153
Views
1
CrossRef citations to date
0
Altmetric
Articles

A framework for aggregate base course waste control in road construction projects

&

References

  • Abusafiya HA, Suliman SM. 2017. Causes and effects of cost overrun on construction project in Bahrain: part I (Ranking of cost overrun factors and risk mapping). MAS. 11(7):20–27.
  • Adewuyi TO, Otali M. 2013. Evaluation of causes of construction material waste: case of River State, Nigeria. EJESM. 6(6):746–753.
  • Agapiou A, Clausen LE, Flanagan R, Norman G, Notman D. 1998. The role of logistics in the materials flow control process. Constr Manag Econ. 16(2):131–137.
  • Agyekum K, Ayarkwa J, Adinyira E. 2012. Consultants’ perspectives on materials waste reduction in Ghana. Eng Manage Res. 1(1):1927–7318.
  • Agyekum K, Ayarkwa J, Adjei-Kumi T. 2016. Minimizing materials wastage in construction - a lean construction approach. J Eng Appl Sci. 5(1):125–146.
  • Aiyetan AO. 2013. Causes of rework on building construction projects in Nigeria. Interim Interdiscip J. 12(3):1–5.
  • Akanni PO, Oke AE, Omotilewa OJ. 2014. Implications of rising cost of building materials in Lagos State Nigeria. SAGE Open. 4(4):215824401456121–215824401456127.
  • Al-Hajj A, Hamani K. 2011. Material waste in the UAE construction industry: main causes and minimization practices. Archit Eng Des Manag. 7(4):221–235.
  • Ameh OJ, Itodo DE. 2013. Professionals’ views of material wastage on construction sites and cost overruns. Organ Technol Manage Constr Int J. 5(1):747–757.
  • Angelo WJ, Reina P. 2002. Megaprojects need more study up front to avoid cost overruns. Constr Manag Econ. 30:31–44.
  • Aziz RF, Abdel-Hakam AA. 2016. Exploring delay causes of road construction projects in Egypt. Alex Eng J. 55(2):1515–1539.
  • Bekr GA. 2014. Study of the causes and magnitude of wastage of materials on construction sites in Jordan. J Constr Eng Manag. 2014:1–6.
  • Bertaux D. 1981. From the life-history approach to the transformation of sociological practice. In: Bertaux D, editor. Biography and society: the life history approach in the social sciences. Beverly Hills, Calif.: SAGE Publications; p. 29–45.
  • Choudhari S, Tindwani A. 2017. Logistics optimisation in road construction project. CI. 17(2):158–179.
  • Chowdhury R, Apul D, Fry T. 2010. A life cycle based environmental impacts assessment of construction materials used in road construction. Resour Conserv Recycl. 54(4):250–255.
  • Creswell JW. 2014. Research design: qualitative, quantitative and mixed methods approaches. 4th ed. Thousand Oaks, CA: Sage Publication.
  • Dhanasinghe I, Perera BAKS. 2008. Risk allocation of road projects in Sri Lanka. CIB International Conference on Building Education and Research; p. 83–94.
  • Ekanayake L, Ofori G. 2000. Construction material waste source evaluation. Proceedings: strategies for a sustainable built environment.
  • Ekanayake EMK, Perera BAKS. 2016. Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka. BEPAM. 6(5):521–534.
  • Enshassi A, Kochendoerfer B, Ghoul HA. 2016. Factors affecting sustainable performance of construction projects during project life cycle phases. Int J Sustain Constr Eng Technol. 7(1):50–68.
  • Famiyeh S, Amoatey CT, Adaku E, Agbenohevi CS. 2017. Major causes of construction time and cost overruns: a case of selected educational sector projects in Ghana. JEDT. 15(2):181–198.
  • Faniran OO, Caban G. 1998. Minimizing waste on construction project sites. Eng Constr Arch Man. 5(2):182–188.
  • Fellows R, Liu A. 2015. Research methods for construction. 4th ed. Sussex (UK): John Wiley and Sons.
