2,542
Views
15
CrossRef citations to date
0
Altmetric
Articles

Towards a more extensive application of off-site construction: a technological review

, , , , &

References

  • Akinade OO, Oyedele LO, Ajayi SO, Bilal M, Alaka HA, Owolabi HA, Bello SA, Jaiyeoba BE, Kadiri KO. 2017. Design for Deconstruction (DfD): critical success factors for diverting end-of-life waste from landfills. Waste Manag. 60:3–13.
  • Arashpour M, Wakefield R, Abbasi B, Lee EWM, Minas J. 2016. Off-site construction optimization: sequencing multiple job classes with time constraints. Autom Constr. 71:262–270.
  • Alwisy A, Al-Hussein M, Al-Jibouri SH. 2012. BIM approach for automated drafting and design for modular construction manufacturing. In Computing in civil engineering (2012) (pp. 221–228).
  • Banihashemi S, Tabadkani A, Hosseini MR. 2017. Modular coordination-based generative algorithm to optimize construction waste. Proc Eng. 180:631–639.
  • Bortolini R, Formoso CT, Viana DD. 2019. Site logistics planning and control for engineer-to-order prefabricated building systems using BIM 4D modelling. Autom Constr. 98:248–264.
  • Bosché F, Abdel-Wahab M, Carozza L. 2016. Towards a mixed reality system for construction trade training. J Comput Civ Eng. 30(2):04015016.
  • Brilakis I, Park M-W, Jog G. 2011. Automated vision tracking of project related entities. Adv Eng Inf. 25(4):713–724.
  • Chai H, Zhang L, Yuan PF. 2019. Advanced timber construction platform: multi-robot system for timber structure design and prefabrication. In The international conference on computational design and robotic fabrication. Singapore: Springer, p. 303–311.
  • Cheng JC, Chen W, Tan Y, Wang M. 2016. A BIM-based decision support system framework for predictive maintenance management of building facilities. In Proceedings of the 16th International Conference on Computing in Civil and Building Engineering (ICCCBE2016).
  • Chang MML, Ong SK, Nee AYC. 2017. Approaches and challenges in product disassembly planning for sustainability. Procedia CIRP. 60:506–511.
  • Chen C. 2016. CiteSpace: a practical guide for mapping scientific literature. New York, USA: Nova Science Publishers, Incorporated.
  • Chen K, Xu G, Xue F, Zhong RY, Liu D, Lu W. 2018. A physical internet-enabled building information modelling system for prefabricated construction. Int J Comput Integr Manuf. 31(4-5):349–361.
  • Chen X, Lu W. 2017. Identifying factors influencing demolition waste generation in Hong Kong. J Cleaner Prod. 141:799–811.
  • Choi J, Choi J, Kim I. 2014. Development of BIM-based evacuation regulation checking system for high-rise and complex buildings. Autom Constr. 46:38–49.
  • Choi JO, Chen XB, Kim TW. 2019. Opportunities and challenges of modular methods in dense urban environment. Int J Constr Manag. 19(2):93–105.
  • Demiralp G, Guven G, Ergen E. 2012. Analyzing the benefits of RFID technology for cost sharing in construction supply chains: a case study on prefabricated precast components. Autom Constr. 24:120–129.
  • Ding L, Zhou Y, Luo H, Wu X. 2012. Using nD technology to develop an integrated construction managemen system for city rail transit construction. Autom Constr. 21:64–73.
  • Du J, Sugumaran V. 2017. Ontology-based information integration and decision making in prefabricated construction component supply chain. Twenty-third Americas Conference on Information Systems, Boston.
  • Du J, Sugumaran V, Gao B. 2017. RFID and multi-agent based architecture for information sharing in prefabricated component supply chain. IEEE Access. 5:4132–4139.
  • Eisenhut L, Seim W, Kühlborn S. 2016. Adhesive-bonded timber-concrete composites–Experimental and numerical investigation of hygrothermal effects. Eng Struct. 125:167–178.
  • Elazouni A, Salem OA. 2011. Progress monitoring of construction projects using pattern recognition techniques. Constr Manag Econ. 29(4):355–370.
