1,340
Views
9
CrossRef citations to date
0
Altmetric
Articles

The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders

, , , &

References

  • Abdulaal B, Bouferguene A. 2017. Benchmark Alberta' s architectural, engineering and construction industry knowledge of building information modelling (BIM). Can J Civ Eng. 67:1–34.
  • AIA. 2012. Integrated project delivery: a guide. [accessed 2012 Jan 10]. www.aia.org/contractdocs/AIA. S07 7630.
  • Akinade OO, Oyedele LO, Bilal M, Ajayi SO, Owolabi HA, Alaka HA, Bello, SA. 2015. Resources, conservation and recycling waste minimisation through deconstruction: a BIM based Deconstructability Assessment Score (BIM-DAS). Resour Conserv Recycl. 105:167–176. https://doi.org/10.1016/j.resconrec.2015.10.018.
  • Al-Nassar F, Ruparathna R, Chhipi-Shrestha G, Haider H, Hewage K, Sadiq R. 2016. Sustainability assessment framework for low rise commercial buildings: life cycle impact index-based approach. Clean Techn Environ Policy. 18(8):2579–2590.
  • Arno S, Frank T. 2008. Building information model based energy/exergy performance assessment in early design stages. Autom Constr. 18 :153–163.
  • Badi S, Diamantidou D. 2017. A social network perspective of building information modelling in Greek construction projects. Architect Eng Des Manage. 13(6):406–422.
  • Bakchan A, Faust KM, Leite F. 2019. Seven-dimensional automated construction waste quantification and management framework: integration with project and site planning. Resour Conserv Recycl. 146:462–474.
  • Barrie DS, Paulson BC. 1992. Professional construction management. In: McGraw-Hill Series in Construction Engineering and Project Management. 3rd ed. New York: McGraw-Hill.
  • Bossink BAG, Brouwers HJH. 1996. Construction waste: quantification and source evaluation. J Constr Eng Manage. 122(1):55–60.
  • Bruno S, De Fino M, Fatiguso F. 2018. Historic building information modelling: performance assessment for diagnosis-aided information modelling and management. Autom Constr. 86:256–276.
  • CCME. 2014. Current priorities. [accessed 2018 Jun 30]. https://www.ccme.ca/en/current_priorities/waste/waste/crd-waste.html.
  • Chandrakanthi M, Hettiaratchi P, Prado B, Ruwanpura JY. 2002. Optimization of the waste management for construction projects using simulation. Proceedings of the 2002 Winter Simulation Conference, Institute of Electrical and Electronics Engineers Inc, San Diego (CA); p. 1771–1777.
  • Chang C. 1990. Applying R&D project dynamics to construction management, AIT Research No. IE-90-1. Bangkok (Thailand): Asian Institute of Technology.
  • Chritamara S, Ogunlana SO, Bach NL. 2002. System dynamics modeling of design and build construction projects. Constr Innov. 2(4):269–295.
  • Chen X, Liu YS. 2016. The construction of the coordinated dynamic model of owners' integrated management organization of governmental non-profitable investment projects. J Discrete Math Sci Cryptogr. 19(3):663–676.
  • Chhipi-Shrestha G, Hewage K, Sadiq R. 2017a. Impacts of neighborhood densification on water-energy-carbon nexus: investigating water distribution and residential landscaping system. J Cleaner Prod. 156:786–795.
  • Chhipi-Shrestha G, Hewage K, Sadiq R. 2017b. Water–energy–carbon nexus modeling for urban water systems: system dynamics approach. J Water Resour Plann Manage. 143(6):04017016.
  • Cooper KG. 1993. The rework cycle… How it really works… and reworks… PMNetwork magazine. Project Management Journal, USA.
  • CURT. 2004. Collaboration, integrated information, and the project lifecycle in building design. Construction Users Roundtable, Construction and Operation, August (2004), P16 United States.