  • Fernando CK, Hosseini MR, Zavadskas EK, Perera BAKS, Rameezdeen R. 2017. Managing the financial risks affecting construction contractors: implementing hedging in Sri Lanka. Int J Strateg Prop Manag. 21(2):212–224.
  • Formoso CT, Isatto EL, Hirota EH. 1999. Method for waste control in the building industry. In: Proceedings IGLC 1999, Jul 26; Vol. 7; p. 325.
  • Formoso CT, Soibelman L, De Cesare C, Isatto EL. 2002. Material waste in building industry: main causes and prevention. Int J Constr Manag. 128(4):316–325.
  • Garas GL, Anis AR, El Gammal A. 2001. Materials waste in the Egyptian construction industry. Proceedings IGLC-9, Singapore; p. 86.
  • Gavilan RM, Bernold LE. 1994. Source evaluation of solid waste in building construction. J Constr Eng Manag. 120:536–552.
  • Gichuhi F. 2013. Percentage of cost breakdown between labour, materials and contractor profit in construction. [accessed 2020 Mar 25]. https://www.a4architect.com/2013/04/percentage-of-cost-breakdown-between-labour-materials-and-contractor-profit-in-construction/#:∼:text=Such%20works%20usually%20have%20a,more%20%25%20of%20labour%20than%20others.
  • Gupta S, Jha KN, Vyas G. 2020. Proposing building information modeling-based theoretical framework for construction and demolition waste management: strategies and tools. Int J Constr Manag. 1–11. DOI: 10.1080/15623599.2020.1786908.
  • Henderson TC. 2015. Informing change: course content analysis and organization. In: 2015 IEEE Frontiers in Education Conference (FIE), Oct 21; p. 1–9. IEEE.
  • Hussin JM, Rahman IA, Memon AH. 2013. The way forward in sustainable construction: issues and challenges. Int J Adv Sci Technol. 2(1):15–24.
  • Hwang B, Yeo ZB. 2011. Perception on benefits of construction waste management in the Singapore construction industry. Eng Const Arch Man. 18(4):394–406.
  • Idoro GI, Jolaiya O. 2010. Evaluating material storage strategies and their relationship with construction project performance. Proceedings of CIB International Conference on Building Education and Research, University of Cape Town; p. 103–113.
  • Jagboro GO, Owoeye CO. 2004. A model for predicting the prices of building materials using the exchange rate in Nigeria. Malaysian Surveyor. 5(6):9–14.
  • Jitsangiam P, Chummuneerat S, Nikraz H. 2013. Engineering characteristics of cement modified base course material for Western Australian pavements. Aust J Civ Eng. 11(1):13–22.
  • Kaliba C, Muya M, Mumba K. 2009. Cost escalation and schedule delays in road construction projects in Zambia. Int J Proj Manag. 27(5):522–531.
  • Kang DH, Gupta SC, Ranaivoson AZ, Siekmeier J, Roberson R. 2011. Recycled materials as substitutes for virgin aggregates in road construction: hydraulic and mechanical characteristics. Soil Phys. 75(4):1265–1275.
  • Kanimozhi G, Latha P. 2014. Material management in construction industry. Ind J Appl Res. 4(4):1–3.
  • Kazaz A, Ulubeyli S, Arslan A. 2020. Quantification of fresh ready-mix concrete waste: order and truck-mixer based planning coefficients. Int J Constr Manag. 20(1):53–64.
  • Keal L. 2007. Reducing material wastage in construction. 10(3):2010. [accessed 2020 Apr 25]. www.wrap.org.uk/construction.
  • Khairulzan Y, Halim AB. 2006. Eco-costing of construction waste. J Manage Environ Qual Int J. 17(1):6–19.
  • Kofoworola OF, Gheewala SH. 2009. Estimation of construction waste generation and management in Thailand. Waste Manag. 29(2):731–738.
  • Koshy R, Apte EM. 2012. Waste minimization of construction materials on bridge site (cement and reinforcement steel) – a regression and correlation analysis. Int J Eng Technol Innov. 2(1):6–14.
  • Kothari CR. 2004. Research methodology, methods and techniques. 2nd ed. New Delhi (India): New Age International.
