References
- Abdelmageed S, Zayed T. 2020. A study of literature in modular integrated construction-critical review and future directions. J Cleaner Prod. 277:124044.
- Azhar S, Lukkad MY, Ahmad I. 2012. Modular v. Stick-Built construction: identification of critical decision-making factors. In ASC Proceedings of the 48th Annual Conference Fort Collins, CO: Associated Schools of Construction.
- Barista D. 2019. Contractor Giants are all in on offsite construction. Building Design & Construction. Retrieved from https://www.bdcnetwork.com/contractor-giants-are-all-offsite-construction.
- BBR Holdings (S) Ltd 2014, July 3. BBR secures S$196 million contract to construct green Halls of Residence at Nanyang Technological University. TECTUS group. http://www.tectusgroup.com/news-center/announcements/news/bbrholding-singapore/bbr-secures-s196-million-contract-to-construct-green-halls-ofresidence-at-nanyang-technological-university/.
- Bertram N, Fuchs S, Mischke J, Palter R, Strube G, Woetzel J. 2019. Modular construction: From projects to products. New York: McKinsey & Company.
- BESA 2015. An Offsite Guide for the Building and Engineering Services Sector. The Building and Engineering Services Association. https://www.buildoffsite.com/content/uploads/2016/01/OffsiteGuide.pdf.
- Block I. 2019, July 2. World's tallest modular tower is now clement canopy in Singapore. Dezeen. https://www.dezeen.com/2019/07/02/clementcanopy-worlds-tallest-modular-tower-bouygues/.
- Caulfield J. 2016, February 5. Asia’s modular miracle. Building Design & Construction. https://www.bdcnetwork.com/asia%E2%80%99smodular-miracle.
- Choi JO. 2014. Links between modularization critical success factors and project performance [Doctoral dissertation]. The University of Austin at Texas.
- Choi JO, Chen XB, Kim TW. 2019. Opportunities and challenges of modular methods in dense urban environment. Int J Constr Manage. 19(2):93–105.
- Chung WWS, Tariq S, Mohandes SR, Zayed T. 2020. IoT-based application for construction site safety monitoring. Int J Constr Manage. 1–17. DOI: 10.1080/15623599.2020.1847405.
- CIC. 2019a. MiC. Hong Kong: Construction Industry Council.
- CIC. 2019b. Overseas significant projects. http://www.cic.hk/eng/main/mic/whatsmic/worldwide_examples/.
- CIC. 2001. The Field Rework Index: Early Warning for Field Rework and Cost Growth. Austin: Construction Industry Institute.
- City Developments limited. 2019. Innovation and smart technologies. Retrieved from https://www.cdlsustainability.com/cdl-six-capitals/manufactured-capital/innovationand-smart-technologies/.
- Dragages. 2019. Crowne plaza hotel extension. Singapore: Dragages.
- EdgeProp. 2019, July 8. Singapore is embracing ‘Lego style’ prefabricated construction method for residential housing. The South China Morning Post. https://www.scmp.com/property/international/article/3017734/singaporeembracing-lego-style-prefabricated-construction.
- Environmental Protection Department. 2017. Monitoring of Solid waste in Hong Kong – Waste statistics for 2017. https://www.wastereduction.gov.hk/sites/default/files/msw2017.pdf.
- Ferdous W, Bai Y, Ngo TD, Manalo A, Mendis P. 2019. New advancements, challenges and opportunities of multi-storey modular buildings – A state-of-the-art review. Eng Struct. 183:883–893.
- Generalova EM, Generalov VP, Kuznetsova AA. 2016. Modular buildings in modern construction. Procedia Eng. 153:167–172.
- Guthrie JB. 2009, September 2. An American perspective: skyscraper architecture goes modular in the UK. Building Design & Construction. https://www.bdcnetwork.com/american-perspective-skyscraper-architecture-goesmodular-uk.
- Hasan A, Baroudi B, Elmualim A, Rameezdeen R. 2018. Factors affecting construction productivity: a 30 year systematic review. ECAM. 25(7):916–937.
- HTA. 2017. Apex House. London: HTA Design.
- Ho XM. 2018. Hillview Rise GLS Site. Singapore: Building and Construction Authority. https://www.jld.sg/Corporate/Land-Sales/Sites-For-Tender/-. /media/325CAEFB2F164E25A41DA85EB3082953.ashx
- Ho KM, Lam JP, Max S. 2018. Pre-fabricated pre-finished volumetric construction (PPVC) for residential projects. Bukit Merah, Singapore: Threesixty Cost Management Pte Ltd.
- Hussein M, Zayed T. 2020a. Critical factors for successful implementation of just-in-time concept in modular integrated construction: a systematic review and meta-analysis. J Cleaner Prod. 284:124716.
