203
Views
1
CrossRef citations to date
0
Altmetric
Articles

Course of planned, actual and earned cost curves of diverse construction investments

&

References

  • Abba W. 2000. How earned value got to primetime: a short look back and glance ahead. In Proceedings of the project management institute annual seminars & symposium; Project Management Institute (PMI), Houston, TX. Newtown Square.
  • Al-Jibouri S. 2003. Monitoring systems and their effectiveness for project cost control in construction. Int J Proj Manag. 21(2):145–154.
  • Anysz H, Zawistowski J. 2017. Cost-time control of the progress of construction works using the earned value method using MS Project (in Polish: Kontrola kosztowo-czasowa postępu robót budowlanych metodą wartości wypracowanej z wykorzystaniem programu MS Project). In Principles and standards of cost estimation of construction works for awarding entities, investors and contractors (in Polish: Zasady i standardy kosztorysowania robót budowlanych dla zamawiających, inwestorów i wykonawców); p. 71–88.
  • Araszkiewicz K, Bochenek M. 2019. Control of construction projects using the Earned Value Method – case study. Open Eng. 9(1):186–195.
  • Ballesteros-Pérez P, Mohamed Elamrousy K. 2018. On the limitations of the Earned Value Management technique to anticipate project delays. Responsible Des. Deliv. Constr. Proj. ; p. 1–6.
  • Ballesteros-Pérez P, Sanz-Ablanedo E, Mora-Melià D, González-Cruz M, Fuentes-Bargues J, Pellicer E. 2019. Earned Schedule min-max: two new EVM metrics for monitoring and controlling projects. Autom Constr. 103:279–290.
  • Ballesteros-Pérez P, Sanz-Ablanedo E, Soetanto R, González-Cruz M, Larsen G, Cerezo-Narváez A. 2020. Duration and cost variability of construction activities: an empirical study. J Constr Eng Manag. 146(1):04019093.
  • Barraza G, Back W, Mata F. 2004. Probabilistic forecasting of project performance using stochastic S curves. J Constr Eng Manag. 130(1):25–32.
  • Bauer-Celny A, Konior J, Szóstak M, n.d. Initial, Monthly, Close-out Reporting of Bank Investment Supervision. PM Group Polska Sp. z o.o. (2006–2015) and 3EPCM Sp. z o.o. (2016–2019).
  • Bhargava A, Labi S, Chen S, Saeed T, Sinha K. 2017. Predicting cost escalation pathways and deviation severities of infrastructure projects using risk-based econometric models and Monte Carlo simulation. Comput Civ Infrastruct Eng. 32(8):620–640.
  • Chao L, Chen H. 2015. Predicting project progress via estimation of S-curve’s key geometric feature values. Autom Constr. 57:33–41.
  • Chao L, Chien C. 2009. Estimating project S-curves using polynomial function and neural networks. J Constr Eng Manag. 135(3):169–177.
  • Chao L, Chien C. 2010. A model for updating project s-curve by using neural networks and matching progress. Autom Constr. 19(1):84–91.
  • Chen H, Chen W, Lin Y. 2016. Earned value project management: improving the predictive power of planned value. Int J Proj Manag. 34(1):22–29.
  • Chen Z, Demeulemeester E, Bai S, Guo Y. 2020. A Bayesian approach to set the tolerance limits for a statistical project control method. Int J Prod Res. 58(10):3150–3163.
  • Cheng M, Roy A. 2011. Evolutionary fuzzy decision model for cash flow prediction using time-dependent support vector machines. Int J Proj Manag. 29(1):56–65.
  • Cheng M, Tsai H, Liu C. 2009. Artificial intelligence approaches to achieve strategic control over project cash flows. Autom Constr. 18(4):386–393.
  • Cheng Y, Yu C, Wang H. 2011. Short-interval dynamic forecasting for actual S-curve in the construction phase. J Constr Eng Manag. 137(11):933–941.
  • Chin-Keng T, Shahdan N. 2015. The application of Earned Value Management (EVM) in construction project management. J Technol Manag Bus. 2(2):1–11. Available online: https://www.semanticscholar.org/paper/The-Application-of-Earned-Value-Management-(EVM)-in-Keng-Shahdan/4a282f7dac42a66f4c551aba3648fdcd1d30d9a6. (accessed on 12 May 2020)
  • Chou J. 2011. Cost simulation in an item-based project involving construction engineering and management. Int J Proj Manag. 29(6):706–717.
