924
Views
4
CrossRef citations to date
0
Altmetric
Articles

Influence of lean construction wastes on the transformation-flow-value process of construction

, &

References

  • Alwi S, Hampson KD, Mohamed SA. 2002. Non value-adding activities in Australian construction projects. Proceedings of the International Conference on Advancement in Design, Construction, Construction Management and Maintenance of Building Structures; Mar 27–28 2003. Bali, Indonesia: RIHS, p. 270–280.
  • Bajjou MS, Chafi A. 2018. Investigation into the critical sources of wastes influencing the performance of construction projects in Morocco. Proceedings of the Third International Conference on Smart Cities Applications; Oct 10–11; Tetouan, Morocco. Cham: Springer, p. 65–73.
  • Bajjou MS, Chafi A. 2020. Identifying and managing critical waste factors for lean construction projects. Eng Manage J. 32(1):2–13.
  • Bajjou MS, Chafi A, Ennadi A, El Hammoumi M. 2017. The practical relationships between lean construction tools and sustainable development: a literature review. J Eng Sci Technol Rev. 10(4):170–177.
  • Banawi A, Bilec MM. 2014. A framework to improve construction processes: integrating lean, green and six sigma. Int J Constr Manage. 14(1):45–55.
  • Barshani A, Abdelhamid TS, Syal M. 2004. Manufactured housing construction value using the analytical hierarchy process. In: Bertelsen S, Formoso CT, editors. Proceedings of the 12th Annual Conference of the International Group for Lean Construction; Aug 3–5; Helsingør, Denmark.
  • Bekr GA. 2014. Study of the causes and magnitude of wastage of materials on construction sites in Jordan. J Constr Eng. 2014:1–6.
  • Bertelsen S, Koskela L. 2002. Managing the three aspects of production in construction. In: Formoso CT, Ballard G, editors. Proceedings of the 10th Annual Conference of the International Group for Lean Construction; Aug 6–8; Gramado, Brazil, p. 13–22.
  • Bolviken T, Rooke J, Koskela L. 2014. The wastes of production in construction - a TFV based taxonomy. In: Kansas BT, Koskela L, Saurin TA, editors. Proceedings of the 22nd Annual Conference of the International Group for Lean Construction; Jun 25–27; Oslo, Norway, p. 811–822.
  • Chan APC, Darko A, Ameyaw EE, Owusu-Manu D-G. 2017. Barriers affecting the adoption of green building technologies. J Manage Eng. 33(3):1–12.
  • Choi S, Ku TH, Yeo DH, Han SH. 2008. Waste elimination of mucking process of a petroleum storage tunnel through the value stream analysis. In: Tzortzopoulos P, Kagioglou M, editors. Proceedings of the 16th Annual Conference of the International Group for Lean Construction; Jul 16–18; Manchester, UK, p. 155–167.
  • Cronbach LJ. 1951. Coefficient alpha and the internal structure of tests. Psychometrika. 16(3):297–334.
  • DeVellis RF. 2016. Scale development: theory and applications. Thousand Oaks (CA): Sage publications.
  • Enshassi A, Sundermeier M, Zeiter MA. 2017. Factors contributing to rework and their impact on construction projects performance. Int J Sustain Constr Eng Technol. 8(1):12–33.
  • Formoso C, Bã¸Lviken T, Rooke J, Koskela L. 2015. A conceptual framework for the prescriptive causal analysis of construction waste. In: Seppänen O, González VA, Arroyo, editors. Proceedings of the 23rd Annual Conference of the International Group for Lean Construction; Jul 29–31; Perth, Australia, p. 454–461.
  • Formoso CT, Santos A, Dos, Powell JA. 2002. An exploratory study on the applicability of process transparency in construction sites. J Construct Res. 03(01):35–54.
  • Formoso CT, Soibelman L, De Cesare C, Isatto EL. 2002. Material waste in the building industry: main causes and prevention. J Constr Eng Manage. 128(4):316–325.
  • Hamma-Adama M, Kouider T. 2019. What are the barriers and drivers toward BIM adoption in Nigeria? In: Miklós H, Mirosław S, editors. Creat Constr Conf; Jun 29–Jul 2; Budapest, Hungary. p. 529–539.
  • Han S, Lee S, Peña-Mora F. 2012. Identification and quantification of non-value-adding effort from errors and changes in design and construction projects. J Constr Eng Manage. 138(1):98–109.
  • Hwang B-G, Thomas SR, Haas CT, Caldas CH. 2009. Measuring the impact of rework on construction cost performance. J Constr Eng Manage. 135(3):187–198.
  • Ikau R, Joseph C, Tawie R. 2016. Factors influencing waste generation in the construction industry in Malaysia. Procedia Social Behav Sci. 234:11–18.
  • Javanmardi A, Abbasian-Hosseini SA, Liu M, Hsiang SM. 2018. Benefit of cooperation among subcontractors in performing high-reliable planning. J Manage Eng. 34(2):4017062.
  • Kaliannan S, Nagapan S, Abdullah AH, Sohu S, Jhatial AA. 2018. Determining root cause of construction waste generation: a global context. Civ Eng J. 4(11):2539–2547.
  • Khaleel T, Al-Zubaidy A. 2018. Major factors contributing to the construction waste generation in building projects of Iraq. In: MATEC Web Conf. Vol. 162. Proceedings of the 3rd International Conference on Buildings, Construction and Environmental Engineering, BCEE3-2017; Oct 23–25; Egypt, p. 1–6.