  • De Marco A, Rafele C, Thaheem MJ. 2016. Dynamic management of risk contingency in complex design-build projects. J Constr Eng Manage. 142(2):04015080.
  • Du L, Li X, Zhao H, Ma W, Jiang P. 2018. System dynamic modeling of urban carbon emissions based on the regional national economy and social development plan: a case study of Shanghai city. J Cleaner Prod. 172:1501–1513.
  • Eastman C, Teicholz P, Sacks R, Liston K. 2008. BIM handbook: a guide to building information modeling for owners, managers, designers, engineers, and contractors. Hoboken (NJ): John Wiley & Sons, Inc.
  • Edirisinghe R, London KA, Kalutara P, Aranda-Mena G. 2017. Building information modelling for facility management: are we there yet? Eng, Const Arch Man. 24(6):1119–1154.
  • Ekanayake EL, Ofori G. 2004. Building waste assessment score: design-based tool. Building Environ. 39(7):851–861.
  • Ford DN, Sterman JD. 1998. Dynamics modeling of product development process. Syst Dyn Rev. 14(1):31–68.
  • Formoso CT, Isatto EL, Hitomi H. 1999. Method for waste control in the building industry. Proceedings IGLC-7, 7th Conference of the International Group for Lean Construction, Berkeley, CA.
  • Forrester JM. 1958. Industrial dynamics: a major breakthrough for design makers. Harv Bus Rev. 26 (4) :37–66.
  • Goedert JD, Meadati P. 2008. Integrating construction process documentation into building information modelling. J Constr Eng Manage. 134(7):509–516.
  • GSA. 2012. Bidding on federal construction projects. U.S. General Service Administration [accessed March 2012]. http://www.gsa.gov/portal/content/103328.
  • Guerra BC, Bakchan A, Leite F, Faust KM. 2019. BIM-based automated construction waste estimation algorithms: the case of concrete and drywall waste streams. Waste Manage. 87:825–832.
  • Hamid-Abdel T. 1989. The dynamics of software project staffing. A system dynamics based simulation approach. IEEE Trans Softw Eng. 15(2):109–119.
  • Ibbs CW, Kwak YH, Ng T, Odabasi AM. 2003. Project delivery systems and project change: quantitative analysis. J Constr Eng Manage. 129(4):382–387.
  • Jalaei F, Zoghi M, Khoshand A. 2019. Life cycle environmental impact assessment to manage and optimize construction waste using Building Information Modeling (BIM). Int J Constr Manage. 19:1–18. https://doi.org/10.1080/15623599.2019.1583850.
  • Kamali M, Hewage K. 2017. Development of performance criteria for sustainability evaluation of modular versus conventional construction methods. J Cleaner Prod. 142:3592–3606.
  • Kangari R, Riggs LS. 1989. Construction risk assessment by linguistics. IEEE Trans Eng Manage. 36(2):126–131.
  • Karamouz M, Goharian E, Nazif S. 2012. Development of a reliability based dynamic model of urban water supply system: a case study. Proceedings of the World Environmental and Water Resources Congress 2012: Crossing Boundaries; p. 2067–2078. https://doi.org/10.1061/9780784412312.208
  • Kim Y-C, Hong W-H, Park J-W, Cha G-W. 2017. An estimation framework for building information modeling (BIM)-based demolition waste by type. Waste Manag Res. 35(12) :1285–1295.
  • Kollikkathara N, Feng H, Yu D. 2010. A system dynamic modeling approach for evaluating municipal solid waste generation, landfill capacity and related cost management issues. Waste Manage. 30(11):2194–2203.
  • Koutamanis A. 2017. Briefing and building information modelling: potential for integration. Int J Architect Comput. 15(2):119–133.
  • Mohammed AB. 2019. Applying BIM to achieve sustainability throughout a building life cycle towards a sustainable BIM model. Int J Constr Manage. 0(0):1–18.
  • Napier T. 2016. Construction waste management. [accessed 2020 March 27]. https://www.wbdg.org/resources/construction-waste-management.