  • Krishna USR, Kumar CNS. 2020. A case study on maintenance of bituminous concrete pavement considering life cycle cost analysis and carbon footprint estimation. Int J Constr Manag. 1–9. DOI: 10.1080/15623599.2020.1742629.
  • Kulatunga U, Amaratunga D, Haigh R, Rameezdeen R. 2006. Attitudes and perceptions of construction workforce on construction waste in Sri Lanka. Manage Env Qual. 17(1):57–72.
  • Ling FYY, Nguyen DSA. 2013. Strategies for construction waste management in Ho Chi Minh city, Vietnam. Built Environ Proj Asset Manag. 3(1):141–156.
  • Lu W, Yuan H, Li J, Hao JJ, Mi X, Ding Z. 2011. An empirical investigation of construction and demolition waste generation rates in Shenzhen city, South China. Waste Manag. 31(4):680–687.
  • Lu W, Tam VWY. 2013. Construction waste management policies and their effectiveness in Hong Kong: a longitudinal review. Renew Sust Energ Rev. 23:214–223.
  • Luangcharoenrat C, Intrachooto S, Peansupap V, Sutthinarakorn W. 2019. Factors influencing construction waste generation in building construction: Thailand’s perspective. Sustainability. 11(13):3638–3617.
  • Lyons K. 2015. Does your sample size matter? 3 tips to ensure reliable research data. [accessed 2020 Apr 15]. https://www.lipmanhearne.com/does-your-sample-size-matter/.
  • Madhavarao B, Kothuri M, Asadi S. 2018. A critical analysis of material management techniques in construction project. Int J Civ Eng Technol. 9(4):826–835.
  • Mahajan AP, Aher PD. 2017. Scenario of construction material waste and its effects on cost wastage in Nasik. Int Res Eng Technol. 4(5):1512–1516.
  • Mahamid I, Bruland A. 2012. Cost deviation in road construction projects: the case of Palestine. Australas J Constr Econ Build. 12(1):58–71.
  • Manamgoda M, Perera B, Perera C. 2018. Impact of interest rates of bank loans on road construction: the case of Sri Lanka. J Eng Des Technol. 16(3):518–532.
  • Mason M. 2010. Sample size and saturation in PhD studies using qualitative interviews. Forum Qual Soc Res. 11(3). DOI: 10.17169/fqs-11.3.1428
  • Mbote RP, Makworo M, Kimtai AK. 2016. An investigation on the influence of factors causing material waste on construction cost of residential building frame. A case of northern region of Nairobi. Int J Eng Res Technol. 5(9):436–447.
  • McCusker K, Gunaydin S. 2015. Research using qualitative, quantitative or mixed methods and choice based on the research. Perfusion. 30(7):537–542.
  • Mishmish M, El-Sayegh SM. 2018. Causes of claims in road construction projects in the UAE. Int J Constr Manag. 18(1):26–33.
  • Mokhtar SN, Mahmood NZ. 2008. Approach in construction industry: a study on prefabrication method as a tool for waste minimization. In: International Conference on Environmental Research and Technology (ICERT. 2008); Vol. 10.
  • Mwelu N, Davis PR, Ke Y, Watundu S, Jefferies M. 2018. Success factors for implementing Uganda’s public road construction projects. CEB. 18(4):1–17.
  • Nagapan S, Rahman IA, Asmi A, Memon AH, Latif I. 2012. Issues on construction waste: the need for sustainable waste management. IEEE Colloquium on Humanities, Science & Engineering Research (CHUSER 2012), Kota Kinabalu, Sabah, Malaysia.
  • Nascimento LCN, Souza TV, Oliveira ICS, Moraes JRMM, Aguiar RCB, Silva LF. 2018. Theoretical saturation in qualitative research: an experience report in interview with schoolchildren. Rev Bras Enferm. 71(1):228–233.
  • Nazech EM, Zaldi D, Trigunarsyah B. 2008. Identification of construction waste in road & highway construction projects. The Eleventh East Asia-Pacific Conference on Structural Engineering and Construction (EASEC-11), Taipei, Taiwan; p. 19–21.