  • Khanh HD, Kim YS. 2014. Identifying causes for waste factors in high-rise building projects: a survey in Vietnam. KSCE J Civ Eng. 18(4):865–874.
  • Khanh HD, Kim SY. 2015. Development of waste occurrence level indicator in Vietnam construction industry. Eng Constr Arch Man. 22(6):715–731.
  • Koskela L. 1992. Application of the new production philosophy to construction. Center for Integrated Facility Engineering Technical Report #72. CA: Stanford University.
  • Koskela L. 2000. An exploration towards a production theory and its application to construction [Doctoral thesis]. Finland: Helsinki University of Technology.
  • Koskela L. 2004. Making do - the eighth category of waste. In: Bertelsen S, Formoso CT, editors. Proceedings of the 12th Annual Conference of the International Group for Lean Construction; Aug 3–5; Helsingør, Denmark.
  • Koskela L, Bølviken T, Rooke JA. 2013. Which are the wastes of construction? In: Formoso CT, Tzortzopoulos P, editor. Proceedings of the 21st Annual Conference of the International Group for Lean Construction; Aug; Fortaleza, Brazil, p. 3–12.
  • Koskela L, Howell G, Ballard G, Tommelein I. 2002. The foundations of lean construction. In: Best R, De Valence G, editors. Des Constr Build value. Oxford: Butterworth-Heinemann; p. 221–225.
  • Kpamma ZE, Adjei-Kumi T, Ayarkwa J, Adinyira E. 2018. Choosing by advantages incorporated framework for a user-involved design process. Archit Eng Des Manage. 14(3):194–217.
  • Kumar SS, Cheng JCP. 2015. A BIM-based automated site layout planning framework for congested construction sites. Autom Constr. 59:24–37.
  • Lapinski A, Horman M, Riley D. 2006. Lean processes for sustainable project delivery. J Constr Eng Manage. 132(10):1083–1091.
  • Liker J. 2004. The Toyota way: 14 management principles from the world’s greatest manufacturer. New York: McGraw-Hill.
  • Lindhard S, Wandahl S. 2014. Exploration of the reasons for delays in construction. Int J Constr Manage. 14(1):36–44.
  • Mao X, Zhang X. 2008. Construction process reengineering by integrating lean principles and computer simulation techniques. J Constr Eng Manage. 134(5):371–381.
  • Monden Y. 2011. Toyota production system: an integrated approach to just-in-time. 4th ed. New York: CRC Press.
  • Mossman A. 2009. Creating value: a sufficient way to eliminate waste in lean design and lean production. Lean Constr J. 13–23.
  • Nagapan S, Rahman IA, Asmi A. 2012. Factors contributing to physical and non-physical waste generation in construction industry. Int J Adv Appl Sci. 1(1):1–10.
  • Nahmens I, Ikuma LH. 2012. Effects of lean construction on sustainability of modular homebuilding. J Archit Eng. 18(2):155–163.
  • Nahmens I, Mullens MA. 2011. Lean homebuilding: lessons learned from a precast concrete panelizer. J Archit Eng. 17(4):155–161.
  • Naoum S. 2012. Dissertation research and writing for construction students. 3rd ed. London: Routledge.
  • Ohno T. 1988. Toyota production system: beyond large-scale production. Portland (OR): Productivity Press.
  • Onungwa IO, Uduma-Olugu N. 2017. Building information modelling and collaboration in the Nigerian construction industry. J Constr Bus Manage. 1(2):1–10.
  • Rachid Z, Toufik B, Mohammed B. 2019. Causes of schedule delays in construction projects in Algeria. Int J Constr Manage. 19(5):371–381.
  • Sacks R, Koskela L, Dave B, Owen R. 2010. Interaction of lean and building information modeling in construction. J Constr Eng Manage. 136(9):968–980.
  • Sanni-Anibire MO, Mohamad Zin R, Olatunji SO. 2020. Causes of delay in the global construction industry: a meta analytical review. Int J Constr Manage. 1–13. DOI: 10.1080/15623599.2020.1716132.
  • Sarhan JG, Xia B, Fawzia S, Karim A. 2017. Lean construction implementation in the Saudi Arabian construction industry. Constr Econ Build. 17(1):46–69.
  • Shingo S. 1988. Non-stock production: the Shingo system of continuous improvement. Portland (OR): Productivity Press.
  • Turner & Townsend. 2019. International Construction Market Survey 2019. [accessed 2019 Aug 24]. http://www.infrastructure-intelligence.com/sites/default/files/article_uploads/Turner Townsend International Construction Market Survey 2019.pdf.
  • Viana DD, Formoso CT, Kalsaas BT. 2012. Waste in construction: a systematic literature review on empirical studies. In: Tommelein ID, Pasquire CL, editors. Proceedings of the 20th Annual Conference of the International Group for Lean Construction; Jul 18–20; San Diego, USA.
  • Womack J, Jones D. 2003. Lean thinking: banish waste and create wealth in your corporation. 2nd ed. New York: Free Press.
  • Zhao ZY, Lv QL, Zuo J, Zillante G. 2010. Prediction system for change management in construction project. J Constr Eng Manage. 136(6):659–669.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.