  • Cristóbal J. 2017. The S-curve envelope as a tool for monitoring and control of projects. Procedia Comput Sci. 121:756–761.
  • Czarnigowska A. 2008. Earned value method as a tool for project control. Bud Archit. 3:15–32.
  • Czarnigowska A. 2009. Monitoring of project progress using the earned value. Przegląd Bud (in Polish). 80:50–55.
  • Czemplik A. 2014. Application of earned value method to progress control of construction projects. Procedia Eng. 91:424–428.
  • De Marco A, Narbaev T. 2013. Earned value-based performance monitoring of facility construction projects. J Facilities Manag. 11(1):69–80.
  • De Neufville R, Scholtes S, Wang T. 2006. Real options by spreadsheet: parking garage case example. J Infrastruct Syst. 12(2):107–111.
  • Dziadosz A, Kapliński O, Rejment M. 2014. Usefulness and fields of the application of the Earned Value Management in the implementation of construction projects. Bud Arch. 13(4):357–364.
  • Gunduz M, Almuajebh M. 2020. Critical Success Factors for Sustainable Construction Project Management. Sustainability. 12(5):1990.
  • Howes R. 2000. Improving the performance of Earned Value Analysis as a construction project management tool. Eng Const Arch Man. 7(4):399–411.
  • Hsieh T, Wang M, Chen C, Chen C, Yu S, Yang H, Chen T. 2006. A new viewpoint of s-curve regression model and its application to construction management. Int J Artif Intell Tools. 15(02):131–142.
  • Hsieh T, Wang M, Chen C. 2004. A case study of s-curve regression method to project control of construction management via T-S fuzzy model. J Mar Sc Technol. 12:209–216.
  • Kasprowicz T. 2017a. Quantitative assessment of construction risk. Arch Civ Eng. 63(2):55–66.
  • Kasprowicz T. 2017b. Quantitative identification of construction risk. Arch Civ Eng. 63(1):63–75.
  • Kerzner H. 2003. Project management: a systems approach to planning, scheduling, and controlling. New York (NY).: John Wiley & Sons, Inc
  • Khamooshi H, Golafshani H. 2014. EDM: Earned Duration Management, a new approach to schedule performance management and measurement. Int J Proj Manag. 32(6):1019–1041.
  • Kim B, Reinschmidt K. 2007. An S-curve Bayesian model for forecasting probability distributions on project duration and cost at completion. CME 2007 Conference - Construction Management and Economics. p. 1449–1459.
  • Klinowski M. 2014. Analysis of the current and forecast of the future realization of the project on the basis of earned value method. Res Pap Wrocław Univ Econ (in Polish). 335:105–115.
  • Konior J, Szóstak M. 2020a. Methodology of planning the course of the cumulative cost curve in construction projects. Sustainability. 12(6):2347.
  • Konior J, Szóstak M. 2020b. The S-curve as a tool for planning and controlling of construction process—case study. Appl Sci. 10(6):2071.
  • Konior J. 2018. Feasibility study of construction project in compliance with bank investment supervision requirements. J Civ Eng Archit. 12:831–883.
  • Konior J. 2019. Monitoring of construction projects feasibility by bank investment supervision approach. cea. 7(1):31–35.
  • Konior J. 2019b. Significance risks evaluation of commercial construction projects. Arch Civ Eng. 65(2):19–33.
  • Kumar V, Hanna A, Adams T. 2000. Assessment of working capital requirements by fuzzy set theory. Eng Const and Arch Man. 7(1):93–103.
  • Lam K, So A, Hu T, Ng T, Yuen R, Lo S, Cheung S, Yang H. 2001. An integration of the fuzzy reasoning technique and the fuzzy optimization method in construction project management decision-making. Constr Manag Econ. 19(1):63–76.
  • Leśniak A, Kubek D, Plebankiewicz E, Zima K, Belniak S. 2018. Fuzzy AHP application for supporting contractors’ bidding decision. Symmetry. 10(11):642.
  • Lipke W, Zwikael O, Henderson K, Anbari F. 2009. Prediction of project outcome. The application of statistical methods to earned value management and earned schedule performance indexes. Int. J. Proj. Manag. 27(4):400–407.