  • Eversmann P, Gramazio F, Kohler M. 2017. Robotic prefabrication of timber structures: towards automated large-scale spatial assembly. Constr Robot. 1(1-4):49–60.
  • Feng CG, Hu H, Xu F, Yang J. 2015. An intelligent logistics management model in prefabricated construction. Front Eng. 2(2):178–181.
  • Golparvar-Fard M, Bohn J, Teizer J, Savarese S, Peña-Mora F. 2011. Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques. Autom Constr. 20(8):1143–1155.
  • Golparvar-Fard M, Pena-Mora F, Savarese S. 2015. Automated progress monitoring using unordered daily construction photographs and IFC-based building information models. J Comput Civ Eng. 29(1):04014025.
  • Gourlis G, Kovacic I. 2017. Building Information Modelling for analysis of energy efficient industrial buildings–a case study. Renewable Sustain Energy Rev. 68:953–963.
  • Hager I, Golonka A, Putanowicz R. 2016. 3D printing of buildings and building components as the future of sustainable construction. Procedia Eng. 151(2016):292–299.
  • Han D, Yin H, Qu M, Zhu J, Wickes A. 2020. Technical analysis and comparison of formwork-making methods for customized prefabricated buildings: 3D printing and conventional methods. J Archit Eng. 26(2):04020001.
  • Han Z, Wang Y. 2017. The applied exploration of big data technology in prefabricated construction project management. In ICCREM 2017, pp. 71–78.
  • Hanif MAM. 2012. Geographical Information System on Logistics Management for Industrialized Building System. [Doctoral dissertation, UMP)].
  • Hosseini MR, Martek I, Zavadskas EK, Aibinu AA, Arashpour M, Chileshe N. 2018. Critical evaluation of off-site construction research: a Scientometric analysis. Autom Constr. 87:235–247.
  • Hou L, Wang X, Truijens M. 2015. Using augmented reality to facilitate piping assembly: an experiment-based evaluation. J Comput Civ Eng. 29(1):05014007.
  • Hou L, Wang X, Wang J, Tuijens M. 2014. An integration framework of advanced technologies for productivity improvement for LNG mega-project”, Special Issue on “BIM cloud-based technology in the AEC sector: present status and future trends. J Inform Technol Constr. 19:360–382.
  • Hou L, Chi H, Utiome E, Wang X. 2016. Cooperative and immersive coaching to facilitate skill development in construction tasks. In Lecture notes in computer science. 9929, p. 371–377. Cham, Switzerland: Springer International Publishing. DOI: 10.1007/978-3-319-46771-9_48
  • Hou L, Chi HL, Tarng W, Chai J, Panuwatwanich K, Wang X. 2017. A framework of innovative learning for skill development in complex operational tasks. Autom Constr. 83 :29–40.
  • Hu X, Lu M, AbouRizk S. 2014. BIM-based data mining approach to estimating job man-hour requirements in structural steel fabrication. In Proceedings of the Winter Simulation Conference 2014, pp. 3399–3410, IEEE.
  • Hu ZZ, Zhang JP, Yu FQ, Tian PL, Xiang XS. 2016. Construction and facility management of large MEP projects using a multi-Scale building information model. Adv Eng Softw. 100:215–230.
  • Ismail ZA. 2017. Improving conventional method on precast concrete building maintenance. Ind Manag Data Syst. 117:1485–1502.
  • Jin R, Gao S, Cheshmehzangi A, Aboagye-Nimo E. 2018. A holistic review of off-site construction literature published between 2008 and 2018. J Cleaner Prod. 202:1202–1219.
  • Johnston B, Bulbul T, Beliveau Y, Wakefield R. 2016. An assessment of pictographic instructions derived from a virtual prototype to support construction assembly procedures. Autom Constr. 64:36–53.
  • Kasperzyk C, Kim MK, Brilakis I. 2017. Automated re-prefabrication system for buildings using robotics. Autom Constr. 83:184–195.
  • Khalili A, Chua DK. 2013. IFC-based framework to move beyond individual building elements toward configuring a higher level of prefabrication. J Comput Civ Eng. 27(3):243–253.
  • Khalfan M, Maqsood T. 2014. Current state of off-site manufacturing in Australian and Chinese residential construction. J Constr Eng. 2014:1–5.