  • Ndihokubwayo R, Haupt T. (2009). Variation orders of construction projects: value adding or waste? IJCPM. 1(2):1–17.
  • Nunnally JC. 1978. Psychometric theory. New York (NY): McGraw-Hill.
  • Nurdiana A, Susanti R, Suwarto F. 2018. Identification of risk factors cause cost overrun at toll road project. Adv Sci Lett. 24(12):9534–9536.
  • Odusami KT, Oladiran OJ, Ibrahim SA. 2012. Evaluation of materials wastage and control in some selected building sites in Nigeria. Emir J Eng Res. 17(2):53–65.
  • Ogbu C, Adindu C. 2019. Direct risk factors and cost performance of road projects in developing countries: contractors’ perspective. JEDT. 18(2):326–342.
  • Okate A, Kakade V. 2019. Risk management in road construction projects: high volume roads. Proceedings of Sustainable Infrastructure Development & Management (SIDM), Nagpur; p. 1–4.
  • Otim G, Nakacwa F, Kyakula M. 2011. Cost control techniques used on building construction sites in Uganda. Second International Conference on Advances in Engineering and Technology, Noida, India; p. 367–373.
  • Palinkas LA, Horwitz SM, Green CA, Wisdom JP, Duan N, Hoagwood K. 2015. Purposeful sampling for qualitative data collection and analysis in mixed method implementation research. Adm Policy Ment Health. 42(5):533–544.
  • Park WJ, Kim R, Roh S, Ban H. 2020. Identifying the major construction wastes in the building construction phase based on life cycle assessments. Sustainability. 12(19):8096.
  • Patel V, Poitroda J. 2017. A critical literature review on the impact of material management on construction project delivery. Int J Creative Res Thoughts. 5(4):1829–1836.
  • Povetkin K, Isaac S. 2020. Identifying and addressing latent causes of construction waste in infrastructure projects. J Clean Prod. 266:122024.
  • Punch K. 2014. Introduction to social research: quantitative and qualitative approaches. 3rd ed. Los Angeles; London: Sage Publication.
  • Rameezdeen R, Kulatunga U, Amaratunga D. 2004. Quantification of construction material waste in Sri Lankan sites. Proceedings of International Built and Human Environment Research Week. https://www.irbnet.de/daten/iconda/CIB14730.pdf.
  • Randell P, Pickin J, Grant B. 2014. Waste generation and resource recovery in Australia: reporting period 2010/11, Australia. https://www.environment.gov.au/system/files/resources/4b666638-1103-490e-bdef-480581a38d93/files/wgrra.pdf.
  • Rangelova F. 2015. Fundamentals of economics in sustainable construction. Sofia (Bulgaria): Bultest Standard Ltd.
  • Rani HA. 2017. The impact of construction waste to the environmental on project development in Aceh. [accessed 2020 Apr 10]. https://www.researchgate.net/publication/316561517_The_Impact_of_Construction_Waste_to_The_Environmental_on_Project_Development_in_Aceh.
  • Rathinakumar V, Priya K, Kumar I, Ravekumar C. 2018. Construction material management through inventory control techniques. IJET. 7(3.12):899–903.
  • Saidu I, Shakantu W. 2017. A post-contract project analysis of material waste and cost overrun on construction sites in Abuja. Acta Struct. 24(2):77–105.
  • Saunders B, Sim J, Kingstone T, Baker S, Waterfield J, Bartlam B, Burroughs H, Jinks C. 2018. Saturation in qualitative research: exploring its conceptualization and operationalization. Qual Quant. 52(4):1893–1907.
  • Sawant O, Mahale S, Ramchandran V, Nagaraj G, Bankar A. 2016. Fungal citric acid production using waste materials: a mini-review. J Microbiol Biotechnol Food Sci. 8(2):821–828.
  • Shakantu W, Tookey J, Bowen P. 2003. The hidden cost of transportation of construction materials: an overview. J Eng Des Technol. 1(1):103–118.
  • Shen LY, Tam V. 2002. Implementation of environmental management in the Hong Kong construction industry. Int J Proj Manag. 20(7):535–543.