  • Love P, Ahiaga-Dagbui D, Irani Z. 2016. Cost overruns in transportation infrastructure projects: sowing the seeds for a probabilistic theory of causation. Transp Res Part A Policy Pract. 92:184–194.
  • Love P, Wang X, Sing C, Tiong R. 2013. Determining the probability of project cost overruns. J Constr Eng Manag. 139(3):321–330.
  • Martens A, Vanhoucke M. 2020. Integrating corrective actions in project time forecasting using exponential smoothing. J Manag Eng. 36(5):1–34. 
  • Mohagheghi V, Meysam Mousavi S, Vahdani B. 2017. An assessment method for project cash flow under interval-valued fuzzy environment. J Optim Ind Eng. 22:79–80.
  • Pakalapati K, Khalafalla M, Rueda-Benavides J. 2020. Using moving-window cross-validation algorithm to optimize bid-based cost estimating data usage. Int J Constr Manag. DOI: 10.1080/15623599.2020.1827694.
  • Plebankiewicz E, Zima K, Wieczorek D. 2017. Quantification of the risk addition in life cycle cost of a building object. Tech Trans. 5:35–45.
  • Połoński M, Komendarek P. 2011. Earned value method for operational cost control of civil structure. Quantit Meth Econ. 12:279–290.
  • Połoński M. 2018. Management of construction investment process. Warszawa (Poland): Wydawnictwo SGGW. ISBN: 9788375830873
  • Project Management Institute 2017. A guide to the project management body of knowledge (PMBOK Guide). 6th ed. Newtown Square (PA):Project Management Institute (PMI). ISBN: 9781935589679
  • Przywara D, Rak A. 2017. The time-cost analysis of schedule monitoring using the earned value method. Tech Trans. 5:57–66.
  • Saeed T. 2019. Road infrastructure readiness for autonomous vehicles [doctoral dissertation]. Purdue University Graduate School.
  • Salari M, Khamooshi H. 2016. A better project performance prediction model using fuzzy time series and data envelopment analysis. J Oper Res Soc. 67(10):1274–1287.
  • Tepeli E, Taillandier F, Breysse D. 2019. Multidimensional modelling of complex and strategic construction projects for a more effective risk management. Int J Constr Manag. 1–22. DOI: 10.1080/15623599.2019.1606493.
  • Tijanić K, Car-Pušić D. 2017. Application of S-curve in EVA method. In Proceedings of the 13th International Conference “Organization, Technology and Management in Construction; p. 103–115.
  • Vandevoorde S, Vanhoucke M. 2006. A comparison of different project duration forecasting methods using earned value metrics. Int J Proj Manag. 24(4):289–302.
  • Vanhoucke M, Coelho J, Batselier J. 2016. An overview of project data for integrated project management and control. J Mod Proj Manag. 3 (2):6–21.
  • Vanhoucke M, Vandevoorde S. 2007. A simulation and evaluation of earned value metrics to forecast the project duration. J Oper Res Soc. 58(10):1361–1374.
  • Vanhoucke M. 2019. Tolerance limits for project control: an overview of different approaches. Comput Ind Eng. 127:467–479.
  • Wang H, Hu Y. 2011. Research on the system of the construction project life cycle cost risk management. AMM. 94-96:2329–2332.
  • Waris M, Khamidi M, Idrus A. 2012. The cost monitoring of construction projects through earned value analysis. J Constr Eng Proj Manag. 2(4):42–45.
  • Yao J, Chen M, Lu H. 2006. A fuzzy stochastic single-period model for cash management. Eur J Oper. Res. 170(1):72–90.
  • Yaseen Z, Ali Z, Salih S, Al-Ansari N. 2020. Prediction of risk delay in construction projects using a hybrid artificial intelligence model. Sustainability. 12(4):1514.
  • Yeung H, Ridwan T, Tariq S, Zayed T. 2020. BEAM Plus implementation in Hong Kong: assessment of challenges and policies. Int J Constr Manag. DOI: 10.1080/15623599.2020.1827692.
  • Zavadskas E, Turskis Z, Tamošaitienė J. 2010. Risk assessment of construction projects. J Civ Eng Manag. 16(1):33–46.
  • Ziółkowska A, Połoński M. 2016. Application of the EVM method and its extensions in the implementation of construction objects. Eng Struct Technol. 7(4):189–196.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.