  • Lee S, Peña-Mora F, Park M. 2003. Dynamic quality and change management framework for con-current design and construction. ASCE Construction Research Congress. Honolulu (HI): ASCE (Electronic Book).
  • Lim J. 1994. Management of civil engineering design project: a system dynamics model [AIT Thesis No ST-94-10]. Bangkok (Thailand): Asian Institute of Technology.
  • Liu Z, Osmani M, Demian P, Baldwin AN. 2011. The potential use of BIM to aid construction waste minimization. Proceedings of the CIB W78-W102 2011: International Conference – Sophia Antipolis, France; p. 26–28.
  • Love PED, Edwards DJ, Han S, Goh YM. 2011. Design error reduction: toward the effective utilization of building information modeling. Res Eng Design. 22(3):173–187.
  • Love PED, Mandal P, Smith J, Li H. 2000. Modeling the dynamics of design error induced rework in construction. Constr Manage Econ. 18(5):567–574.
  • Lyneis MJ, Cooper KG, Els SA. 2001. Strategic management of complex projects: a case study using system dynamics. Syst Dyn Rev. 17(3):237–260.
  • Lyneis MJ, Ford DN. 2007. System dynamics applied to project and management. Syst Dyn Rev. 23(2-3):157–189.
  • Maryani A, Wignjosoebroto S, Partiwi SG. 2015. A system dynamics approach for modeling construction accidents. Procedia Manuf. 4:392–401.
  • Mitchell WJ. 2005. Construction complexity. In: Martens B, Brown A, editors. Computer aided architectural design futures. 1st ed. Springer Netherlands; p. 41–50.
  • NBS. 2012. National BIM report, building information modeling. The National BIM Library [accessed 2012 Feb 03]. www.thenbs.com/corporate/about.asp.
  • Nepal MP, Zhang J, Webster A, Staub-French S, Pottinger R, Lawrence M. 2009. Querying IFC-based building information models to support construction management function. In: Construction Research Congress, ASCE, Seattle, Washington; p. 506–515.
  • Ogunlana S, Lim J, Saeed K. 1998. DESMAN: a dynamic model for managing civil engineering projects. Comput Struct. 67 (5):401–419.
  • Osmani M. 2013. Design waste mapping: a project lifecycle approach. Proc ICE Waste Resour Manage. 166(3):114–127.
  • Park M. 2005. Model-based dynamic resource management for construction projects. Autom Constr. 14(5):585–598.
  • PCCBC. 1998. Procedures and guidelines recommended for use on publically-funded construction projects. Produced by the Public Construction Council of British Columbia [accessed 2012 Mar 15]. www.pccbc.com/.
  • Popov V, Juocevicius V, Migilinskas D, Ustinovichius L, Mikalauskas S. 2010. The use of virtual building design and construction model for developing an effective project concept in 5D environment. Autom Constr. 19(3):357–367.
  • Porwal A. 2013. Construction waste management at source: a building information modelling based system dynamics approach [PhD dissertation]. Faculty of Graduate Studies, University of British Columbia.
  • Porwal A, Hewage KN. 2012. Building information modeling–based analysis to minimize waste rate of structural reinforcement. J Constr Eng Manage. 138(8):943–954.
  • RCD. 2013. RSMeans. Reed Construction Data Inc.
  • Richardson GP, Pugh AL. 1981. Introduction to system dynamics modelling with DYNAMO. Cambridge (MA): MIT.
  • Robert JC. 1998. The role of system dynamics in understanding the impact of changes to key project personnel on design production within construction projects. Int J Project Manage. 16 (4):235–247.
  • Rodrigues AG, Williams TM. 1998. System dynamics in project management: assessing the impacts of client behavior on project performance. J Oper Res Soc. 49(1):2–15.
  • Ruparathna R. 2013. Emergy based procurement framework to improve sustainability performance in construction [Masters dissertation]. Faculty of Graduate Studies, University of British Columbia.
