AHP-DEMATEL modelling of consultant related delay factors affecting sustainable housing construction in Saudi Arabia

&

References

  • Abbasi O, Noorzai E, Jafari KG, Golabchi M. 2020. Exploring the causes of delays in construction industry using a cause-and-effect diagram: Case study for Iran. J Archit Eng. 26(3):1–16.
  • Abeku DM, Ogunbode EB, Salihu C, Maxwell SS, Kure MA. 2016. Project management and the effect of rework on construction works: A case of selected projects in Abuja metropolis Nigeria. Int J Finance and Manage Pract. 4(1):2360–7459.
  • Ahmed SM, Azhar S, Kappagantula P, Gollapudi D. 2003. Delay in construction: A brief study of the Florida construction industry. ASC Proceedings of the 39th Conference, Clemenson, South Carolina, April 10–12, 2013, p. 257–266.
  • Aibinu AA, Odeyinka HA. 2006. Construction delays and their causative factors in Nigeria. J Constr Eng Manage. 132(7):667–677.
  • Ajayi BO, Chinda T. 2022. Impact of construction delay-controlling parameters on project schedule: DEMATEL-system dynamics modeling approach. Front Built Environ. 8(799314):1–18.
  • Akogbe R, Feng X, Zhou J. 2013. Importance and ranking evaluation of delay factors for development construction projects in Benin. KSCE J Civ Eng. 17(6):1213–1222.
  • Alharbi F. 2020. Critical delay factors in housing Construction projects in Saudi Arabia: assessment and solutions [PhD thesis]. Nottingham Trent University. ‏‏FalahAlharbi2021.pdf. (ntu.ac.uk) [accessed 2021 August 25].
  • Alhazmi H, Alduwais AK, Tabbakh T, Aljamlani S, Alkahlan B, Kurdi A. 2021. Environmental performance of residential buildings: A life cycle assessment study in Saudi Arabia. Sustainability. 13(6):3542.
  • Al-Khalil MI, AL-Ghafly M. 1999. Important causes of delay in public utility projects in Saudi Arabia. J Construct Manage Econ. 17(5):647–655.
  • Al-Kharashi A, Skitmore M. 2009. Causes of delays in Saudi Arabian public sector construction projects. J Construct Manage Econ. 27(1):3–23.
  • Almutairi Y, Arif M, Khalfan MMA. 2017. Development of implementation strategies for offsite construction techniques in the Kingdom of Saudi Arabia. IJBCG. 6(1):12–27.
  • Alqahtany A, Mohanna AB. 2019. Housing challenges in Saudi Arabia: the shortage of suitable housing units for various socioeconomic segments of Saudi society. HCS. 22(3):162–178.
  • Alsuliman JA. 2019. Causes of delay in Saudi public construction projects. Alexandria Engin J. 58(2):801–808.
  • Al-Surf M, Balabel A, Alwetaishi M, Abdelhafiz A, Issa U, Sharaky I, Shamseldin A, Al-Harthi M. 2021. Stakeholder’s perspective on green building rating systems in Saudi Arabia: The case of LEED, Mostadam, and the SDGs. Sustainability. 13(15):8463.
  • Arantes A, Ferreira LMDF. 2021. A methodology for the development of delay mitigation measures in construction projects. Production Prod Plann Control 32(3):228–241.
  • Ardila F, Francis A. 2020. Spatiotemporal planning of construction projects: a literature review and assessment of the state of the art. Front Built Environ. 6(128):1–13.
  • Arditi D, Akan GT, Gurdamar S. 1985. Reasons for delays in public projects in Turkey. Construct Manage Econ. 3(2):171–181.
  • Assaf SA, Al-Hejji S. 2006. Causes of delay in large construction projects. Int J Project Manage. 24(4):349–357.
  • Assaf SA, Al-Khalil M, Al-Hazmi M. 1995. Causes of delays in large building construction projects. J Manage Eng. 11(2):45–50.
  • Aziz RF. 2013. Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Engin J. 52(3):387–406.
  • Bajjou MS, Chafi A. 2020. Empirical study of schedule delay in Moroccan construction projects. Int J Construct Manage. 20(7):783–800. 1484859
  • Balabel A, Alwetaishi M. 2021. Towards sustainable residential buildings in Saudi Arabia According to the conceptual framework of “Mostadam” rating system and vision 2030. Sustainability. 13(2):793.
