References
- Alaghbari W, Al-Sakkaf AA, Sultan B. 2019. Factors affecting construction labour productivity in Yemen. Int J Constr Manage. 19 (1):79–91.
- Chakrabortty RK, Sarker RA, Essam DL. 2017. Resource constrained project scheduling with uncertain activity durations. Comput Ind Eng. 112:537–550.
- Chen HL. 2018. Early prediction of project duration: a longitudinal study. Eng Manage J. 30(3):191–202.
- Chen WT, Huang YH. 2006. Approximately predicting the cost and duration of school reconstruction projects in Taiwan. Constr Manage Econ. 24(12):1231–1239.
- Cho B, Kim H, Kang L. 2015. Development of estimation model of construction activity duration using neural network theory. J Korea Acad-Ind Coop Soc. 16(5):3477–3483.
- Dawood N. 1998. Estimating project and activity duration: a risk management approach using network analysis. Constr Manage Econ. 16(1):41–41.
- Director General, CPWD. 2019. Analysis of Rates 2019. Vol. 1. A Government of India Publication. New Delhi: CPWD.
- Durdyev S, Ismail S, Kandymov N. 2018. Structural equation model of the factors affecting construction labor productivity. J Constr Eng Manage. 144(4):04018007.
- Durdyev S, Omarov M, Ismail S. 2017. Causes of delay in residential construction projects in Cambodia. Cogent Eng. 4(1):1–12.
- El-Dash KMM, Ramadan OMO, Youssef WMMA. 2019. Duration prediction models for construction projects in middle east. Eng Technol Appl Sci Res. 9(2):3924–3932.
- El-Gohary KM, Aziz RF. 2014. Factors influencing construction labor productivity in Egypt. J Manage Eng. 30(1):1–9.
- Enshassi A, Mohamed S, Mustafa ZA, Mayer PE. 2007. Factors affecting labour productivity in building projects in the Gaza strip. J Civil Eng Manage. 13(4):245–254.
- Galloway PD. 2006. Survey of the construction industry relative to the use of CPM scheduling for construction projects. J Constr Eng Manage. 132(7):697–711.
- Golabchi A, Han SU, AbouRizk S, Kanerva J. 2016. Micro-motion level simulation for efficiency analysis and duration estimation of manual operations. Autom Constr. 71(Part 2):443–452.
- Guo SJ, Chen JH, Chiu CH. 2017. Fuzzy duration forecast model for wind turbine construction project subject to the impact of wind uncertainty. Autom Constr. 81:401–410.
- Gupta M, Hasan A, Jain AK, Jha KN. 2018. Site amenities and workers’ welfare factors affecting workforce productivity in Indian construction projects. J Constr Eng Manage. 144(11):04018101.
- Hajdu M, Bokor O. 2016. Sensitivity analysis in PERT networks: does activity duration distribution matter? Autom Constr. 65:1–8.
- Hamza M, Shahid S, Bin Hainin MR, Nashwan MS. 2019. Construction labour productivity: review of factors identified. Int J Constr Manage. DOI: 10.1080/15623599.2019.1627503.
- Hiyassat MA, Hiyari MA, Sweis GJ. 2016. Factors affecting construction labour productivity: a case study of Jordan. Int J Constr Manage. 16(2):138–149.
- Jarkas AM. 2010. Buildability factors influencing formwork labour productivity of walls. Int J Constr Manage. 10(4):101–117.
- Jarkas AM. 2015. Factors influencing labour productivity in Bahrain’s construction industry. Int J Constr Manage. 15(1):94–108.
- Jarkas AM, Al Balushi RA, Raveendranath PK. 2015. Determinants of construction labour productivity in Oman. Int J Constr Manage. 15(4):332–344.
- Kanoglu A, Sezgin Y. 2004. Solution to the problem of inaccurate duration-estimation: relational database model for design/build organizations. Architect Sci Rev. 47(3):263–274.
- Korytkowski P, Malachowski B. 2019. Competence-based estimation of activity duration in IT projects. Eur J Oper Res. 275(2):708–720.
- Lee HS, Shin JW, Park M, Ryu HG. 2009. Probabilistic duration estimation model for high-rise structural work. J Constr Eng Manage. 135(12):1289–1298.
- Leu S, Chen A, Yang C. 2001. A GA-based fuzzy optimal model for construction time ± cost. Int J Project Manage. 19(1):47–58.
- Li H, Demeulemeester E. 2016. A genetic algorithm for the robust resource leveling problem. J Sched. 19(1):43–60.
- Li X, Chow KH, Zhu Y, Lin Y. 2016. Evaluating the impacts of high-temperature outdoor working environments on construction labor productivity in China: a case study of rebar workers. Build Environ. 95:42–52.
- Marzoughi F, Arthanari T, Askarany D. 2018. A decision support framework for estimating project duration under the impact of weather. Autom Constr. 87:287–296.
- Mohamed AN. 2001. Knowledge based approach for productivity adjusted construction schedule. Expert Syst Appl. 21(2):87–97.
- Mojahed S, Aghazadeh F. 2008. Major factors influencing productivity of water and wastewater treatment plant construction: evidence from the deep south USA. Int J Project Manage. 26(2):195–202.
- PMBOK. 2012. A guide to the project management body of knowledge (PMBOK® Guide). 5th ed. Newtown Square, PA: Project Management Institute.
- Rezakhani P, Maghiar M. 2019. Fuzzy analytical solution for activity duration estimation under uncertainty. J Risk Uncertain Eng Syst A: Civil Eng. 5(4):04019014.
- Selvam G, Madhavi Tadepalli TCh. 2019. Genetic algorithm based optimization for resource leveling problem with precedence constrained scheduling. Int J Constr Manage. DOI: 10.1080/15623599.2019.1641891.
- Soekiman A, Pribadi KS, Soemardi BW, Wirahadikusumah RD. 2011. Factors relating to labor productivity affecting the project schedule performance in Indonesia. Procedia Eng. 14:865–873.
- Warburton RDH, Cioffi DF. 2016. Estimating a project’s earned and final duration. Int J Project Manage. 34(8):1493–1504.