References
- Ahuja HN, Nandakumar V. 1984. Enhancing reliability of project duration forecasts. In Transactions of the American Association of Cost Engineers.
- Akinci B, Fischer M, Kunz J. 2002. Automated generation of work spaces required by construction activities. J Constr Eng Manage. 128(4):306–306.
- Akinci B, Fischer M, Zabelle T. 1998. Proactive approach for reducing non-value adding activities due to time-space conflicts. In 8th Annual Conference of the International Group for Lean Construction; p. 16.
- Andayesh M, Sadeghpour F. 2015. The constructs of site layout modeling: an overview. Can J Civ Eng. 42(3):199–212.
- Berg BL. 2009. Chapter 4: A dramaturgical look at interviewing. In Qualitative research methods for the social sciences. 7th ed. Boston: Allyn & Bacon; p. 101–157.
- BrandSafway. 2018a. SystemsTM Scaffold | Product Selection Guide. Brand industrial Service, Inc. https://brandsafway.com/systems-scaffold-supported-scaffolding-systems.
- BrandSafway. 2018b. Tube & Clamp Scaffold | Product Selection Guide. Brand industrial Service, Inc. https://brandsafway.com/tube-and-clamp-scaffold-supported-scaffolding-systems.
- Catari. 2016. Catari US® multidirectional scaffold system | solutions holding your ideas. http://www.catarigroup.com/en/universalsystem.html.
- Charmaz KC. 2006. Coding in grounded theory practice. In Constructing grounded theory: a practical guide through qualitative analysis. 1st ed. London: SAGE Publications; p. 42–71.
- Chavada R, Dawood N, Kassem M. 2012. Construction workspace management: the development and application of a novel nd planning approach and tool. J Inf. Technol. Constr. 17, 213–236. http://www.itcon.org/2012/13.
- Chini A, Genauer G. 1997. Technical guidance available to designers of temporary structures. In ASCE structures congress XV. Portland, OR: Construction Industry Institute (CII); p. 979–984.
- CII. 2006. Constructability Implementation (Best Practice). https://www.construction-institute.org/resources/knowledgebase/best-practices/constructability/topics/rt-034.
- CII. 2015. Validating advanced work packaging as a best practice – a game changer. Austin, TX: Construction Industry Institute.
- CII & COAA. 2013. Advanced work packaging: implementation guidance (Vol. II). Austin, TX: Construction Industry Institute. https://www.bentley.com/en/solutions/advanced-work-packaging.
- Creswell JW. 2013. Qualitative inquiry and research design: choosing among five approaches. 3rd ed. Thousand Oaks, CA: SAGE Publications.
- DSS. 2019. System scaffold catalog. www.dss.net.
- El-Rayes K, Khalafallah A. 2005. Trade-off between safety and cost in planning construction site layouts. J Constr Eng Manage. 131(11):1186–1195.
- Gao T, Ergan S, Akinci B, Garrett JH. 2014. Proactive productivity management at job sites: understanding characteristics of assumptions made for construction processes during planning based on case studies and interviews. J Constr Eng Manage. 140(3):04013054.
- Generation. 2017. Scaffolding products. https://www.generationscaffolding.com/en-gb/scaffolding-products/.
- German Institute for Standardisation. 2004. DIN EN 12810-1: |Facade scaffolds made of prefabricated components - Part 1: Products specifications (2004). Germany. https://www.en-standard.eu/din-en-12810-1-facade-scaffolds-made-of-prefabricated-components-part-1-products-specifications/.
- Guo SJ. 2002. Identification and resolution of work space conflicts in building construction. J Constr Eng Manage. 128(4):287–295.
- Haase J. 1995. Research design: qualitative & quantitative approaches. Nurs Res. 44(6):381. DOI: 10.1097/00006199-199511000-00011.
- Huang T, Kong CW, Guo HL, Baldwin A, Li H. 2007. A virtual prototyping system for simulating construction processes. Autom Constr. 16(5):576–585.
- Kim H, Ahn H. 2011. Temporary facility planning of a construction project using BIM (building information modeling). Congress on Computing in Civil Engineering, Proceedings.
- Kim J, Fischer M, Kunz J, Levitt R. 2015. Semiautomated scaffolding planning: development of the feature lexicon for computer application. J Comput Civ Eng. 29(5):04014079.