  • Chan DWM, Kumaraswamy MM. 1997. A comparative study of causes of time overruns in Hong Kong construction projects. Int J Project Manage. 15(1):55–63.
  • Chandrusa S, Basha M. 2017. Rework management in construction projects and comparison with time and cost. Int J Engin Sci Comput. 7(6):13020–13025.
  • Chauhan A, Singh A, Jharkharia S. 2018. An interpretive structural modeling (ISM) and decision-making trail and evaluation laboratory (DEMATEL) method approach for the analysis of barriers of waste recycling in India. J Air Waste Manage Assoc. 68(2):100–110.
  • Durdyev S, Hosseini MR. 2019. Causes of delays on construction projects: a comprehensive list. IJMPB. 13(1):20–46.
  • El-Razek AME, Bassioni HA, Mobarak AM. 2008. Causes of delay in building construction projects in Egypt. J Constr Eng Manage. 134(11):831–841.
  • Enshassi A, Sundermeier M, Zeiter MA. 2017. Factors contributing to rework and their impact on construction projects performance. Int J Sustainable Construct Engin Technol. 8(1):12–33.
  • Faridi AS, El-Sayegh SM. 2006. Significant factors causing delay in the UAE construction industry. J Construct Manage Econ. 24(11):1167–1176.
  • Fuade DF, Rahmawati Y, Utomo C. 2017. Factor of design errors in construction project. IPTEK J Proceed Series. 6:284–288.
  • Fugar FDK, Agyakwah-baah AB. 1970. Delays in building construction projects in Ghana. CEB. 10(1–2):103–116.
  • Gebrehiwet T, Luo H. 2017. Analysis of delay impact on construction project based on RII and correlation coefficient: Empirical study. Proc Eng. 196:366–374.
  • Goel A, Ganesh LS, Kaur A. 2021. Sustainability assessment of construction practices in India using inductive content analysis of research literature. Int J Constr Manage. 21(8):802–817.
  • Gondia A, Siam A, El-Dakhakhni W, Nassar AH. 2020. Machine learning algorithms for construction projects delay risk prediction. J Constr Eng Manage. 146(1):04019085.
  • Gunduz M, Al-Naimi NH. 2021. Construction projects delay mitigation using integrated balanced scorecard and quality function deployment. Eng Constr Archit Manage. 29(5):2073–2105.
  • Gunduz M, Nielsen Y, Ozdemir M. 2013. Quantification of delay factors by using relative importance index (RII) method for construction projects in Turkey. J Manage Eng. 29(2):133–139.
  • Gunduz M, Tehemar SR. 2020. Assessment of delay factors in construction of sport facilities through multi criteria decision making. Produc Planning and Control. 31(15):1291–1302.
  • Hammad DB, Shafiq N, Nuruddin MF, Sodangi M, Umar AA. 2014. Criticality analysis of defects in civil engineering structures: Case of onshore process plant. Proc Eng. 77:53–60.
  • Hossain MA, Raiymbekov D, Nadeem A, Kim JR. 2019. Delay causes in Kazakhstan's construction projects and remedial measures. Int J Constr Manage. doi:10.1080/15623599.2019.1647635.
  • Iyer KC, Jha KN. 2005. Factors affecting cost performance: evidence from Indian construction projects. Int J Project Manage. 23(4):283–295.
  • Jussila J, Lähtinen K. 2020. Effects of institutional practices on delays in construction - Views of Finnish homebuilder families. Housing Studies. 35(7):1167–1193.
  • Kamble SS, Gunasekaran A, Parekh H, Joshi S. 2019. Modeling the internet of things adoption barriers in food retail supply chains. J Retail Consum Serv. 48:154–168.
  • Kazmi ZA, Sodangi M. 2021. Integrated analysis of the geotechnical factors impeding sustainable building construction - The case of the Eastern Province of Saudi Arabia. Sustainability. 13(12):6531.
  • Khoso AR, Khan JS, Faiz RU, Akhund MA. 2019. Assessment of change orders attributes in preconstruction and construction phase. Civ Eng J. 5(3):616–623.
  • Lessing B, Thurnell D, Durdyev S. 2017. Main factors causing delays in large construction projects: Evidence from New Zealand. JOMEINO. 1(2):63–82.
  • Love PED, Lopez R, Edwards DJ, Goh YM. 2012. Error begat error: Design error analysis and prevention in social infrastructure projects. Accid Anal Prev. 48:100–110.
