References
- Abdullah M, Alaloul W, Liew MS, Mohammed B. 2018. Delays and cost overruns causes during construction of palm oil refinery projects. MATEC Web Conf. 203:02004.
- AGC. 2020. Construction layoffs spread rapidly as coronavirus shuts down projects, in contrast to job gains through February in most metros. The Associated General Contractor of America.
- Alaghbari W, Al-Sakkaf A, Sultan B. 2019. Factors affecting construction labour productivity in Yemen. Int J Constr Manag. 19(1):79–91.
- Alzahrani JI, Emsley MW. 2013. The impact of contractors’ attributes on construction project success: a post construction evaluation. Int J Project Manage. 31(2):313–322.
- Assbeihat JM. 2018. Reasons behind subcontractor's defaults in construction projects. Int J Civ Eng Technol. 9(4):327–338.
- Bajjou MS, Chafi A. 2020. Empirical study of schedule delay in Moroccan construction projects. Int J Constr Manag. 20(7):783–800.
- Bong S, Rameezdeen R, Zuo J, Li RYM, Ye G. 2015. The designer's role in workplace health and safety in the construction industry: post-harmonized regulations in South Australia. Int J Constr Manag. 15(4):276–287.
- Chen C, Goldstein A, Orr RJ. 2009. Local operations of Chinese construction firms in Africa: an empirical survey. Int J Constr Manag. 9(2):75–89.
- Chen P, Partington D, Wang J. 2008. Conceptual determinants of construction project management competence: a Chinese perspective. Int J Project Manage. 26(6):655–664.
- Chin H, Disonisus N. 2011. Globalization and innovation in East Asia. ERIA Research Project Report 2010, No. 004. p. 1–20.
- Choudhry RM, Fang D, Rowlinson S. 2008. Challenging and enforcing safety management in developing countries: a strategy. Int J Constr Manag. 8(1):87–101.
- Cooke-Davies T. 2002. The ‘real’ success factors on projects. Int J Project Manage. 20(3):185–190. http://dx.doi.org/10.1016/S0263-7863(01)00067-9.
- Corbin J, Strauss A. 2008. Basics of qualitative research: techniques and procedures for developing grounded theory. 3rd ed. Thousand Oaks, CA: Sage Publications, Inc.
- Demirkesen S, Ozorhon B. 2017. Impact of integration management on construction project management performance. Int J Project Manage. 35(8):1639–1654.
- Durdyev S, Mbachu J. 2018. Key constraints to labour productivity in residential building projects: evidence from Cambodia. Int J Constr Manag. 18(5):385–393.
- El-Sayegh SM, Manjikian S, Ibrahim A, Abouelyousr A, Jabbour R. 2021. Risk identification and assessment in sustainable construction projects in the UAE. Int J Constr Manag. 21(4):327–336.
- Enshassi A, Arain FM, Tayeh B. 2010. Subcontractor prequalification practices in palestine. Int J Constr Manag. 10(4):45–74.
- Gould and Ratner. 2020. Identifying and managing construction risks during the coronavirus pandemic. http://www.gouldratner.com/publication.
- Habibi M, Kermanshachi S. 2018. Phase-based analysis of key cost and schedule performance causes and preventive strategies research trends and implications. ECAM. 25(8):1009–1033.
- Iamratanakul S, Badir FY, Siengthai S, Sukhotu V. 2014. Indicators of best practices in technology product development projects: prioritizing critical success factors. Int J Manag Proj Bus. 7(4):602–623.
- Iamratanakul S, Kocaoglu DF. 2006. New product development and innovation: literature explorations and descriptions. Portland International Conference on Management of Engineering and Technology. PICMET, Portland.
- Ika L. 2009. Project success as a topic in project management journals. Int J Project Manage. 40(4):6–19.
- Jimoh R, Oyewobi L, Isa R, Waziri I. 2019. Total quality management practices and organizational performance: the mediating roles of strategies for continuous improvement. Int J Constr Manag. 19(2):162–177.
- Kavishe N, Jefferson I, Chileshe N. 2019. Evaluating issues and outcomes associated with public–private partnership housing project delivery: Tanzanian practitioners’ preliminary observations. Int J Constr Manag. 19(4):354–369.
