377
Views
2
CrossRef citations to date
0
Altmetric
Articles

Construction industry sustainable development indicator for low-income developing countries: Yemen as a case study

&

References

  • Alaghbari W, Al-Sakkaf A, Sultan B. 2019. Factors affecting construction labour productivity in Yemen. Int J Constr Manage. 19(1):79–91.
  • Alaghbari W, Salim A, Dola K, Ali A. 2011. Developing affordable housing design for low income in Sana'a, Yemen. Int J Hous Markets Anal. 4(1):84–98.
  • Al-Fadhali N, Soon NK, Zainal R, Ahmad AR, Hasaballah AHA. 2018. Influential factors in construction industry of Yemen. In Proceedings of the 21st International Symposium on Advancement of Construction Management and Real Estate. Singapore: Springer. p. 927–943
  • Al-Fadhali N, Zainal R, Kasim N, Dodo M, Kim Soon N, Hasaballah AHA. 2019. The desirability of Integrated Influential Factors (IIFs) Model of internal stakeholder as a panacea to project completion delay in Yemen. Int J Constr Manage. 19 (2):128–136.
  • Baron A. 2019. Mapping the Yemen Conflict, European Council of Foreign Relations (ecfr.eu), last update in July 2019; [accessed 2020 Jun 12]. https://www.ecfr.eu/mena/yemen.
  • Cheung SO, Suen H, Cheung K. 2004. PPMS: A Web-based construction project performance monitoring system. Autom Constr. 13(3):361–376.
  • Constructing Excellence in partnership with Department of Business Enterprise and Regulatory Reform. 2009. UK Industry Performance Report. London, UK; [accessed 2021 Jun 18]. https://constructingexcellence.org.uk/wp-content/uploads/2014/10/Industry_Performance_Report_2009.pdf.
  • Construction Industry Institute (CII). 2011. Benchmarking and metrics. Construction Industry Institute; [accessed 2021 Jun 18]. https://www.yumpu.com/en/document/read/38053241/2011-edition-construction-industry-institute.
  • Dalal-Clayton DB. 1993. Modified EIA and indicators of sustainability: first steps towards sustainability analysis. Environmental Planning Issues No. 1, Environmental Planning Group, International Institute for Environment and Development, London; [accessed 2020 Jun 5]. https://pubs.iied.org/pdfs/7766IIED.pdf.
  • Djebarni R, Al-Abed A. 1998. Adequacy housing adequacy in Yemen: an investigation into physical quality. Property Manage. 16(1):16–23.
  • Du Plessis C. 2002. Agenda 21 for sustainable construction in developing countries: a discussion document. Pretoria: CSIR Building and Construction Technology; [accessed 2020 Jun 5]. https://www.academia.edu/19056415/Agenda_21_for_Sustainable_Construction_in_Developing_Countries?auto=download.
  • Edmonds GA, Miles D. 1984. Foundations for change: aspects of the construction industry in developing countries. London: Intermediate Technology Publication.
  • Egan J. 1998. Rethinking construction. The report of the construction task force. UK: Department of Trade and Industry.
  • El-Mallakh R. 2014. The economic development of the Yemen Arab Republic (RLE Economy of Middle East). Vol. 14. London: Routledge.
  • Fox P, Martin S. 2002. Key factors in the future development of the construction industry. Creating a Sustainable Construction Industry in Developing Countries, Proceedings of the 1st International Conference of the International Council for Building Research Studies and Documentation (CIB) Working Commission W107: Construction in Developing Co; Stellenbosch, South Africa. p. 543–554.
  • Gamil Y, Rahman IA, Nagapan S, Nasaruddin NAN. 2020. Exploring the failure factors of Yemen construction industry using PLS‐SEM approach. Asian J Civ Eng. 21(6):967–975.
  • Gamil Y, Rahman IA. 2020. Assessment of critical factors contributing to construction failure in Yemen. Int J Constr Manage. 20(5):429–436.
  • Han SS, Ofori G. 2001. Construction industry in China's Regional Economy, 1990–1998. Constr Manage Econ. 19(2):189–205.
  • Hillebrandt PM. 1985. Economic theory and the construction industry. 2nd ed. London: Macmillan.
  • Hillebrandt PM. 1997. Problems of, and some remedies for, some underdeveloped construction industries. Proceedings of the First International Conference on Construction Industry Development, Dec 9–12. Vol. 1; Singapore. p. 150–157.
  • Huang R-Y, Hsu W-T. 2011. Framework development for state-level appraisal indicators of sustainable construction. Civ Eng Environ Syst. 28(2):143–164.
  • Luu VT, Kim S, Huynh T. 2008. Improving project management performance of large contractors using benchmarking approach. Int J Project Manage. 26(7):758–769.
  • Mineur E. 2007. Towards sustainable development: indicators as a tool of local governance, Research Report. 5. Sweden: Department of Political Science, Umeå University. Available from: https://www.diva-portal.org/smash/get/diva2:141019/FULLTEXT01.pdf.
  • Mir AH, Tanvir M, Durrani AZ. 2007. Development of Construction Industry - a literature review. South Asia Sustainable Development Unit (SASSD), World Bank Documents: Report No. 43185, Nov.; [accessed 2021 Mar 12]. http://documents1.worldbank.org/curated/en/653051468091794690/pdf/431850PNT0REPL10A0Literature0Review.pdf.
  • Ofori G. 1993. Research on construction industry development at the crossroads. Constr Manage Econ. 11(3):175–185.