  • Shooshtarian S, Maqsood T, Wong PSP, Khalfan M, Yang RJ. 2019. Green construction and construction and demolition waste management in Australia. 43rd AUBEA Conference: Built to Thrive: Creating Buildings and Cities That Support Individual Well-Being and Community Prosperity, Noosa, Australia.
  • Tam VW. 2007. On the effectiveness in implementing a waste-management-plan method in construction. Waste Manag. 28(6):1072–1080.
  • Tam VW, Lu W. 2016. Construction waste management profiles, practices, and performance: a cross-jurisdictional analysis in four countries. Sustainability. 8(2):190–206.
  • Tavakol M, Dennick R. 2011. Making sense of Cronbach’s alpha. Int J Med Educ. 2:53–55.
  • Teddlie C, Tashakkori A. 2003. Major issues and controversies in the use of mixed methods in the social and behavioural sciences. In: Tashakkori A, Teddlie C, editors. Handbook of mixed methods in social & behavioral research. Thousand Oaks (CA): Sage Publications Inc; p. 3–50.
  • Titi HH, Dakwar M, Sooman M, Tabatabai H. 2018. Long term performance of gravel base course layers in asphalt pavements. Case Stud Constr Mater. 9:e00208.
  • Trigunarsyah B, Putrianti N. 2008. Factors that influence contractor’s risk response planning in controlling cost of road construction project in Indonesia. CIB International Conference on Building Education and Research, United Kingdom; p. 125–133.
  • Udawatta N, Zuo J, Chiveralls K, Zillante G. 2015a. Improving waste management in construction projects: an Australian study. Resour Conserv Recycl. 101:73–83.
  • Udawatta N, Zuo J, Chiveralls K, Zillante G. 2015b. Attitudinal and behavioural approaches to improving waste management on construction projects in Australia: benefits and limitations. Int. J. Constr. Manag. 15(2):137–147.
  • Udofia EA, Fobil JN, Gulis G. 2015. Solid medical waste management in Africa. Afr J Environ Sci Technol. 9(3):244–254.
  • Uprichard E, Dawney L. 2019. Data diffraction: challenging data integration in mixed methods research. J Mix Methods Res. 13(1):19–32.
  • Wang YY, Touran A, Christoforou C, Fadlalla H. 2004. A systems analysis tool for construction and demolition wastes management. Waste Manag. 24(10):989–997.
  • Wang J, Han L, Li S. 2008. The collection system for residential recyclables in communities in Haidian District, Beijing: a possible approach for China recycling. Waste Manag. 28(9):1672–1680.
  • Waty M, Alisjahbana SW, Gondokusumo O, Sulistio H, Hasyim C, Setiawan I, Harmanto D, Ahmar AS. 2018. Modeling of waste material costs on road construction projects. IJET. 7(2.14):474–477.
  • Waty M, Sulistio H. 2019. Road construction project waste material recommendations. IOP Conf Series Mater Sci Eng. 650:012031.
  • Woetzel J, GaremoN Mischke J, Kamra P, Palter R. 2017. Bridging infrastructure gaps: has the world made progress? [accessed 2020 Mar 8]. https://www.mckinsey.com/business-functions/operations/our-insights/bridging-infrastructure-gaps-has-the-world-made-progress.
  • Wong YC, Wong KY, Ali A. 2009. Key practice areas of lean manufacturing. International Association of Computer Science and Information Technology, Spring Conference; p. 267–271. ISBN: 978-0-7695-3653-8.
  • Wu H, Zuo J, Zillante G, Wang J, Yuan H. 2019. Construction and demolition waste research: a bibliometric analysis. Arch Sci Rev. 62(4):354–365.
  • Yuan HP, Shen LY, Hao JJ, Lu WS. 2011. A model for cost–benefit analysis of construction and demolition waste management throughout the waste chain. Resour Conserv Recycl. 55(6):604–612.
  • Yunpeng H. 2011. Minimization management of construction waste. IEEE International Symposium of Water Resource and Environmental Protection (ISWREP), China; p. 27692772.
  • Zafar I, Yousaf T, Ahmed S. 2016. Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan – a case study. KSCE J Civ Eng. 20(5):1613–1620.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.