An overview of the risk of delay in Cyprus construction industry

&
Pages 369-381 | Received 28 Oct 2017, Accepted 21 Oct 2018, Published online: 22 Nov 2018

References

  • Abd El-Razek ME, Bassioni HA, Mobarak A. 2008. Causes of delay in building construction projects in Egypt. J Constr Eng Manage. 134(11):831–841. doi:10.1061/(ASCE)0733-9364(2008)134:11(831)
  • Ahmed SM, Azhar S, Castillo M, Kappagantula P. 2002. Construction delays in Florida: An empirical study, Final Report. Miami, USA: Department of Construction Management (CEAS2952) Florida International University.
  • Aziz RF. 2013. Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Eng J. 52(3):387–406. doi:10.1016/j.aej.2013.03.002
  • Chang AS. 2002. Reasons for cost and schedule increase for engineering design projects. J Manage Eng. 18(1):29–36. doi:10.1061/(ASCE)0742-597X(2002)18:1(29)
  • Chua DKH, Kog YC, Loh PK. 1999. Critical success factors for different project objectives. J Constr Eng Manage. 125(3):142–150. doi:10.1061/(ASCE)0733-9364(1999)125:3(142)
  • CIOB. 2009. Managing the risk of delayed completion in the 21st century. Berkshire, UK: The Chartered Institute of Building.
  • CIOB. 2014. Code of practice for project management for construction and development. 5th ed. Berkshire, UK: The Chartered Institute of Building.
  • Cooke B, Williams P. 2004. Construction planning programming and control. 2nd ed. Blackwell Publishing.
  • Doloi H, Sawhney A, Iyer KC, Rentala S. 2012. Analysing factors affecting delays in Indian construction projects. Int J Proj Manage. 30(4):479–489. doi:10.1016/j.ijproman.2011.10.004
  • Dozzi SP, AbouRizk SM. 1993. Productivity in construction. Canada: National Research Council. NRCC-37001.
  • El-Sayegh SM. 2008. Risk assessment and allocation in the UAE construction industry. Int J Proj Manage. 26(4):431–438. doi:10.1016/j.ijproman.2007.07.004
  • Frimpong Y, Oluwoye J, Crawford L. 2003. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. Int J Proj Manage. 21(5):321–326. doi:10.1016/S0263-7863(02)00055-8
  • Gardezi SSS, Manarvi IA, Gardezi SJS. 2014. Time extension factors in construction industry of Pakistan. Procedia Eng. 77:196–204. doi:10.1016/j.proeng.2014.07.022
  • Gündüz M, Nielsen Y, Özdemir M. 2013. Quantification of delay factors using the relative importance index method for construction projects in Turkey. J Manage Eng. 29(2):133–139. doi:10.1061/(ASCE)ME.1943-5479.0000129.
  • Ibbs W. 2005. Impact of change’s timing on labor productivity. J Constr Eng Manage. 131(11):1219–1223. doi:10.1061/(ASCE)0733-9364(2005)131:11(1219)
  • Kaliba C, Muya M, Mumba K. 2009. Cost escalation and schedule delays in road construction projects in Zambia. Int J Proj Manage. 27(5):522–531. doi:10.1016/j.ijproman.2008.07.003
  • Kumaraswamy MM, Chan DWM. 1998. Contributors to construction delay. Constr Manage Econ. 16(1):17–29. doi:10.1080/014461998372556
  • Memon AH, Abdul Rahman I, Abdullah MR, Azia A, Ade A. 2010. Factors affecting construction cost in Mara large construction project: Perspective of project management consultant. Int J Sustain Constr Eng Technol. 1:41–54.
  • Muhwezi L, Acai J, Otim G. 2014. An assessment of the factors causing delays on building construction projects in Uganda. Int J Constr Eng Manage. 3:13–23. doi:10.5923/j.ijcem.20140301.02
  • Niazi GA, Painting N. 2017. Significant factors causing cost overruns in the construction industry in Afghanistan. Procedia Eng. 182:510–517. doi:10.1016/j.proeng.2017.03.145
  • Odeh AM, Battaineh HT. 2002. Causes of construction delay: Traditional contracts. Int J Proj Manage. 20(1):67–73. doi:10.1016/S0263-7863(00)00037-5
  • Olawale Y, Sun M. 2015. Construction project control in the UK: Current practice, existing problems and recommendations for future improvement. Int J Proj Manage. 33(3):623–637. doi:10.1016/j.ijproman.2014.10.003
  • Orangi A, Palaneeswaran E, Wilson J. 2011. Exploring delays in Victoria-based Astralian pipeline projects. Procedia Eng. 14:874–881. doi:10.1016/j.proeng.2011.07.111
  • Polat G, Okay F, Eray E. 2014. Factors affecting cost overruns in micro-scaled construction companies. Procedia Eng. 85:428–435. doi:10.1016/j.proeng.2014.10.569
  • RIBA. 2013. RIBA plan of work. UK: Royal Institute of British Architects [online]. https://www.ribaplanofwork.com/Default.aspx.
  • Society of Construction Law. 2002. The society of construction law delay and disruption protocol. Wantage, England: Society of Construction Law.
  • Society of Construction Law. 2017. The society of construction law delay and disruption protocol. 2nd ed. Hinckley, England: Society of Construction Law.
  • Sweis G, Sweis R, Abu Hammad A, Shboul A. 2008. Delays in construction projects: The case of Jordan. Int J Proj Manage. 26(6):665–674. doi:10.1016/J.IJPROMAN.2007.09.009
  • Vacanas Y, Themistocleous K, Agapiou A, Danezis C. 2016. Methodology for infrastructure project management, dispute avoidance and delay analysis. Anales de Edificación. 2(1):12–19. doi:10.20868/ade.2016.3193
  • Vacanas Y, Themistocleous K, Agapiou A, Hadjimitsis D. 2015. Building Information Modelling (BIM) and Unmanned Aerial Vehicle (UAV) technologies in infrastructure construction project management and delay and disruption analysis. Third International Conference on Remote Sensing and Geoinformation of the Environment (RSCy2015), Proc. of SPIE Vol. 9535. p. 95350C–1: 1–11. doi:10.1117/12.2192723
  • Zidane Y-T, Andersen B. 2018. Causes of delay and their cures in major Norwegian projects. J Mod Proj Manage. 5(3): 80–91. doi:10.19255/JMPM01509
  • Zou PXW, Zhang G, Wang J. 2007. Understanding the key risks in construction projects in China. Int J Proj Manage. 25(6):601–614. doi:10.1016/j.ijproman.2007.03.001

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.