  • Ruparathna R, Hewage K. 2015. Review of contemporary construction procurement practices. J Manage Eng. 31(3):04014038.
  • Ruwanpura J, Prado B, Hettiaratchi P. 2003. A computer simulation model to predict waste generation and promote sustainable construction practices at construction sites. Canadian Society for Civil Engineering – 31st Annual Conference: 2003 Building our Civilization, June 4, 2003–June 7, Canadian Society for Civil Engineering, Moncton, NB, Canada; p. 499–508.
  • Sacks R, Eastman C, Lee G, Teicholz P. 2018. BIM handbook: a guide to building information modeling for owner, managers, designers, engineers, and contractors. 3rd ed. Hoboken (NJ): Wiley Publishing.
  • Singh MM, Sawhney A, Borrmann A. 2019. Integrating rules of modular coordination to improve model authoring in BIM. Int J Constr Manage. 19(1):15–31.
  • Song S, Yang J, Kim N. 2012. Development of a BIM-based structural framework optimization and simulation system for building construction. Comput Indus. 63(9):895–912. https://doi.org/10.1016/j.compind.2012.08.013.
  • Srijariya W, Riewpaiboon A, Chaikledkaew U. 2008. System dynamic modeling: an alternative method for budgeting. Value Health. 11:S115–S123.
  • Sterman JD. 1992. System dynamic modelling for project management. Cambridge (MA): Massachusetts Institute of Technology.
  • TBR. 1982. The business roundtable, measuring productivity in construction. A-1 Report of the Construction Industry Cost Effectiveness Project, New York, NY.
  • Teo MMM, Loosemore M. 2001. A theory of waste behaviour in the construction industry. Constr Manage Econ. 19(7):741–751.
  • Wan SKM, Kumaraswamy MM, Liu DTC. 2009. Contributors to construction debris from electrical and mechanical work in Hong Kong infrastructure projects. J Constr Eng Manage. 135 (7):637–646.
  • Wang L, Kunc M, Bai S. j. 2017. Realizing value from project implementation under uncertainty: an exploratory study using system dynamics. Int J Project Manage. 35(3):341–352.
  • WBDG. 2010. Design guidance. Whole Building Design Guide, National Institute of Building Sciences [accessed 2012 Feb 16]. www.wbdg.org/design/.
  • Won J, Cheng JCP. 2017. Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization. Automat Constr. 79:3–18.
  • Won J, Cheng JCP, Lee G. 2016. Quantification of construction waste prevented by BIM-based design validation: case studies in South Korea. Waste Manage. 49:170–180.
  • WRAP. 2013. Civil engineering projects: waste less and save money. Material change for a better environment, England [accessed 2013 May 08]. www.wrap.org.uk.
  • Xia B, Chan A. 2012. Measuring complexity for building projects: a Delphi study. Eng Constr Arch Man. 19(1):7–24.
  • Xu J, Shi Y, Xie Y, Zhao S. 2019. A BIM-based construction and demolition waste information management system for greenhouse gas quantification and reduction. J Clean Prod. 229:308–324. https://doi.org/10.1016/j.jclepro.2019.04.158.
  • Yuan H, Chini AR, Lu Y, Shen L. 2012. A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste. Waste Manage. 32(3):521–531.
  • Yun S, Jun K, Son C, Kim S. 2014. Preliminary study for performance analysis of BIM-based building construction simulation system. KSCE J Civ Eng. 18(2):531–540. https://doi.org/10.1007/s12205-014-0174-2.
  • Zhang H, Zhang X, Zhang B. 2009. System dynamics approach to urban water demand forecasting: a case study of Tianjin. Trans Tianjin Univ. 15(1):70–74.
  • Zhang X, Wu Y, Shen L, Skitmore M. 2014. A prototype system dynamic model for assessing the sustainability of construction projects. Int J Project Manage. 32(1):66–76.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.