  • Love PED, Smith J. 2003. Benchmarking, benchaction, and benchlearning: Rework mitigation in projects. J Manage Eng. 19(4):147–159.
  • Mahamid I. 2016. Analysis of rework in residential building projects in Palestine. JJCE. 10(2):197–208.
  • Mahamid I. 2022. Impact of rework on material waste in building construction projects. Int J Construct Manage. 22(8):1500–1507.
  • Mahdi I, Soliman E. 2021. Significant and top-ranked delay factors in Arabic Gulf countries. Int J Construct Manage. 21(2):167.
  • Marzouk MM, El-Rasas TI. 2014. Analyzing delay causes in Egyptian construction projects. J Adv Res. 5(1):49–55.
  • Mittal YK, Paul VK. 2018. Identification of critical factors for delay in metro rail projects in India. IJSRTM. 6(1):30–39.
  • Mosly I, Makki AA. 2021. The effects of multi-sociodemographic characteristics of construction sites personnel on perceptions of safety climate-influencing factors: The construction industry in Saudi Arabia. IJERPH. 18(4):1674.
  • Najafabadi E, Pimplikar SS. 2013. The significant causes and effects of delays in Ghadir 2206 residential project. IOSR-JMCE. 7(4):75–81. 9790/1684-0747581
  • Odeh A, Battaineh H. 2002. Causes of construction delay: traditional contracts. Int J Project Manage. 20(1):67–73.
  • Prasad KV, Vasugi V, Venkatesan R, Nikhil B. 2019. Analysis of causes of delay in Indian construction projects and mitigation measures. JFMPC. 24(1):58–78.
  • Samarah A, Bekr GA. 2016. Causes of delay in public construction projects in Jordan. Am J Engin Res. 5:87–94.
  • Sambasivan M, Soon YW. 2007. Causes and effects of delays in the Malaysian construction industry. Int J Project Manage. 25(5):517–526.
  • Saroha M, Garg D, Luthra S. 2021. Identification and analysis of circular supply chain management practices for sustainability: a fuzzy-DEMATEL approach. Int J Prod Perform Manage. doi:10.1108/IJPPM-11-2020-0613.
  • Sen MK, Dutta S, Kabir G. 2021. Development of flood resilience framework for housing infrastructure system: integration of best-worst method with evidence theory. J Clean Prod. 290:125197.
  • Shahsavand P, Marefat A, Parchamijalal M. 2018. Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol. ECAM. 25(4):497.
  • Shamsudeen M, Obaju NB. 2016. Effects of design errors on construction projects. Int J Sci Eng Res. 7(2):1099–1114.
  • Shen L, Yang J, Zhang R, Shao C, Song X. 2019. The benefits and barriers for promoting bamboo as a green building material in China - an integrative analysis. Sustainability 11:2493.
  • Sodangi M, Kazmi ZA. 2020. Integrated evaluation of the impediments to the adoption of coconut palm wood as a sustainable material for building construction. Sustainability. 12(18):7676.
  • Sodangi M, Salman AF, Saleem M. 2018. Building information modeling: Awareness across the subcontracting sector of Saudi Arabian construction industry. Arab J Sci Eng. 43(4):1807–1816.
  • Tafazzoli M, Shrestha PP. 2017. Investigating causes of delay in U.S. construction projects. ASC Annual International Conference Proceedings, 53, p. 611–621.
  • Tahir MM, Haron NA, Alias AH, Diugwu IA. 2019. Causes of delay and cost overrun in Malaysian construction industry. Lecture Notes Civ Eng. 9:47–57.
  • Trigunarsyah B, Santoso TP, Hassanain MA, Tuffaha F. 2019. Adopting the industrialised building system in Saudi Arabia: constraints and enablers. Infrastructure Asset Manage. 6(3):185–194.
  • Vacanas Y, Danezis C. 2021. An overview of the risk of delay in Cyprus construction industry. Int J Construct Manage. 21(4):369–381.
  • Yap JBH, Goay PL, Woon YB, Skitmore M. 2021. Revisiting critical delay factors for construction: analysing projects in Malaysia. Alexandria Eng J. 60(1):1717–1729.
  • Zidane YJ, Andersen B. 2018. The top 10 universal delay factors in construction projects. IJMPB. 11(3):650–672.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.