- Hussein M, Zayed T. 2020b. Crane operations and planning in modular integrated construction: mixed review of literature. Autom Constr. 122:103466.
- Hwang BG, Shan M, Looi KY. 2018a. Knowledge-based decision support system for prefabricated prefinished volumetric construction. Autom Constr. 94:168–178.
- Hwang BG, Shan M, Looi KY. 2018b. Key constraints and mitigation strategies for prefabricated prefinished volumetric construction. J Cleaner Prod. 183:183–193.
- Jabar IL, Ismail F, Mustafa AA. 2013. Issues in managing construction phase of IBS projects. Proc – Social Behav Sci. 101:81–89.
- Javanifard N, Markert D, Strobel K, Yap J. 2013. Modular prefabricated residential construction constraints and opportunities [Post Graduate Thesis]. Washington, DC: University of Washington.
- Kamali M, Hewage K. 2016. Life cycle performance of modular buildings: a critical review. Renew Sustain Energy Rev. 62(1) :1171–1183.
- Lachimpadi SK, Pereira JJ, Taha MR, Mokhtar M. 2012. Construction waste minimization comparing conventional and precast construction (Mixed System and IBS) methods in high-rise buildings: a Malaysia case study. Resour, Conserv, Recycl. 68 :96–103.
- Lawson M, Ogden R, Goodier C. 2014. Design in modular construction. Boca Raton, FL: CRC Press, Taylor & Francis Group.
- Lawson RM, Ogden RG. 2010. Sustainability and process benefits of modular construction. In Proceedings of the 18th CIB World Building Congress, Salford, UK; p. 10–13.
- Lee K, Tariq S, Zayed T. 2020. Effectiveness of BIM-enabled modular integrated construction in Hong Kong: applications and barriers. 8th International Conference on Innovative Production and Construction, Dec 7-8. Hong Kong SAR, p. 65–74.
- Liew R, Dai Z, Chau YS. 2018, June. Steel concrete composite systems for modular construction of high-rise buildings. In Proceedings of the 12th International Conference on Advances in Steel-Concrete Composite Structures (ASCCS 2018). Editorial Universitat Politècnica de València. p. 59–65.
- Liew JYR, Chua YS, Dai Z. 2019, October. Steel concrete composite systems for modular construction of high-rise buildings. In Structures. Amsterdam: Elsevier, vol. 21, p. 135–149.
- Lim S. 2016, February 11. Lego-like building method to speed up Crowne Plaza Changi Airport hotel extension. Today. https://www.todayonline.com/singapore/extension-crowne-plaza-changi-airport-slatedcompletion-june.
- Lim H. 2018. Singapore’s construction productivity journey. Singapore: building construction authority. http://www.cic.hk/files/page/10343/20180824_Hugh%20Lim_Transforming%20the%2.0Way%20We%20Build%20-%20Singapore%E2%80%99s%20Journey%20in%20Construction%20Productivity%20and%20Prefabrication.pdf
- Lin ZY. 2020. Low-cost Apartments in Yangon's Yuzana Housing to go on Sale [Accessed 11 Feb 2021]. https://www.mmtimes.com/business/property-news/19167-low-cost-apartments-in-yangon-s-yuzana-housing-to-go-on-sale.html.
- Lopez D, Froese T. 2016. Analysis of costs and benefits of panelized and modular prefabricated homes. Procedia Eng. 145:1291–1297.
- Love PE, Smith J, Ackermann F, Irani Z, Teo P. 2018. The costs of rework: insights from construction and opportunities for learning. Prod Plan Control. 29(13):1082–1095.
- Malone D. 2017. It only took 26 days to complete construction on the Crowne Plaza Changi Airport hotel extension. Singapore: BdcNetwork. https://www.bdcnetwork.com/it-only-took-26-days-complete-construction-crowne-plaza-changi-airport-hotel-extension.
- McGraw-Hill Construction. 2011. Prefabrication and Modularization: Increasing Productivity in the Construction Industry.
- MiC Display Centre. 2019. Guided tour of MiC Display Centre. Hong Kong: MiC Display Centre.
- Modular Building Institute. 2016. Folsom Fairfield Inn. http://modular.org/Awards/AwardEntryDetail.aspx?awardentryid=161.
- Navaratnam S, Ngo T, Gunawardena T, Henderson D. 2019. Performance review of prefabricated building systems and future research in Australia. Buildings. 9(2):38.
- Paqs. 2019. Pre-fabricated pre-finished volumetric construction (ppvc) for residential projects. Selangor: Royal Institution of Surveyors Malaysia. https://www.paqs2019.com/sites/default/files/2019-09/SE6%20-%20Pre-Fabricated%20Pre-Finished%20Volumetric%20Construction%20%28PPVC%29%20For%20Residential%20Projects%20-%20Max%20Shea%20Wai%20Hoh.pdf.