- Kim K, Cho Y, Zhang S. 2016. Integrating work sequences and temporary structures into safety planning: automated scaffolding-related safety hazard identification and prevention in BIM. Autom Constr. 70:128–142.
- Kim K, Teizer J. 2014. Automatic design and planning of scaffolding systems using building information modeling. Adv Eng Inf. 28(1):66–80.
- Kumar C, AbouRizk SM, Mohamed Y, Taghaddos H, Hermann U. 2013. Estimation and planning tool for industrial construction scaffolding. In International Association for Automation and Robotics in Construction (IAARC).
- Kuntz KA, Sanvido VE. 1995. Construction Crew Evaluation Model to improve productivity. In ASCE Construction Congress Proceedings. ASCE; p. 201–208.
- Layher. 2014. Heavy duty support scaffolding and scaffold towers. https://layherna.com/scaffold-products/scaffold-towers/.
- Mawdesley MJ, Al-Jibouri SH, Yang H. 2002. Genetic algorithms for construction site layout in project planning. J Constr Eng Manage. 128(5):418–426.
- Maxwell JA. 2013. Qualitative research design: an interactive approach. 3rd ed. Thousand Oaks, CA: SAGE Publications.
- Moustakas C. 1994. Phenomenological research methods. Thousand Oaks, California.
- Neuman WL. 2014. Social research methods: qualitative and quantitative approaches. 7th ed. Essex, England: Pearson.
- O’Connor J. 2006. Constructability implementation guide. 2nd ed. Austin, TX: Construction Industry Institute; p. 1–154.
- Oglesby CH, Parker HW, Howell GA. 1989. Productivity improvement in construction. New York, NY: McGraw Hill.
- OSHA. 2002. A guide to scaffold use in the construction industry. https://www.osha.gov/Publications/osha3150.pdf.
- OSHA. 2017. Scaffolding eTool. https://www.osha.gov/SLTC/etools/scaffolding/index.html.
- Patricia C. 2005. Lessons learned practices in the engineering, procurement and construction sector. Eng Constr Archi Manag. 12(3):236–250.
- PERI. 2016. PERI integrated scaffold program.
- PERI. 2018. Accessories for in-situ concrete. https://www.peri-usa.com/concrete-components-overview.html.
- PERI. 2019. Scaffolding and shoring. https://www.peri-usa.com/products/applications/scaffolding.html.
- Polkinghorne DE. 1989. Phenomenological research methods. In Existential-phenomenological perspectives in psychology: exploring the breadth of human experience. New York, NY, US: Plenum Press; p. 41–60.
- Rad P. 1980. Analysis of working space congestion from scheduling data. In American association of cost engineers transactions, Vol. 24, Morgantown, WV: American Association of Cost Engineers; p. F4.1–F4.5.
- Ratay R. 1987. Temporary structures in construction operations. In Proceedings of a session sponsored by the construction division of the American Society of Civil Engineers in conjunction with the ASCE convention in Atlantic City; p. 1–8.
- Ratay RT. 2004. Temporary structures in construction – USA practices. Struct Eng Int. 14(4):292–295.
- Riley D, Sanvido V. 1997. Space planning for mechanical, electrical, plumbing and fire protection trades in multi-story building construction. In 1997 5th ASCE Construction Congress. Minneapolis, MN: ASCE; p. 8.
- Ryan G. 2017. Even more schedule for sale: advanced work packaging for construction projects. Bloomington, IN: AuthorHouse.
- Sanders SR, Thomas HR, Smith GR, Mannering FL. 1989. An analysis of factors affecting labor productivity in masonry construction. University Park, PA: Pennsylvania State University.
- Scaffolding Shoring Forming Institute, & Scaffold & Access Industry Association. 2016. Code of Safe Practice for Scaffolds. https://www.saiaonline.org/suspendedscaffolds.
- Tommelein ID, Levitt RE, Roth-Hayes B. 1992. Site-layout modelling: how can artificial intelligence help? J Constr Eng Manag. 118(3):594–611.
- Wang P, AbouRizk SM. 2009. Large-scale simulation modeling system for industrial construction. Can J Civ Eng. 36(9):1517–1529.