complex project change impacts in a game setting.” Paper presented at Project Management Institute Annual Seminars & Symposium, San Antonio, TX. Newtown Square, PA: Project Management Institute.
- Crossan MM, Lane HW, White RE. 1999. An organizational learning framework: From intuition to institution. AMR. 24(3):522–537.
- Edmondson A. 1999. Psychological safety and learning behavior at work in teams. Administrative Sci Quartrly. 44(2):350–383.
- Eisenhardt KM. 1989. Building theories from case study research. AMR. 14(4):532–550.
- Esmi R, Ennals R. 2009. Knowledge management in construction companies in the UK. AI & Soc. 24(2):197–203.
- Fernie S, Green SD, Weller SJ, Newcombe R. 2003. Knowledge sharing: context, confusion and controversy. Int J Project Mngmnt. 21(3):177–187.
- Fiol C, Lyles M. 1985. Organizational learning. AMR. 10(4):803–813.
- Ford DN, Voyer JJ, Wilkinson JMG. 2000. Building learning organizations in engineering cultures. J Mngmnt Eng. 16(4):72–83.
- Hogan R, Warrenfeltz R. 2003. Educating the modern manager. AMLE. 2(1):74–84.
- Huber G. 1991. Organizational learning: The contributing processes and literature. Organization Sci. 2(1):88–115.
- Hwang B-G, Thomas SR, Haas CT, Caldas CH. 2009. Measuring the impact of rework on construction cost performance. J Constr Eng Manage. 135(3):187–198.
- Hwang B-G, Zhao X, Goh JK. 2014. Investigating the client-related rework in building projects: The case of Singapore. Int J Project Mngmnt. 32(4):698–708.
- Josephson P-E, Larsson B, Li H. 2002. Illustrative benchmarking rework and rework costs in Swedish construction industry. J Mngmnt Eng. 18(2):76–83.
- Knipfer K, Kump B, Wessel D, Cress U. 2013. Reflection as a catalyst for organizational learning. Studies Continuing Educ. 35(1):30–48.
- Kolb D. 1984. Experiential learning as the science of learning and development. Englewood Cliffs, NJ: Prentice Hall.
- Kululanga GK, McCaffer R, Price ADF, Edum-Fotwe F. 1999. Learning mechanisms employed by construction contractors. J Construct Eng Mngmnt. 125(4):215–233.
- Lee G, Park HK, Won J. 2012. D3 City project—Economic impact of BIM-assisted design validation. Automation Construct. 22:577–586.
- Loosemore M. 2015. Construction innovation. J Mngmnt Eng. 31(6):04015012. 1-9.
- Lopez SP, Peon JMM, Ordas CJV. 2006. Human resource management as a determining factor in organizational learning. Mngmnt Learning. 37(2):215–239.
- Love PED. 2002. Auditing the indirect consequences of rework in construction: A case based approach. Managerial Auditing J. 17(3):138–146.
- Love PED. 2002. Influence of project type and procurement method on rework costs in building construction projects. J Construct Eng Mngmnt. 128(1):18–29.
- Love PED, Ackermann F, Smith J, Irani Z, Edwards DJ. 2016. Making sense of rework causation in offshore hydrocarbon projects. Project Mngmnt J. 47(4):16–13.
- Love PED, Ackermann F, Teo P, Morrison J. 2015. From individual to collective learning: A conceptual learning framework for enacting rework prevention. J Constr Eng Mngmnt. 141(11):05015009. 1-10.
- Love PED, Edwards DJ. 2004. Forensic project management: The underlying causes of rework in construction projects. Civil Eng Envrnmntal Systems. 21(3):207–228.
- Love PED, Edwards DJ, Smith J. 2005. A forensic examination of the causal mechanisms of rework in a structural steel supply chain. Managerial Auditing J. 20(2):187–197.
- Love PED, Edwards DJ, Smith J, Walker DHT. 2009. Divergence or congruence? A path model of rework for building and civil engineering projects. J Perform Constr Facil. 23(6):480–488.
- Love PED, Edwards DJ, Watson H, Davis P. 2010. Rework in civil infrastructure projects: Determination of cost predictors. J Constr Eng Manage. 136(3):275–282.
