416
Views
2
CrossRef citations to date
0
Altmetric
Articles

Integrated lean concepts and continuous/discrete-event simulation to examine productivity improvement in door assembly-line for residential buildings

, , &

References

  • AbouRizk SM, Hajjar D. 1998. A framework for applying simulation in construction. Can J Civ Eng. 25(3):604–617.
  • Arbulu RJ, Ballard G, Harper N. 2003. Kanban in construction. Proceedings of the 11th Annual Conference of the International Group for Lean Construction; Blacksburg, VA; pp. 16–17.
  • Ballard G. 1993. Lean construction and EPC performance improvement. Proceedings of the 1st Annual Meeting of the International Group for Lean Construction; Aug.; Espoo, Finland; pp. 79–91.
  • Bamana F, Lehoux N, Cloutier C. 2019. Simulation of a construction project: assessing impact of just-in-time and lean principles. J Constr Eng Manage. 145(5):05019005.
  • Banawi A, Bilec M. 2014. A framework to improve construction processes: integrating lean, green and six sigma. Int J Constr Manage. 14(1):45–55.
  • Dennis P. 2002. Lean production simplified: a plain language guide to the world's most powerful production system. New York: Productivity Press.
  • Ekyalimpa R, AbouRizk SM, Farrar J. 2012. Effective strategies for simulating one-of-a-kind construction projects. Proceedings of the 2012 Winter Simulation Conference; Dec. 9–12; Berlin, Germany.
  • El Sakka F, Eid K, Narciss T, Hamzeh F. 2016. Integrating lean into modular construction: a detailed case study of Company X. Proceedings of the 24th Annual Conference of the International Group for Lean Construction; Jul. 20–22; Boston, MA; pp. 23–32.
  • Farrar JM, AbouRizk SM, Mao X. 2004. Generic implementation of lean concepts in simulation models. Lean Constr J. 1(1):1–23.
  • Hassan K, Kajiwara H. 2013. Application of pull concept-based lean production system in the ship building industry. J Ship Prod Des. 29(3):105–116.
  • Henderson T, Lainiotis D. 1970. Application of state-variable techniques to optimal feature extraction: multichannel analog data. IEEE Trans Inform Theory. 16(4):396–406.
  • Jeong JG, Hastak M, Syal M. 2006. Supply chain simulation modeling for the manufactured housing industry. J Urban Plann Dev. 132(4):217–225.
  • Koskela L. 2000. An exploration towards a production theory and its application to construction. Espoo, Finland: VVT, Technical Research Centre of Finland.
  • Koskela L. 1992. Application of the new production philosophy to construction. Technical Rep. Stanford, CA: Center for Integrated Facility Engineering, Dept. of Civil Engineering, Stanford University.
  • Kurdve M, Hildenbrand J, Jönsson C. 2018. Design for green lean building module production: case study. Proc Manuf. 25:594–601.
  • Liker JK. 2004. The Toyota way: 14 management principles from the world's greatest manufacturer. New York: McGraw-Hill.
  • Liker JK, Morgan JM. 2006. The Toyota way in services: the case of lean product development. Acad Manage Perspect. 20(2):5–20.
  • Mehrotra N, Syal M, Hastak M. 2005. Manufactured housing production layout design. J Archit Eng. 11(1):25–34.
  • Monden Y. 1993. Toyota production system: an integrated approach to just-in-time. Norcross, GA: Industrial Engineering and Management Press.
  • Nee LS, Juin GW, Yan FJ, Theng CY, Kamaruddin S. 2012. Lean production in manual assembly line A case study. Proceedings of the 2012 IEEE Symposium on Humanities, Science and Engineering Research; Jun. 24–27; Kuala Lumpur, Malaysia.
  • Oliveira J, Sá JC, Fernandes A. 2017. Continuous improvement through "lean tools": an application in a mechanical company. Proc Manuf. 13:1082–1089.
  • Salem O, Solomon J, Genaidy A, Minkarah I. 2006. Lean construction: from theory to implementation. J Manage Eng. 22(4):168–175.
  • Senghore O, Hastak M, Abdelhamid TS, AbuHammad A, Syal MG. 2004. Production process for manufactured housing. J Constr Eng Manage. 130(5):708–718.
  • Sundar R, Balaji AN, Kumar RS. 2014. A review on lean manufacturing implementation techniques. Proc Eng. 97:1875–1885.
  • Tapping D, Luyster T, Shuker T. 2002. Value stream management: eight steps to planning, mapping, and sustaining lean improvements. New York: Productivity.
  • Yu H, Al-Hussein M, Al-Jibouri S, Telyas A. 2013. Lean transformation in a modular building company: a case for implementation. J Manage Eng. 29(1):103–111.
  • Yu H, Al-Hussein M, Nasseri R. 2007. Process flowcharting and simulation of house structure components production process. Proceedings of the 2007 Winter Simulation Conference; Dec. 9–12; Washington, DC.
  • Zhang X, Azhar S, Nadeem A, Khalfan M. 2018. Using building information modelling to achieve lean principles by improving efficiency of work teams. Int J Constr Manage. 18(4):293–300.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.