- Pan W, Hon CK. 2018, November. Modular integrated construction for high-rise buildings. In Proceedings of the Institution of Civil Engineers-Municipal Engineer. Blairsville, Georgia: Panel Built Inc.; p. 1–5.
- Panel Built 2018. The Safety of Modular Construction.
- Rahim AA, Qureshi SL. 2018. A review of ibs implementation in Malaysia and Singapore. Planning Malaysia. 16 (2):323–333.
- Rahman M. 2014. Barriers of implementing modern methods of construction. J Manage Eng. 30(1):69–77.
- Rippon JA. 2011. The benefits and limitations of prefabricated home manufacturing in North America (Research Report). Vancouver, British Columbia: The University of British Columbia.
- Rong X, Zhang S, Bakhtawar B, Hussein M, Abdelmageed S, Tariq S, Zayed T. 2020. Performance assessment for modular integrated construction projects in Hong Kong. International Journal of Architecture, Engineering, and Construction. 9(3):12020017.
- Rui OY, Yahya K. 2016. The productivity rate of prefabricated pre-finished volumetric construction (PPVC). Faculty of Civil Engineering, Universiti Teknologi Malaysia. (Vol. 2); p. 67–77.
- Saaty TL, Vargas LG. 2012. Models, methods, concepts, & applications of the analytic hierarchy process (Vol. 175). Berlin: Springer Science & Business Media.
- Smith RE. 2014. Report of the results of the 2014 off-site construction industry survey. Washington, DC: National Institute of Building Studies.
- Statistica. 2020. Construction industry spending worldwide from 2014 to 2025.
- Sugiarto HS, Lim EP, Sim NL. 2019. October. On analyzing supply and demand in labor markets: Framework, model and system. In 2019 IEEE International Conference on Data Science and Advanced Analytics (DSAA); p. 511–520.
- The Clement Canopy. 2019. Project Details [Online]. [Accessed 1 Aug 2019]. https://theclementcanopy.biz/project-details/.
- Tariq S, Hu Z, Zayed T. 2020. Micro-electromechanical systems-based technologies for leak detection and localization in water supply networks: a bibliometric and systematic review. J Cleaner Prod. 289:125751.
- TCP Consultants Pte Ltd 2017. 9-storey nursing home at Woodlands Rise. https://www.tcpconsultants.com/our_projects/9-storey-nursing-home-atwoodlands-rise/.
- Trejos N. 2021. Marriott adopts modular construction [accessed 10 Feb 2021]. https://www.usatoday.com/story/travel/roadwarriorvoices/2017/05/07/marriott-adopts-modular-construction/101296330/.
- Vaardini S, Karthiyayini S, Ezhilmathi P. 2016. Study on cost overruns in construction projects: a review. Int J Appl Eng Res. 11(3):356–363.
- Velamati S. 2012. Feasibility, benefits and challenges of modular construction in high rise development in the United States: a developer's perspective [Doctoral dissertation]. Massachusetts Institute of Technology.
- Wang D, Zayed T, Pan W, Zheng S, Tariq S. 2021. A system boundary based critical review of crane selection in building construction. Autom Constr. 123:103520.
- Wuni IY, Shen GQ. 2020. Barriers to the adoption of modular integrated construction: systematic review and meta-analysis, integrated conceptual framework, and strategies. J Cleaner Prod. 249:119347.
- Wuni IY, Shen GQ, Mahmud AT. 2019. Critical risk factors in the application of modular integrated construction: a systematic review. Int J Constr Manage. 1–15. DOI: 10.1080/15623599.2019.1613212.
- Xu Z, Zayed T, Niu Y. 2020. Comparative analysis of modular construction practices in mainland China, Hong Kong and Singapore. J Cleaner Prod. 245, 118861.
- Yeung HC, Ridwan T, Tariq S, Zayed T. 2020. BEAM Plus implementation in Hong Kong: assessment of challenges and policies. Int J Constr Manage. 1–15. DOI: 10.1080/15623599.2020.1827692.
- Zayed T. 2020. MiC – new era of building construction. http://www.hongkongci.org/wp-content/uploads/2021/01/MiC-New-Era-of-Building-Construction-Final.pdf.
- Zhang X, Skitmore M, Peng Y. 2014. Exploring the challenges to industrialized residential building in China. Habitat Int. 41:176–184.
- Zhang S, Rong X, Bakhtawar B, Tariq S, Zayed T. 2021. Assessment of feasibility, challenges, and critical success factors of MiC projects in Hong Kong. J Archit Eng. 27(1):04020047.
- Zheng Keng Engineering & Construction Pte Ltd. 2017. Student Hostel at Nanyang Technological University of Singapore (PPVC). https://zhengkeng.com.sg/student-hostel-at-nanyang-technological-university-ofsingapore-ppvc/.