  • Kim MK, Wang Q, Park JW, Cheng JC, Sohn H, Chang CC. 2016. Automated dimensional quality assurance of full-scale precast concrete elements using laser scanning and BIM. Autom Constr. 72:102–114.
  • Kong L, Li H, Luo H, Ding L, Luo X, Skitmore M. 2017. Optimal single-machine batch scheduling for the manufacture, transportation and JIT assembly of precast construction with changeover costs within due dates. Autom Constr. 81:34–43.
  • Lee YC, Eastman CM, Solihin W, See R. 2016. Modularized rule-based validation of a BIM model pertaining to model views. Autom Constr. 63:1–11.
  • Li X, Shen GQ, Wu P, Xue F, Chi HL, Li CZ. 2019. Developing a conceptual framework of smart work packaging for constraints management in prefabrication housing production. Adv Eng Inf. 42:100938.
  • Li CZ, Zhong RY, Xue F, Xu G, Chen K, Huang GG, Shen GQ. 2017. Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction. J Cleaner Prod. 165:1048–1062.
  • Liu H, Sydora C, Altaf MS, Han S, Al-Hussein M. 2019. Towards sustainable construction: BIM-enabled design and planning of roof sheathing installation for prefabricated buildings. J Cleaner Prod. 235:1189–1201.
  • Li CZ, Xue F, Li X, Hong J, Shen GQ. 2018. An Internet of Things-enabled BIM platform for on-site assembly services in prefabricated construction. Autom Constr. 89:146–161.
  • Liu G, Li K, Zhao D, Mao C. 2017. Business model innovation and its drivers in the Chinese construction industry during the shift to modular prefabrication. J Manage Eng. 33(3):04016051.
  • Ma G, Jiang J, Shang S. 2019. Visualization of component status information of prefabricated concrete building based on building information modeling and radio frequency identification: a case study in China. Adv Civ Eng. 2019:1–13.
  • Minoli D, Occhiogrosso B. 2018. Ultrawideband (UWB) technology for smart cities IoT applications. The 2018 IEEE International Smart Cities Conference (ISC2).
  • Moon S, Han S, Zekavat PR, Bernold LE, Wang X. 2017. Process-waste reduction in the construction supply chain using proactive information network. Concurrent Eng. 25(2):123–135.
  • Moon S, Xu S, Hou L, Wu C, Wang X, Tam VW. 2017. RFID-aided tracking system to improve work efficiency of scaffold supplier: stock management in Australasian supply chain. J Constr Eng Manage. 144(2):04017115.
  • Mostafa S, Tam VW, Dumrak J, Mohamed S. 2018. Leagile strategies for optimizing the delivery of prefabricated house building projects. Int J Constr Manag. DOI: 10.1080/15623599.2018.1494674
  • Nahangi M, Haas CT, West J, Walbridge S. 2016. Automatic realignment of defective assemblies using an inverse kinematics analogy. J Comput Civ Eng. 30(2):04015008.
  • Nascimento DLDM, Sotelino ED, Lara TPS, Caiado RGG, Ivson P. 2017. Constructability in industrial plants construction: a BIM-Lean approach using the Digital Obeya Room framework. J Civil Eng Manag. 23(8):1100–1108.
  • Nath T, Attarzadeh M, Tiong RL, Chidambaram C, Yu Z. 2015. Productivity improvement of precast shop drawings generation through BIM-based process re-engineering. Autom Constr. 54:54–68.
  • Nawari NO. 2012. BIM standard in off-site construction. J Archit Eng. 18(2):107–113.
  • Niu S, Yang Y, Pan W. 2019. Logistics planning and visualization of modular integrated construction projects based on BIM-GIS integration and vehicle routing algorithm. MOCS. 579–586. DOI: 10.29173/mocs141
  • Niu Y, Lu W, Liu D, Chen K, Anumba C, Huang GG. 2017. An SCO-enabled logistics and supply chain–management system in construction. J Constr Eng Manage. 143(3):04016103.
  • Ramaji IJ, Memari AM. 2016. Product architecture model for multistory modular buildings. J Constr Eng Manage. 142(10):04016047.
  • Ramaji IJ, Memari AM, Messner JI. 2017. Product-oriented information delivery framework for multistory modular building projects. J Comput Civ Eng. 31(4):04017001.