  • Ofori G. 1994. Practice of construction industry development at the crossroads. Habitat Int. 18(2):41–56.
  • Ofori G. 2000. Challenges of construction industries in developing countries: lessons from various countries. Proceedings of the 2nd International Conference of the CIB TG29 on Construction in Developing Countries: Challenges Facing the Construction Industry in Developing Countries, Nov 15–17, Gaborone, Botswana. p. 1–3.
  • Ofori G. 2001. Indicators for measuring construction industry development in developing countries. Build Res Inf. 29(1):40–50.
  • Okoye PU, Mbakwe CC, Igbo EN. 2018. Modeling the construction sector and oil prices toward the growth of the Nigerian economy: an econometric approach. Economies. 6(1):16.
  • Pillai AS, Joshi A, Rao KS. 2002. Performance measurement of R&D projects in a multi-project, concurrent engineering environment. Int J Project Manage. 20(2):165–177.
  • Rankin J, Fayek AR, Meade G, Haas C, Manseau A. 2008. Initial metrics and pilot program results for measuring the performance of the Canadian construction industry. Can J Civ Eng. 35(9):894–907.
  • Roberts M, Latorre V. 2009. KPIs in the UK’s construction industry: using system dynamics to understand. Revista de la Constr. 8(1):69–82.
  • Skibniewski MJ, Ghosh S. 2009. Determination of key performance indicators with enterprise resource planning systems in engineering construction firms. J Constr Eng Manage. 135(10):965–978.
  • Spangenberg JH. 2009. Sustainable development indicators: towards integrated systems as a tool for managing and monitoring a complex. Int J Global Environ Issues. 9(4):318–337.
  • Sultan B, Alaghbari W. 2017. Priorities for sustainable construction industry development in Yemen. Int J Appl Eng Res. 12(6):886–893.
  • Sultan B, Alaghbari W. 2018. Political instability and the informal construction sector in Yemen. Int J Civ Eng Technol. 9(11):1228–1235.
  • Sultan B, Alaghbari W. 2020. Investigating the cost of modern construction in Yemen. Int J Civ Eng Technol. 11(3):97–104.
  • Sultan B, Kajewski S. 2003. The behavior of construction costs and affordability in developing countries: a Yemen case study. Proceedings of the Joint International Symposium of CIB Working Commission – Knowledge Construction; Oct 22–24; Singapore: National University of Singapore. p. 656–667.
  • Sultan B. 2013. Impediments to the construction industry development of Yemen. J Sci Technol. 18(2):1–14. file:///C:/Users/PC/Downloads/98-Article%20Text-165-1-10-20140518%20(1).pdf
  • Turin DA. 1973. The Construction Industry: its economic significance and its role in development. 2nd ed. London: University College Environmental Research Group.
  • UN-CSD 2007. Indicators of Sustainable Development: Guidelines and Methodologies, 3rd Ed. (the United Nations Committee on Sustainable Development), United Nations, New York. [Accessed 2020 Jun 10]. http://www.un.org/esa/sustdev/natlinfo/indicators/guidelines.pdf.
  • UN-CSD. 2001. Indicators of sustainable development: guidelines and methodologies, Background Paper no. 3. Ninth Session: 16 - 27 April 2001, Committee on Sustainable Development, United Nations, New York (NY); [accessed 2020 Jun 10]. https://www.un.org/esa/sustdev/csd/csd9_indi_bp3.pdf.
  • UNIDO. 1981. Yemen Arab Republic: the construction Industry a Survey and Identification Report. World Bank Co-Operative Programme; Jul 17.
  • United Nations (UNCTAD). 2002. The least developed countries report 2002, United Nations Conference on Trade and Development, Geneva; [accessed 2020 Jun 10]. https://unctad.org/en/Docs/ldc2002_en.pdf.
  • United Nations. 1992. United Nations Conference on Environment and Development Rio de Janeiro, Volume I - Resolutions Adopted by the Conference; 3–14 Jun; [accessed 2020 Jun 10]. https://www.un.org/esa/dsd/agenda21/Agenda%2021.pdf.
  • Walsh KD, Sawhney A, Vachris MA. 2006. Engineering, Improving inter-spatial comparison of construction costs. Eng Constr Archit Manage. 13(2):123–135.
  • Wells J. 1985. The role of construction in economic growth and development. Habitat Int. 9(1):55–70.
  • Wong C. 2004. Contractor performance prediction model for the United Kingdom construction contractor: study of logistic regression approach. J Constr Eng Manage. 130(5):691–698.
  • World Bank. 1990–2019. World Bank development reports; [accessed 2020 May 25]. https://data.worldbank.org/country and https://data.worldbank.org/country/yemen-rep?view=chart.
  • World Bank. 1999. Country classification; [accessed 2020 May 20]. https://data.worldbank.org/country. and https://data.worldbank.org/country/yemen-rep?view=chart.
  • World Bank. 2016. The 2016 world development indicators; [accessed 2020 Jun 7]. http://data.worldbank.org/country/yemen-rep?view=chart.
  • Yan L, Ye K, Jiang W. 2015. Sustainable construction indicators: an examination of clients' requirements in tender documents. ICCREM 2015: Environment and the Sustainable Building: Proceedings of the 2015. International Conference on Construction and Real Estate Management, Aug 11–12; Luleå, Sweden. Reston, VA: American Society of Civil Engineers. p. 380–388.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.