- Love PED, Li H. 2000. Overcoming the problems associated with quality certification. Construction Mngmnt Economics. 18(2):139–149.
- Love PED, Mandal P, Li H. 1999. Determining the causal structure of rework influences in construction. Construction Mngmnt Economics. 17(4):505–517.
- Love PED, Smith J. 2003. Benchmarking, benchaction, and benchlearning: Rework mitigation in projects. J Mngmnt Eng. 19(4):147–159.
- Love PED, Teo P, Davidson M, Cumming S, Morrison J. 2016. Building absorptive capacity in an alliance: Process improvement through lessons learned. Int J Project Mngmnt. 34(7):1123–1137.
- McCutcheon DM, Meredith JR. 1993. Conducting case study research in operations management. J Operations Mngmnt. 11(3):239–256.
- Nevis EC, DiBella AJ, Gould JM. 1995. Understanding organizations as learning systems. Sloan Mngmnt Rev. 36(2):73–85.
- Osipova E. 2015. Establishing cooperative relationships and joint risk management in construction projects. J Manage Eng. 31(6):05014026. 1–9.
- Öztürk GB, Arditi D, Günaydın HM, Yitmen İ. 2016. Organizational learning and performance of architectural design firms in Turkey. J Manage Eng. 32(5):05016015. 1-17.
- Palaneeswaran E, Love PED, Kim JT. 2014. Role of design audits in reducing errors and rework: Lessons from Hong Kong. J Perform Constr Facil. 28(3):511–517.
- Robinson HS, Carrillo PM, Anumba CJ, Al-Ghassani AM. 2001. “Knowledge management: Towards an integrated strategy for construction project organisations.” Proc., 4th European Project Management Institute (PMI) Conf., London.
- Robinson-Fayek A, Manjula Dissanayake M, Campero O. 2003. Measuring and classifying construction rework: A pilot study. Alberta, Canada: Department of Civil and Environmental Engineering, Construction Owners Association of Alberta.
- Rogge DF, Cogliser C, Alaman H, McCormack S. 2001. An investigation of field rework in industrial construction. Austin, TX: Construction Industry Institute.
- Sacks R, Eastman CM, Lee G. 2003. Process improvements in precast concrete construction using top-down parametric 3-D computer-modeling. PCIJ. 48(3):46–55.
- Tezel A, Koskela L, Tzortzopoulos P, Formoso CT, Alves T. 2015. Visual management in Brazilian construction companies: Taxonomy and guidelines for implementation. J Manage Eng. 31(6):05015001. 1-14.
- Todd DJ. 1979. Mixing qualitative and quantitative methods: Triangulation in action. Admnstrative Sci Quarterly. 24(4):602–611.
- Williams T. 2008. How do organizations learn lessons from projects—and do they? IEEE Trans Eng Manage. 55(2):248–266.
- Wong PSP, Cheung SO, Fan KL. 2009. Examining the relationship between organizational learning styles and project performance. J Constr Eng Manage. 135(6):497–507.
- Wong PSP, Lam KY. 2012. Facing turbulence driving force for construction organizations to regain unlearning and learning traction. J Constr Eng Manage. 138(10):1202–1211.
- Ye G, Jin Z, Xia B, Skitmore M. 2015. Analyzing causes for reworks in construction projects in China. J Mngmnt Eng. 31(6):04014097. 1-9.
- Yin RK. 2009. Case study research: Design and methods (applied social research methods). 4th ed. Thousand Oaks, CA: Sage Publications.
- Young NW, Jr., Jones SA, Bernstein HM, Gudgel JE. 2009. The business value of BIM, SmartMarket Report. Bedford, MA: McGraw Hill Construction.
- Zhai X, Liu AMM, Fellows R. 2014. Role of human resource practices in enhancing organizational learning in Chinese construction organizations. J Manage Eng. 30(2):194–204.
- Zhang D, Haas CT, Goodrum PM, Caldas CH, Granger R. 2012. Construction small-projects rework reduction for capital facilities. J Constr Eng Manage. 138(12):1377–1385.