1,761
Views
2
CrossRef citations to date
0
Altmetric
Articles

The randomized method of estimating the net present value of construction projects efficiency

, &

References

  • Abdel-Hamid M, Abdelhaleem HM. 2021. Project cost control using five dimensions building information modelling. Int J Construct Manage. 21:1–10. https://doi.org/10.1080/15623599.2021.1880313.
  • Belay AM, Torp O. 2021. Construction cost performance under quality-gated framework: the cases of Norwegian road constructions. Int J Construct Manage. 21:1–14. https://doi.org/10.1080/15623599.2021.1949670.
  • Benjamin JR, Cornell CA. 2014. Probability, statistics, and decision for civil engineers. Manufactured in the United States by Courier Corporation. Mineola, NY: Dover Publications.
  • Bizon-Górecka J. 2008. O zarządzaniu projektami inwestycyjno-budowlanymi z uwzględnieniem czynników ryzyka. Przegląd Budowlany. 79:42–46.
  • Braganca L, Kokkari H, Veljkovic M, Borg RP. 2010. Sustainable Construction. A Life Cycle Approach in Engineering. International Training School. Malta: Faculty for the Built Environment, University of Malta. ISBN/ISSN: 978-99932-0-918-8.
  • Cao J, Song W. 2016. Risk assessment of co-creating value with customers: A rough group analytic network process approach. Expert Syst Appl. 55:145–156.
  • De Wilde P. 2018. Building performance analysis. Hoboken, NJ: John Wiley and Sons Ltd.
  • Ding L, Zhou Y, Akinci B. 2014. Building Information Modeling (BIM) application framework: The process of expanding from 3D to computable nD. Autom Constr. 46:82.
  • Frishman F. 1971. On the arithmetic means and variances of products and ratios of random variables. Durham (NC): Army Research Office. www.dtic.mil/dtic/tr/fulltext/u2/785623.pdf.
  • Genc O. 2021. Identifying principal risk factors in Turkish construction sector according to their probability of occurrences: a relative importance index (RII) and exploratory factor analysis (EFA) approach. Int J Construct Manage. 21:1–9. https://doi.org/10.1080/15623599.2021.1946901.
  • Goodarzizad P, Golafshani EM, Arashpour M. 2021. Predicting the construction labour productivity using artificial neural network and grasshopper optimisation algorithm. Int J Construct Manage. 21:1–17. https://doi.org/10.1080/15623599.2021.1927363.
  • Gorlewski B. 2015. Project effectiveness evaluation. Warsaw: Warsaw School of Economics.
  • Hajdu M, Bokor O. 2016. Sensitivity analysis in PERT networks: Does activity duration distribution matter? Autom Constr. 65:1–8. Vol
  • Halpin DW, Woodhead RW. 1998. Construction management. 2nd ed. Canada: John Wiley & Sons Inc.
  • JASPERS. 2008. Blue Book. Road infrastructure. Joint assistance to support projects in European regions. Warsaw: Ministry of Infrastructure.
  • Kalkhoran SHA, Liravi G, Rezagholi F. 2014. Risk management in construction projects. IJETT. 10(3):133–138.
  • Kasprowicz T. 2011. Analiza ryzyka przedsięwzięć budowlanych. Budownictwo i Inżynieria Środowiska, Zeszyt. 58(3/2011/III):233–240.
  • Kasprowicz T. 2015. Inżynieria przedsięwzięć budowlanych. In: Kasprowicz T, (red.) Inżynieria Przedsięwzięć Budowlanych, rekomendowane metody i techniki, wyd. PAN KIWiL, Sekcja. Warszawa: IPB; p. 10–20.
  • Konior J, Szóstak M. 2021. Course of planned, actual and earned cost curves of diverse construction investments. Int J Construct Manage. 21:1–12. https://doi.org/10.1080/15623599.2021.1942769.
  • Nahler G. 2009. Randomization. In: Dictionary of pharmaceutical medicine. Vienna: Springer; p. 154–155.
  • Parmenter D. 2015. Key performance indicators: Developing, implementing, and using winning KPIs. Copyright by David Parmenter. Hoboken, NJ: John Wiley & Sons, Inc.
  • Pham TQD, Le-Hong T, Tran XV. 2021. Efficient estimation and optimization of building costs using machine learning. Int J Construct Manage. 21:1–13. https://doi.org/10.1080/15623599.2021.1943630.
  • Porwal A, Parsamehr M, Szostopal D, Ruparathna R, Hewage K. 2020. The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders. Int J Construct Manage. 20:1–20. https://doi.org/10.1080/15623599.2020.1854930.
  • Radło MJ. 2015. Risk management in integrated management systems. Warsaw: Warsaw School of Economics.
  • Ritz G. 1994. Total construction project management. New York City: McGraw Hill Education.
  • Sadeh H, Mirarchi C, Shahbodaghlou F, Pavan A. 2021. BIM feasibility for small and medium-sized contractors and subcontractors. Int J Construct Manage. 21:1–10. https://doi.org/10.1080/15623599.2021.1947446.
  • Shafiei I, Eshtehardian E, Nasirzadeh F, Arabi S. 2020. Dynamic modeling to reduce the cost of quality in construction projects. Int J Construct Manage. 20:1–14. https://doi.org/10.1080/15623599.2020.1845425.
  • Skov NW. 1994. Finance & management. In: The American Model Applied to Polish Private Enterprise. Warsaw: PRET.
  • Sobieraj J, Metelski D. 2020. Identification of the key investment project management factors in the housing construction sector in Poland. Int J Construct Manage. 20:1–12. https://doi.org/10.1080/15623599.2020.1844855.
  • Stanitsas M, Kirytopoulos K. 2021. Investigating the significance of sustainability indicators for promoting sustainable construction project management. Int J Construct Manage. 21:1–26. https://doi.org/10.1080/15623599.2021.1887718.
  • Thneibat MM, Al-Shattarat B. 2021. Critical success factors for value management techniques in construction projects: case in Jordan. Int J Construct Manage. 21:1–22. https://doi.org/10.1080/15623599.2021.1908933.
  • Uher TE, Lawson W. 1998. Sustainable development in construction. Proceedings CIB World Building Congress, Gaevle, Sweden, 7–12 June 1998.
  • Ward SC, Chapman CB. 1995. Risk-management perspective on the project lifecycle. Int J Project Manage. 13/3:145–149.