  • Ratajczak J, Riedl M, Matt DT. 2019. BIM-based and AR Application combined with location-based management system for the improvement of the construction performance. Buildings. 9(5):118.
  • Ren G, Ding R, Li H. 2019. Building an ontological knowledgebase for bridge maintenance. Adv Eng Softw. 130:24–40. Construction safety training using immersive virtual reality
  • Sacks R, Perlman A, Barak R. 2013. Construction safety training using immersive virtual reality. Constr Manag Econ. 31(9):1005–1017.
  • Singh MM, Sawhney A, Borrmann A. 2015. Modular coordination and BIM: development of rule based smart building components. Procedia Eng. 123:519–527.
  • Svajlenka J, Kozlovska M. 2017. Modern method of construction based on wood in the context of sustainability. Civil Eng Environ Syst. 34(2):127–143.
  • Vaughan JL, Leming ML, Liu M, Jaselskis E. 2013. Cost-benefit analysis of construction information management system implementation: case study. J Constr Eng Manage. 139(4):445–455.
  • Vaghei R, Hejazi F, Taheri H, Jaafar MS, Aziz FNAA. 2017. Development of a new connection for precast concrete walls subjected to cyclic loading. Earthq Eng Eng Vib. 16(1):97–117.
  • Wang J, Zhang X, Shou W, Wang X, Xu B, Kim MJ, Wu P. 2015. A BIM-based approach for automated tower crane layout planning. Autom Constr. 59:168–178.
  • Wang Y, Yuan Z. 2017. Research on BIM-based assembly sequence planning of prefabricated buildings. ICCREM 2017 (pp. 10–17).
  • Wang Z, Hu H. 2017. Improved precast production–scheduling model considering the whole supply chain. J Comput Civ Eng. 31(4):04017013.
  • Wang Z, Hu H, Gong J. 2018. Framework for modeling operational uncertainty to optimize offsite production scheduling of precast components. Autom Constr. 86:69–80.
  • Willmann J, Knauss M, Bonwetsch T, Apolinarska AA, Gramazio F, Kohler M. 2016. Robotic timber construction—Expanding additive fabrication to new dimensions. Autom Constr. 61:16–23.
  • Wu P, Zhao X, Baller JH, Wang X. 2018. Developing a conceptual framework to improve the implementation of 3D printing technology in the construction industry. Arch Sci Rev. 61(3):133–142.
  • Wuest T, Irgens C, Thoben K-D. 2014. An approach to monitoring quality in manufacturing using supervised machine learning on product state data. J Intell Manuf. 25(5):1167–1180.
  • Xu G, Li M, Luo L, Chen CH, Huang GQ. 2019. Cloud-based fleet management for prefabrication transportation. Enterprise Inform Syst. 13(1):87–106.
  • Yao G, Wei F, Yang Y, Sun Y. 2019. Deep-learning-based bughole detection for concrete surface image. Adv Civ Eng. 2019:1–12.
  • Zhai Y, Fu Y, Xu G, Huang G. 2019. Multi-period hedging and coordination in a prefabricated construction supply chain. Int J Prod Res. 57(7):1949–1971.
  • Zhai Y, Zhong RY, Huang GQ. 2015. Towards operational hedging for logistics uncertainty management in prefabrication construction. IFAC-PapersOnLine. 48(3):1128–1133.
  • Zhai Y, Zhong RY, Li Z, Huang G. 2017. Production lead-time hedging and coordination in prefabricated construction supply chain management. Int J Prod Res. 55(14):3984–4002.
  • Zhao L, Liu Z, Mbachu J. 2019. Development of Intelligent Prefabs Using IoT Technology to Improve the Performance of Prefabricated Construction Projects. Sensors. 19(19):4131.
  • Zhang G, Sandanayake M. 2018. BIM and optimisation techniques to improve sustainability in green certification submission of construction projects. In The 7 World Construction Symposium
  • Zhong RY, Peng Y, Xue F, Fang J, Zou W, Luo H, Thomas Ng S, Lu W, Shen GQP, Huang GQ. 2017. Prefabricated construction enabled by the Internet-of-Things. Autom Constr. 76:59–70.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.