- Kholil K. 2012. Institutional models of Bunaken National Park (BNP) management to ensure sustainability of ecological and economic functions. Int J Dev Sustain. 1:391–401.
- Khoshgoftar M, Bakar AHA, Osman O. 2010. Causes of delays in Iranian construction projects. Int J Constr Manag. 10(2):53–69.
- Kuwaiti EA, Ajmal MM, Hussain M. 2018. Determining success factors in Abu Dhabi health care construction projects: customer and contractor perspectives. Int J Constr Manag. 18(5):430–445.
- Li M, Yang J. 2014. Analysis of interrelationships between critical waste factors in office building retrofit projects using interpretive structural modelling. Int J Constr Manag. 14(1):15–36.
- Mahdi I, Soliman E. 2021. Significant and top ranked delay factors in Arabic Gulf countries. Int J Constr Manag. 21(2):167–180.
- Mohamed SE, Emad EE, El-Adaway IH. 2021. Simultaneous multi-criteria optimization for scheduling linear infrastructure projects. Int J Constr Manag. 21(1):41–55.
- Nguyen LH, Watanabe T. 2017. The impact of project organizational culture on the performance of construction projects. Sustainability. 9(5):781.
- Poon SW, Rowlinson SM, Koh T, Deng Y. 2013. Job burnout and safety performance in the Hong Kong construction industry. Int J Constr Manag. 13(1):69–78.
- Qiao L, Ryan M. 2020. Analysis of business processes in supply chain: an interpretive structural modeling approach. IEEE Symposium Series on Computational Intelligence (SSCI). p. 1655–1662.
- Rachid Z, Toufik B, Mohammed B. 2019. Causes of schedule delays in construction projects in Algeria. Int J Constr Manag. 19(5):371–381.
- Rameezdeen R, Chileshe N, Hosseini MR, Lehmann S. 2016. A qualitative examination of major barriers in implementation of reverse logistics within the South Australian construction sector. Int J Constr Manag. 16(3):185–196.
- Saxena J, Sushil P, Vrat P. 1992. Hierarchy and classification of program plan elements using interpretive structural modeling: a case study of energy conservation in the Indian cement industry. Syst Pract. 5:651–670.
- Shahraki S, Saghatforoush E, Ravasan AZ. 2018. Identification and classification of factors affecting the performance of building supervisor engineers for construction industry. J Eng Proj Prod Manag. 8(2):65–74.
- Smyth H. 2004. Competencies for improving construction performance: theories and practice for developing capacity. Int J Constr Manag. 4 (1):41–51.
- Sushil 2012. Interpreting the interpretive structural model. Glob J Flex Syst Manag. 13(2):87–106.
- Teng Y, Li X, Wu P, Wang X. 2019. Using cooperative game theory to determine profit distribution in IPD projects. Int J Constr Manag. 19(1):1–14.
- Teo EA-L, Feng Y. 2010. The moderated effect of safety investment on safety performance for building projects. Int J Constr Manag. 10(3):45–61.
- Valence G. d. 2013. Construction management strategies: a theory of construction management By Milan Radosavljevic and John Bennett, Wiley-Blackwell, London, 2012. ISBN 978-0-470-65609-9, £39.99 (pb). Constr Manag Econ. 31(1):90–93.
- Wuni I, Shen G, Mahmud A. 2019. Critical risk factors in the application of modular integrated construction: a systematic review. Int J Constr Manag. 19(1):1–15.
- Yanita R, Mochtar K. 2021. Legal aspect of value engineering implementation in Jakarta (Indonesia) construction projects. Int J Constr Manag. 21(2):131–139.
- Yin RK. 2009. Case study research: design and methods. 4th ed. Thousand Oaks, CA: Sage Publications.
- Zahoor H, Chan APC, Masood R, Choudhry RM, Javed AA, Utama WP. 2016. Occupational safety and health performance in the Pakistani construction industry: stakeholders' perspective. Int J Constr Manag. 16(3):209–219.
- Zhang X, Azhar S, Nadeem A, Khalfan M. 2018. Using Building Information Modelling to achieve Lean principles by improving efficiency of work teams. Int J Constr Manag. 18(4):293–300.