References
- Agrama F. 2006. Line of balance technique by genetic optimization [PhD thesis]. Structural Engineering Department, Tanta University, Egypt.
- Altuwaim A, El-Rayes K. 2018a. Optimizing the scheduling of repetitive construction to minimize interruption cost. Construct Eng Manage. 144(7):1–12. (ASCE)CO.1943-7862.0001510.
- Altuwaim A, El-Rayes K. 2018b. Minimizing duration and crew work interruptions of repetitive construction projects. Automation Construct. 88:59–72.
- Ammar M, Abdel-Maged A. 2017. Modeling of LOB scheduling with learning development effect. Int J Construct Manage. 1–10. .
- Ammar M. 2005. Resource optimization in LOB scheduling. In: 11th International colloquium on structural and geotechnical engineering. Egypt: Ain-Shams University; p. 1–10.
- Arditi D, Albulak M. 1986. Line-of-balance in pavement construction. Construct Eng Manage. 112(3):411–424.
- Bragadin M. 2010. Heuristic repetitive activity scheduling process for networking techniques. CIB 2010 World Build Congr. 331–342.
- Callahan M, Quachenbush D, Rowings J. 1992. Construction project scheduling. New York: McGraw-Hill, Inc.
- Damci A, Arditi D, Polat G. 2013. Resource levelling in line-of-balance scheduling. Comput-Aided Civil Infrastruct Eng. 28(9):679–692.
- Eid M, Elbeltagi E, El-Adaway I. 2018. Simultaneous multi-criteria optimization for scheduling linear infrastructure projects. Int J Construct Manage. 1. .
- El-Kholy A. 2012. Scheduling repetitive construction projects using fuzzy linear programming. IOSRJMCE. 4(2):13–22.
- El-Rayes K, Moselhi O. 1998. Resource-driven scheduling of repetitive projects. Construct Manage Econ. 16(4):433–446.
- El-Rayes K, Moselhi O. 2001. Optimizing resource utilization for repetitive construction projects. Construct Eng Manage. 127(1):18–27.
- Hegazy T, Wassef N. 2001. Cost optimization in projects with repetitive nonserial activities. Construct Eng Manage. 127(3):183–191.
- Hegazy T. 2002. Computer-based construction project management. Upper Saddle River, NJ: Prentice Hall.
- Hyari K, El-Rayes K. 2006. Optimal planning and scheduling for repetitive construction projects. J Manage Eng. 22(1):11–19.
- Jaafari A. 1984. Criticism of CPM for project planning analysis. Construct Eng Manage. 110(2):222–233.
- LINGO. 2000. LINGO user’s manual. Chicago: LINDO Systems, Inc.
- Moselhi O, El-Rayes K. 1993. Scheduling of repetitive projects with cost optimization. Construct Eng Manage. 119(4):681–697.
- Moselhi O, Hassanein A. 2003. Optimized scheduling of linear projects. Construct Eng Manage. 129(6):664–673.
- Nassar K. 2005. Evolutionary optimization of resource allocation in repetitive construction schedules. J Inform Technol Construct. 10:256–273.
- Reda R. 1990. RPM: repetitive project modeling. Construct Eng Manage. 116(2):316–330.
- Russell A, Caselton W. 1988. Extensions to linear scheduling optimization. Construct Eng Manage. 114(1):36–52.
- Selinger S. 1980. Construction planning for linear projects. Construct Div ASCE. 106(2):195–205.
- Senouci A, Eldin N. 1996. A time-cost trade-off algorithm for nonserial linear projects. Can J Civil Eng. 23(1):134–149.
- Strdal O, Cacha J. 1982. Time space scheduling method. Construct Div ASCE. 108(3):445–457.
- Suhail S, Neale R. 1994. CPM/LOB: new methodology to integrate CPM and line of balance. Construct Eng Manage ASCE. 120(3):667–684.
- Talodhikar H, Pataskar S. 2015. Implementation of line of balance method for scheduling high-rise building. J Eng Res Appl. 5(3):9–12.
- Vanhoucke M. 2006. Work continuity constraints in project scheduling. J Constr Eng Manage. 132(1):14–25.
- Zou X, Zhang L, Zhang Q. 2018. A biobjective optimization model for deadline satisfaction in line-of-balance scheduling with work interruptions consideration. Math Prob Eng. 1–12. .